Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Daniel Valenzuela

Industrial Psychology / Paint Engineering Specialist
Hermosillo,Son

Summary

Paint engineering specialist with 15 years of experience within paint shop vehicle operations. Highly committed to continuous improvement and cost-saving strategies across paint department subsystems. Experience in vehicle design & launch, paint facilities (Greenfield) implementation and paint materials launches.

Detail-oriented professional with strong troubleshooting capabilities and customer-oriented attitude.

Overview

15
15
years of professional experience
2
2
years of post-secondary education
2
2
Languages

Work History

Paint Facilities Implementation Specialist CSAP GF

Ford Motor Company
08.2022 - Current
  • Established clear project milestones and deliverables, ensuring timely completion of tasks and transparent communication to stakeholders.
  • Evaluated third-party vendors for compatibility with existing systems during integration planning phases.
  • Conducted detailed requirements analysis for each project, creating customized solutions based on client needs.
  • Provided ongoing support to clients post-implementation, addressing any concerns or issues promptly and professionally.

Paint Facilities Implementation Specialist PMR PM

Ford Motor Company
01.2020 - 08.2022
  • HSAP Paint mix room and sealer systems F&Ts launch.
  • Streamlined implementation processes by effectively collaborating with cross-functional teams and paint suppliers.
  • Coordinated resources efficiently across projects, balancing workload and maximizing productivity among team members.
  • Managed multiple implementation projects concurrently, maintaining strict deadlines without compromising quality or scope.

Paint manufacturing development engineer

Ford Motor Company
09.2016 - 01.2020
  • Paint launch and implementation lead for 2019 - 2024 model years, across Ford NA (Mexico) plants.
  • Paint facilities and tooling development & implementation at Hermosillo brownfield and greenfield paint shops.
  • Paint mix and automated sealer systems project manager for Hermosillo greenfield paint shop.
  • New phosphate and e-coat facilities implementation and commissioning.
  • Assisted in the successful implementation of lean manufacturing principles, driving continuous improvement efforts across the facility.
  • Conducted root cause analysis investigations for manufacturing defects, implementing corrective actions to prevent recurrence.
  • Implemented robust quality control measures throughout all stages of production, reducing scrap rates and minimizing rework efforts.

Paint Spray Booths and Color Harmony Supervisor

PPG Industries
02.2012 - 09.2016
  • Analyzed production and quality performance, coordinated activities with various suppliers and contractors associated with the paint shop, and work with the production staff to continuously improve overall performance.
  • Improved customer satisfaction with timely response to inquiries, addressing concerns, and finding effective solutions.
  • Streamlined operations for increased efficiency through regular process reviews and implementing necessary changes.

Phosphate and E-coat Systems Supervisor

PPG Industries
09.2009 - 01.2010
  • Recommended design modifications to eliminate paint constraints machine and system malfunctions
  • Provided technical direction on paint engineering projects and initiatives to other costumer, engineers, designers, and technicians.
  • Collaborated with cross-functional teams to develop comprehensive technology solutions for business needs.
  • Reduced downtime for critical systems with proactive maintenance and timely troubleshooting.

Paint mix and sealer systems technical service

PPG Industries
09.2009 - 01.2010
  • Provided technical direction and advice on circulatory systems installation, commissioning, and operation.
  • Improved production efficiency through proper maintenance and calibration of paint mix & sealing equipment.
  • Developed manufacturing efficiency by analyzing and planning work flow, space requirements, and equipment layout.


Education

Industrial Psychology -

Universidad Del Desarollo Professional
Hermosillo, Mexico
01.2013 - 05.2015

Specialty in Business Management -

Universidad Del Desarollo Profesional
05.2001 -

Skills

Effective Communication

Accomplishments

  • New models paint tooling, 2 mils. cost saving project by designing and implementing common tooling across two different new models (SUV / Truck).
  • New model design modification for cost avoidance, 7 mils. cost avoidance for a new model by designing and implementing a special paint tool.
  • HSAP Bronco sport and Maverick product feasibility study & launch.
  • HSAP Greenfield new paint mix facility implementation and product launch.
  • CSAP Greenfield facility implementation and product launch.


Timeline

Paint Facilities Implementation Specialist CSAP GF

Ford Motor Company
08.2022 - Current

Paint Facilities Implementation Specialist PMR PM

Ford Motor Company
01.2020 - 08.2022

Paint manufacturing development engineer

Ford Motor Company
09.2016 - 01.2020

Industrial Psychology -

Universidad Del Desarollo Professional
01.2013 - 05.2015

Paint Spray Booths and Color Harmony Supervisor

PPG Industries
02.2012 - 09.2016

Phosphate and E-coat Systems Supervisor

PPG Industries
09.2009 - 01.2010

Paint mix and sealer systems technical service

PPG Industries
09.2009 - 01.2010

Specialty in Business Management -

Universidad Del Desarollo Profesional
05.2001 -
Daniel ValenzuelaIndustrial Psychology / Paint Engineering Specialist