Dedicated Land Surveyor desiring to bring expertise developed over 12 year career and take on new position focused on improving processes and updating maps. Forward-thinking, strategic and highly organized with proven skills and reputation for excellence. Successful at organizing, deploying and overseeing projects while resolving routine and critical concerns in polished and professional fashion.
Project: Construction of flood prevention Scheme (FPS-Phase 3)
Achievement
Successfully implemented an efficient and effective system that manages water flow, prevents flooding, improves water quality, and supports sustainable land use.
By conducting detailed topographic surveys that identify natural drainage patterns, culverts, and other infrastructure, and calculated the required capacity of the systems to handle anticipated water volumes.
Responsibilities
Project Name: Construction & Upgrade Al Sailiya Road Contract-1 west of New Rayyan R/A to East of Bani Hajer R/A – Doha, Qatar (Pro-C1 – Rayyan Road Upgrade) Construction & Reinstatement of Lateral Interceptor Sewers LIS-01
Achievement
My achievement was the ability to provide accurate measurements, establish precise control points, determine optimal alignments, stake out the project on-site, and ensure compliance with legal requirements. My expertise and attention to detail contribute significantly to the success of the project.
Responsibilities
Project: Slab Track, Doha Metro Project
Achievement
Ability to provide accurate and precise data throughout the planning, design, and construction phases and ensures that the underground infrastructure is mapped correctly, minimized risks and facilitated the successful implementation of the project.
Responsibilities
Project: Construction Kahramaa Substations and Cable Route in Duhail, Al Soudan and Al Sailiya
Achievement
Provided accurate boundary determination, conduct detailed topographic surveys, map utilities, and ensure compliance with legal and regulatory requirements. Mine expertise and precision significantly contribute to the successful completion of the project while ensuring safety, efficiency, and adherence to relevant standards.
Responsibilities
Project: Multipurpose Hall at Al Sadd Sports Club Olympic Committee
Achievement
Produce detailed information (subsequently analyzed by planners, builders and cartographers).
Use a range of equipment to produce surveys such as Trimble GPS, Total Station, Laser Scanner and all types of Leveling machines.
Analyze information thoroughly before it is handed over to the professionals.
Measure the ground, including aspects such as small and large-scale distances, angles and elevations.
Gather data on the earth’s physical and man-made features through surveys.
Think creatively to resolve practical planning and development problems.
Interpret data using maps, charts and plans.
Responsibilities
Project: Benin-Onitsha Integrated Power Project and IHE-UKWU 43.6km Road Network
Responsibilities
GIS data development
Reading and learning are fundamental processes that play a crucial role in my life by acquiring knowledge. Learning has help with the acquisition of new information, skills, and understanding through various methods. It has formed the basis for my personal growth, intellectual stimulation, and educational advancement.