Professional Summary
Overview
Work History
Education
Skills
Timeline

William Cochran-Cline

Vision Painting
Tahlequah,OK
28
years of professional experience

Lead Painter experienced in crew supervision and surface preparation. Achieved high-quality interior and exterior finishes through strong leadership, safety awareness, and efficient workflow coordination. Focused on delivering dependable jobsite results and training crews to meet project standards.

Work History

Lead Painter

4 Years 1 Month
Vision Painting | 10.2022 - Current
  • Supervised painting crews to ensure quality, safety, and adherence to schedule across job sites.
  • Prepared surfaces by scraping, sanding, patching, and caulking for even coating results.
  • Helped supervise painting crews to keep quality, safety, and schedule on track across job sites.
  • Reviewed completed work, corrected defects, and ensured alignment with client expectations and specifications.
  • Coordinated material staging, tool readiness, and work sequencing to enhance daily production efficiency.
  • Coordinated material staging, tool readiness, and work sequencing to support efficient daily production.

Tile Setter Helper

5 Months
BVB Tile | 03.2020 - 08.2020
  • Measured and cut tile using hand and power tools to match precise project dimensions.
  • Mixed mortar, thinset, and grout to required specifications for dependable application quality.
  • Assisted tile setters with surface preparation, layout, and material handling for consistent installation work.
  • Cleaned surfaces, removed debris, and prepped substrates to ensure proper tile adhesion.
  • Loaded, unloaded, and transported tile materials safely to maintain steady crew productivity.
  • Organized tools, supplies, and work areas to support efficient jobsite workflow.

Painter

9 Months
Mid-south Painting | 03.2014 - 12.2014
  • Applied paint, stain, and coatings using brushes, rollers, and spray equipment with consistent coverage.
  • Prepared interior and exterior surfaces through scraping, sanding, patching, and priming for durable finishes.
  • Inspected surfaces for defects, corrected imperfections, and maintained quality standards throughout finishing work.
  • Mixed custom colors and matched existing finishes to support accurate restoration and customer specifications.
  • Repaired drywall, caulking, and minor surface damage before coating application to improve finish results.
  • Protected furniture, floors, fixtures, and adjacent surfaces using masking, drop cloths, and containment methods.

Painter

11 Months
Cox Painting | 04.2013 - 03.2014
  • Coordinated worksite setup, material staging, and cleanup to keep projects organized and efficient.
  • Painted surfaces using brushes, spray guns, and paint rollers.
  • Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
  • Painted indoor areas such as hallways, bathrooms, and lobbies.
  • Trained crew members on safe ladder use, surface preparation, and proper coating application techniques.
  • Maintained a clean and organized workspace, minimizing disruptions for clients during projects.

Lead Painter

1 Year 5 Months
Basham Construction | 11.2011 - 04.2013
  • Applied interior and exterior coatings using brushes, rollers, and sprayers with precise finish standards.
  • Inspected completed work to correct defects and ensure client expectations and specifications were met.
  • Mixed paints and matched colors accurately to maintain consistency across rooms and project phases.
  • Prepared surfaces through scraping, sanding, patching, and caulking for consistent coating results.

Painter

8 Months
World Wide Restoration | 03.2011 - 11.2011
  • Applied primer, paints, varnishes and lacquers to walls and surfaces using traditional and sprayer methods.
  • Operated power sprayers and hand tools to prepare and paint large areas.
  • Prepared trim, walls and ceilings for painting by cleaning, smoothing, and priming.
  • Prepared surfaces for painting by cleaning, sanding, and repairing defects to ensure smooth results.
  • Applied putty, wood filler, spackling, and caulks to prep uneven surfaces and fill in holes.

Painter Supervisor

11 Years
Cline Painting | 01.1999 - 01.2010
  • Supervised painting crews to maintain quality, safety, and production standards.
  • Scheduled daily workloads and assigned tasks based on project priorities and skill levels.
  • Trained painters on surface preparation, coating application, and jobsite safety procedures.
  • Inspected completed work to verify finish consistency, coverage, and customer specifications.
  • Coordinated material orders, equipment availability, and jobsite readiness for efficient workflow.
  • Resolved on-site issues to keep projects on schedule and minimize rework.

Education

No Degree - Elementary Education

North Eastern University | Tahlequah, OK
  • Dean's List [Semester and Year]

Associate of Science - General Studies

Connors State College | Warner, OK

Skills

Surface Preparation Techniques
Sprayer Operation Techniques
Interior Trim Installation
Exterior painting
Crew oversight
Interior painting
Airless spraying
Exterior Trim Installation
Drywall installation

Timeline

Lead Painter

Vision Painting
10.2022 - CurrentRead More

Tile Setter Helper

BVB Tile
03.2020 - 08.2020Read More

Painter

Mid-south Painting
03.2014 - 12.2014Read More

Painter

Cox Painting
04.2013 - 03.2014Read More

Lead Painter

Basham Construction
11.2011 - 04.2013Read More

Painter

World Wide Restoration
03.2011 - 11.2011Read More

Painter Supervisor

Cline Painting
01.1999 - 01.2010Read More

North Eastern University

No Degree from Elementary Education
Read More

Connors State College

Associate of Science from General Studies
Read More
William Cochran-Cline