Dedicated Pipefitter with background in job coordination and worksite setup. Knowledgeable in safety processes, regulations and pipe selection. Offering successful career history comprising more than 18 years. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
18
18
years of professional experience
Work History
Pipefitter Foreman
Thermflo
875 Busch Pkwy Buffalo Grove, IL
03.2011 - 08.2022
Followed safe work practices, which included fall protection and personal protective equipment. Osha 30 certified.
Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
Threaded pipes using piping machines.
Coordinated movement of materials and equipment to job sites.
Installed piping for plumbing systems for domestic and HVAC lines.
Trained and supervised apprentices and offered specific recommendations to improve work quality.
Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
Reviewed and studied blueprints to double-check installation and implementation project requirements.
Pipefitter
Controlled Systems Corp.
Lake Bluff, Il 60044
05.2008 - 03.2011
Tested piping systems for leaks by increasing pressure in pipes and observing gauges attached to pipes for indication of leaks.
Threaded pipes using piping machines.
Located and repaired or replaced worn and broken components to enhance system functionality and durability.
Planned pipe system layout, installation and repair according to specifications.
Conducted thorough inspects and tests of previously installed systems to locate and correct faults.
Pipefitter Apprentice
Thermflo
Wheeling, IL
08.2004 - 05.2008
Followed safe work practices, which included fall protection and personal protective equipment.
Fabricated, assembled, installed and maintained piping systems.
Threaded pipes using piping machines.
Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.
Measured, cut, threaded and assembled new pipe to place assembled pipe in hangers or other supports.
Mounted brackets and hangers on walls and ceilings to hold pipes in place.
Cut or drilled holes in walls or floors to accommodate passage of pipes.
Set sleeves or inserts to provide support for pipes.
Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
Measured, threaded and cut materials to correct angles.
Eliminated risks by correctly identifying potential safety hazards.
Cut and drilled holes in walls to permit passage of pipes.