Proven Construction Superintendent with a track record of enhancing project efficiency and quality at ARCO Construction. Skilled in construction scheduling and fostering strong client relations, I excel in supervising subcontractors and ensuring OSHA compliance. My leadership has consistently resulted in repeat business and positive industry referrals.
February 2019: Centene Community Ice Center, Maryland Heights MO; 83 Million Dollars, 4 rink, 300,000 square feet, tilt up and structural steel construction.
October 2019: Fogarty Services, Arnold MO; 4 Million dollars, 36,000 square feet, tilt up and structural steel construction.
June 2020: Ovation Heartwood, Omaha Nebraska; 68 Million Dollars, 2 buildings; 124,000 square feet Assisted living and Memory Care Facility; 209,000 square foot Independent Living Apartment Complex; Structural Steel and Panelized wood assemblies.
March 2022: Royal Canin TI, Pontoon Beach IL; 3 Million Dollars, 740,000 Square Feet Existing warehouse, Added 37 new dock doors with levelers, 2 office complexes at opposite ends of the building. Drywall and metal studs, Extensive concrete layout and cutting. Project was scheduled for 28 weeks, We completed in 15 weeks and broke the company record for Profit Percentage 26.8%
July 2022: Byerly RV, Eureka MO; 14 Million Dollars, 20 acre site, 9 acres Secure outdoor storage lot, 2 buildings, 28,000 Square feet Maintenance Facility, 88,000 square feet RV Storage Warehouse. Tilt up and structural steel construction.
June 2023: Gateway Studios, Chesterfield MO; 80 Million Dollars; 303,000 Square Feet, 5 studios, 1 warehouse, 2 support buildings, 40,000 square foot Steel Structure office complex. On June 21, 2024 Arco National Construction Executives ordered my self and another Superintendent to shut off power, secure and inventory materials, and begin to demobilize from the site. I am not at liberty to discuss any further details of this project.
July 2024: I took my sabbatical which is four working weeks
August 2024: I spent then next 3 moths fixing various items in offices throughout the St. Louis Metro, I was able to fill in on 2 projects for folks vacations,
November 2024: Premium Waters Inc. Allentown PA; 67,000 square feet, Built in 1978, Ruptured discharge main under the north western corner of the facility, Pouring nearly 400,000 a month under the building pad 10'4" below finish floor, inject compacted grout under the affected square footage to stabilize soil conditions, reroute discharge main, grout fill compromised piping, remove and replace 7,500 square of 8" slab, tuck point and repair exterior facade.
All terrain forklift
aerial lift
forklift
scaffold erector
OSHA 10
OSHA 30
All terrain forklift
aerial lift
forklift
scaffold erector
OSHA 10
OSHA 30