Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

William Gueits

Riverside,CA

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

15
15
years of professional experience

Work History

Quality Control Shipping and Receiving

Better Nutritionals
02.2021 - 02.2023
  • Enhanced shipping efficiency by implementing streamlined processes and procedures.
  • Pulled, verified, and packaged items for shipment.
  • Operated forklifts, lift trucks, and hand trucks to move items around warehouse.
  • Communicated with vendor representatives to resolve damaged shipments and item shortages.
  • Reduced worker accidents by implementing improved safety standards and monitoring procedures.
  • Conducted research to address shipping errors and packaging mistakes.
  • Tracked production and quality control systems to proactively identify deficiencies.

Quality Control Line Inspector

Del Real Foods
04.2018 - 01.2021
  • Improved product quality by meticulously inspecting and identifying defects on the production line. and assist with monitoring production.
  • Ensured compliance with industry regulations by adhering to strict inspection guidelines and protocols. follow and maintain GMP,HACCP,SQF,FDA,USDA standards
  • Upheld a high standard of cleanliness in the workspace, abiding by both company policies and regulatory requirements for sanitation practices in industrial environments.
  • Monitored product quality at all stages of production process.
  • Sampled products to verify compliance with standards.

Quality Assurance Technician

Parker Hannifan Mold Injection Division
05.2008 - 03.2018
  • Improved product quality by conducting thorough inspections and identifying defects in the manufacturing process.
  • Increased overall product reliability through diligent monitoring of equipment calibration and maintenance schedules.
  • Maintained accurate documentation of all quality-related activities, facilitating easy access to records when needed.
  • Implemented statistical process control techniques, allowing for real-time monitoring and rapid response to deviations from target specifications.
  • Performed thorough inspections of incoming materials and outgoing products.
  • Addressed non-conformance issues, pausing production to correct errors.
  • Performed standard first article inspections and random sampling inspections to verify adherence to customer standards.

Education

High School Diploma -

La Puente High School
La Puente, CA
06.1988

Skills

  • Lean Principles
  • Warehouse Operations
  • Safety Compliance
  • Shipping Procedures

Languages

Spanish
Limited Working

Timeline

Quality Control Shipping and Receiving

Better Nutritionals
02.2021 - 02.2023

Quality Control Line Inspector

Del Real Foods
04.2018 - 01.2021

Quality Assurance Technician

Parker Hannifan Mold Injection Division
05.2008 - 03.2018

High School Diploma -

La Puente High School
William Gueits