Summary
Overview
Work History
Education
Skills
Certification
Reference’s
Timeline
Generic

Colton Bell

Lake Stevens,Washington

Summary

Dynamic professional with extensive experience in general construction, excelling in project coordination and quality control. Proven track record of enhancing customer satisfaction and reducing installation errors through effective relationship building and rigorous standards. Skilled in blueprint analysis, ensuring seamless project execution and fostering team collaboration for optimal results.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Lead Installer

Parr Lumber
Marysville, WA
04.2024 - Current
  • Achieved high customer satisfaction through efficient, accurate installation processes.
  • Reduced installation errors by implementing rigorous quality control measures.
  • Cultivated strong client relationships via clear communication and professionalism during installations.
  • Managed inventory to ensure adequate stock levels while minimizing overstock costs.
  • Facilitated team collaboration by clearly communicating project goals and requirements.
  • Maintained detailed records of installations for seamless transition to service departments.

Journeyman Glazier

Local 188
Seattle, WA
01.2019 - 09.2023
  • Exhibited composure in hazardous environments, prioritizing team safety and operational efficiency.
  • Partnered with team members for efficient execution of large-scale glazing installations.
  • Ensured seamless integration of glazing components by coordinating with multiple construction trades.
  • Interpreted technical blueprints and specifications to support project success.

Foreman

Window Installation Specialist.
Bellevue, WA
12.2016 - 01.2019
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.

Framer's Helper

Lafond Framing Inc.
Everett, WA
08.2015 - 11.2016
  • Organized workspace at the end of each day to ensure an efficient start for subsequent shifts or tasks.
  • Ensured timely project completion with diligent work ethic and effective communication with team members.
  • Optimized resource allocation by utilizing scrap materials whenever possible without compromising structural integrity or aesthetic appeal.
  • Enhanced framing efficiency by assisting in the measuring, cutting, and assembling of wood and metal materials.
  • Anticipated potential issues during the framing process by carefully reviewing plans prior to starting work on projects.

Education

Snohomish High School
Snohomish, WA

Skills

  • Relationship building
  • Project coordination
  • Quality control
  • Blueprint analysis
  • Diligence
  • Professional growth

Certification

MEWP Operator.

Swing stage and scaffold awareness.

Reference’s

Parr lumber - jason Scott +1 (253) 905-3244

Local 188 - William Hensmen +1 (253) 861-2386

Window installation specialist - John Derose jr (425) 343-3741

Timeline

Lead Installer

Parr Lumber
04.2024 - Current

Journeyman Glazier

Local 188
01.2019 - 09.2023

Foreman

Window Installation Specialist.
12.2016 - 01.2019

Framer's Helper

Lafond Framing Inc.
08.2015 - 11.2016

Snohomish High School