Summary
Overview
Work History
Education
Skills
Training
Certification
Timeline
Generic

David Briggs

Pulaski,NY

Summary

Seasoned Foreman with extensive experience in AC&R and construction supervision, notably at Ice Builders. Excelled in managing large-scale projects, demonstrating top-notch decision-making and effective communication. Skilled in workplace safety and work planning, successfully led diverse teams to achieve project milestones with commendable efficiency.

Overview

26
26
years of professional experience
1
1
Certification

Work History

Foreman/Refrigeration and Air Conditioning Technician

Ice Builders
06.2018 - Current
  • 40-70 hours weekly
  • Assist in building, shipping, and wiring of the refrigeration package.
  • Responsible for installing, charging, and starting up refrigeration units.
  • Successfully completed multiple large-scale projects for reputable contractors.
  • Manage multiple projects in all varying phases of construction at the same time.
  • Pre-inspections, planning, organizing, directing, controlling, and evaluating construction projects from start to finish according to schedule, specifications, and budget.
  • Preparing contracts, and negotiating revision changes and additions to contractual agreements with architects, clients, suppliers, and subcontractors.
  • Hiring and supervising the activities of subcontractors and subordinate staff.

Service Tech/ Start-up

Cimco Refrigeration
10.2015 - 06.2018
  • 40-70 hours weekly
  • Maintained refrigeration plants through service contracts.
  • Part of the start-up crew for ice rinks consisted of inspecting the package, comparing it to blueprints, charging it with refrigerant, checking the wiring (control and up to 480v), troubleshooting, and operating the package.
  • Mycom I Series screw and M Series recip compressors.
  • Self-motivated, with a strong sense of personal responsibility.
  • Proven ability to learn quickly and adapt to new situations.

Service Technician

Republic Refrigeration
09.2013 - 10.2015
  • 40-90 hours weekly
  • Start up new equipment and plants built by our construction crews.
  • Operate NH3, CO2, and Freon-type equipment.
  • Rebuild or repair compressors, pumps, and anything in the refrigeration circuit.
  • Explained diagnostic findings to customers, and outlined repair or service options.
  • I installed new equipment and explained the operation and routine maintenance protocols to customers.
  • Responded to customer inquiries quickly and professionally to increase satisfaction.

First Class Petty Officer (E6)-Machinist's Mate

U.S. Navy Reserve
01.2009 - 01.2014
  • Part of outside repair, assisted contractors with AC&R equipment while ships where in shipyard

Mayekawa (Mycom)
08.2013 - 10.2013
  • 40-50 hours weekly
  • Assist end users with problems and/or concerns regarding their Mycom compressors.
  • Start-ups of new Mycom compressor packages.

Plant Engineer

ReddyIce
02.2010 - 08.2013
  • 40-60 hours weekly
  • Supervisor to the production crew.
  • Repaired and maintained the mechanical aspects of all equipment.
  • Maintained and operated a 4000# ammonia system.

Waterfront Security

U.S. Navy
Bangor, WA
10.2005 - 11.2008
  • As oil response team leader
  • Chief engineer of small boats - Maintaining the diesel engines and all shipboard equipment
  • Deck Leader supervisor

NPDB 3

U.S. Navy
Camp Bucca, Iraq
02.2007 - 02.2008
  • Managed military team responsible for the custody of 270 detainees

USS Abraham Lincoln

U.S. Navy
Bremerton, WA
09.2003 - 01.2005
  • Supervised staff in the air conditioning and refrigeration shop
  • Operated, maintained, and repaired ship-wide refrigeration and air conditioning systems
  • Maintained 900 ton York chiller units, refrigeration plants, compressor and evap units
  • Responsible for production of potable water for up to 9,000 personnel

USS Nassau

U.S. Navy
Norfolk, VA
06.1999 - 01.2003
  • Engine room repair and maintenance duties with requisite training in firefighting techniques
  • Throttle control responsibility amphibious assault ship
  • Operated and maintained ballast systems and aircraft & weapons elevators
  • Worked on numerous types of pumps, valves, and ship propulsion equipment
  • Trained and mentored 2-13 individuals per training session covering the 'Tag Out Safety' program, with commendations for accident-free operations and outstanding performance

Education

High School -

Pulaski Jr/Sr High School
Pulaski, New York
01.1997

Skills

  • AC&R
  • Boilers
  • Job planning
  • Generators
  • Bearings
  • Valves
  • Compressors
  • Decision-making
  • Effective communication
  • Workplace safety
  • Construction supervision
  • Work planning and prioritization

Training

  • Journeyman for UA Local 267
  • Ship Service Turbine Generator Repair School, 03/01/02, Norfolk, Virginia
  • Air Condition and Refrigeration School (EPA Universal Qualified - HVAC), 01/01/03, Norfolk, Virginia
  • Oil Spill Response School, 06/01/03, Silverdale, Washington
  • Basic and Advanced firefighting training
  • GCAP Ammonia Operator I & II

Certification

  • Universal refrigeration license

Timeline

Foreman/Refrigeration and Air Conditioning Technician

Ice Builders
06.2018 - Current

Service Tech/ Start-up

Cimco Refrigeration
10.2015 - 06.2018

Service Technician

Republic Refrigeration
09.2013 - 10.2015

Mayekawa (Mycom)
08.2013 - 10.2013

Plant Engineer

ReddyIce
02.2010 - 08.2013

First Class Petty Officer (E6)-Machinist's Mate

U.S. Navy Reserve
01.2009 - 01.2014

NPDB 3

U.S. Navy
02.2007 - 02.2008

Waterfront Security

U.S. Navy
10.2005 - 11.2008

USS Abraham Lincoln

U.S. Navy
09.2003 - 01.2005

USS Nassau

U.S. Navy
06.1999 - 01.2003
  • Universal refrigeration license

High School -

Pulaski Jr/Sr High School
David Briggs