Cenaida Martinez
Whiting,IN
i was a machine operator i had to have a certain amout of production by the end of my shift i loaded and unloaded the machine as needed i packed all the product and loaded 60 boxes a pallet 5 rows of 12 boxes per row.
I got my GED back in 2011