Dynamic Sales Lead Manager with a proven track record at Largo Piping & Gas, excelling in sales strategies and relationship building. Increased sales productivity by identifying process bottlenecks and implementing solutions. Skilled in client relationship management and employee motivation, driving significant revenue growth through strategic initiatives and effective team leadership.
Over (4) years CEI and
construction industry experience; with
primary focus in bridge and roadway
inspection and verification testing. Mr. Darby
has knowledge of utilities, earthwork
activities, drainage installation, asphalt
paving inspection, concrete structure
Construction Inspection,
inspection associated with major highway
construction, as well as environmentally
friendly construction involving state and/or
federally protected land sites. His regular
duties include material testing for earthwork,
concrete and asphalt. He is also familiar with
the requirements established in the field
standards for final estimates, use of LIMS and
IMSA Traffic Signal
MAC, Site Manager, FDOT Design Indexes
Inspector
and the CPAM.
Mr. Darby served on the FDOT D-1, Diamond Interchange at University Parkway in Sarasota, FL. This
$74.5-million Project consists of constructing the First of its Kind in Florida and the largest in the nation Diverging Diamond
Interchange. It will have a total of 10 lanes approaching the
interchange, and 12 lanes under I-75. The project includes the
replacement of the existing bridges over University Parkway and
widening 4 bridges on I-75, as well as reconstruction and widening of approximately 4 miles along I-75 including realignment of on-ramps and off-ramps. The project also includes widening
University Parkway from Cattleman Road to Market Street, new
sidewalks, bike lanes, ponds and drainage improvements, new
lighting, signalization and ITS, MSE walls and the construction of a noise wall on the East side of I-75. Other Jobs Include I-75 at
Jones loop widening project, SR 70 at I-75, and New Bridge
Construction over little lake Harris. FDOT Interstate
Construction Project Manager: Marlena Gore, (863) 272-5008.
Mr. Darby served Team Fishel leading crews
installing new gas lines. Responsibilities included utility locate
notifications/services, safe equipment operation, job costing and
materials acquisition, as well as MOT coordination for operations.
Work primarily consisted of underground installations, gas service fusions, taping live lines, directional
boring and safety testing.
Mr. Darby served mechanical contractor CSP Reply Reply all Forward
Plumbing. His responsibilities included
installation of both and interior and underground gas and water lines for both residential and commercial
developments. Cameron managed a 3-person crew performing GM and WM installations, and was
involved with protection of other existing utilities, service meter installs, and repair and installation of gas
appliances. He also assisted in job costing and material estimates, as well as, training new employees.
Mr. Darby served mechanical contractor Clearwater Gas System. His responsibilities included
Starred Contacts More
installation of both interior and underground gas and water lines for both residential and commercial
developments, performing locates for underground utility lines and installation of new meters. He also converted and serviced gas appliances, repaired and performed multiple pipe fusions including electro,
socket and butt fusions. Additional duties included training of new employees, overseeing jobsite crews, job
costing and handling job material buy-outs.