Detail-oriented professional in the power sector with a strong track record of delivering accurate work. Expertise in verifying documentation to eliminate errors and reduce rework. Proven ability to maintain high standards of quality and efficiency in all tasks.
Overview
5
5
years of professional experience
11
11
Certifications
Work History
Private Contractor
Multiple
08.2025 - Current
Inspected completed work to ensure compliance with industry regulations and safety standards.
Collaborated with clients to develop project scopes that met specific needs and budget constraints.
Monitored project budgets, ensuring expenditures aligned with financial forecasts.
Developed and executed strategic sales plans to achieve sales targets in designated territory.
Lead Journeyman
Coastal
06.2024 - 07.2025
Provided hands-on training and mentorship to new team members to enhance their skills and confidence.
Evaluated potential risks associated with each job before beginning work.
Maintained high standards of quality assurance to ensure reliability and safety of all installations.
Reviewed blueprints and schematics prior to starting any project.
Implemented process improvements to optimize workflow and enhance team productivity.
Established and enforced safety guidelines to foster a risk-aware work environment.
Led crews in the installation and maintenance of electrical substations to ensure operational efficiency.
Checked electrical components to identify defects and hazards and make necessary adjustments.
Journeyman
SMS Energy
11.2023 - 06.2024
Responsibity include specializing in high-voltage electrical substation installation, upkeep, and repair
Job specifics are to guide the crew in analyzing and deciphering schematics and plans
Demonstrate capacity to operate both individually and together to guarantee the dependability of electrical systems
Strong technical proficiency paired with an emphasis on efficiency and safety
Executed high-voltage electrical installations while adhering to safety compliance standards.
Utilized specialized tools for precise installation of electrical components, enhancing reliability.
Reviewed blueprints to plan installations and modifications based on project specifications.
Substation Tech 3
Timberline
08.2022 - 11.2023
Responsibilities include but not limited to; perform updates to existing sub stations
Install underground pipes and pull wire from control house to device location
Remove old equipment and install new equipment including but not limited to CCVT, PT and breakers
Calculate the bending points and angles for bus installations
Building frames and pouring concrete pads and foundations
Installing ground grid and cable trays for new wire
Modifying existing steel structures to match the new design
Install new gang switches and disconnects and adjust them accordingly
Preform grading and trench digging on mini ex and Skid Steer when applicable
Rig for heavy lifts
Install junction boxes and cabinets for new wire connections
Able to read drawings and diagrams
Executed upgrades to existing substations, enhancing overall system reliability and performance.
Assisted in the commissioning of newly installed substations.
Responded quickly to emergency situations involving electrical faults or breakdowns.
Inspected substation equipment to ensure proper operation and compliance with industry standards.
Implemented grounding techniques to ensure safety and compliance with industry standards.
Foreman/Journeyman
Lee Electrical Construction, Inc.
08.2020 - 08.2022
Maintenance Foreman responsibilities included: Re-closers; Oil- Based Circuit Breakers and Regulators; clean the Jumpers; perform MEG test on wires going to regulators and breakers
Performed test on breakers and transformers
Took apart breakers to perform maintenance which included checking and circulating the oil along with cleaning contacts
Pad Mount refurbishment program for co-ops which included PMH, PME,3 phase transformers
Journeyman 2 responsibilities included: Perform substation construction which includes installing structural supports; I beams; installation of switch mechanisms along with putting together A-frames and dead end structure
Placement of regulators in proper position, as well as hooking the low side jumpers up to the regulators
Installing ground grid and connecting it to the structure
Supervision of subcontractor’s installation of 115KVand 230kv transformer pads for substation
Installing and adjusting gang switches and vertical breaks
Installed underground pipe for fiber optics and feeders
Site preparation which includes leveling and placement of gravel
Plugging in and checking relay panels with diagrams
Bending and installing bus
Coordinated with project managers to align team efforts with project timelines and objectives.
Supervised daily operations of electrical installation projects, ensuring adherence to project specifications.
Resolved on-site issues promptly to minimize downtime and maintain project momentum.
Education
HIGH SCHOOL DIPLOMA - Engineering Design And Concepts
MILL CREEK HIGH SCHOOL
Hoschton, GA
05.2018
Skills
Computer proficiency
Adaptability and flexibility
Critical thinking
Process optimization
Electrical installation
Dependability
Blueprint interpretation
Risk assessment and analysis
Quality assurance
Client collaboration
Project budgeting and management
Employee training and development
Effective communication skills
First aid and CPR certification
Operations oversight
Certification
Construction finance
Timeline
Private Contractor
Multiple
08.2025 - Current
Lead Journeyman
Coastal
06.2024 - 07.2025
Journeyman
SMS Energy
11.2023 - 06.2024
Substation Tech 3
Timberline
08.2022 - 11.2023
Foreman/Journeyman
Lee Electrical Construction, Inc.
08.2020 - 08.2022
HIGH SCHOOL DIPLOMA - Engineering Design And Concepts