Fabricated cable try, hung cable tray, bent rigid conduit,pulled wire, terminated panels, terminated main mcc panels, ran 3/8,1/2, an quarter inch stainless steal tubing, mounted instruments, terminated instruments, had to use location drawings p&id drawing an electrical drawings as well.
Bent 1/4,3/8, an 1/2 inch tubing, mounted instruments, fabricated brackets, stroked valves
It was a turn around so just went around an serviced instruments . We also used heart communicators, took valves out of service an then put them back in service once they put they put the new ones back in. Didn't do to much installs cause it was a turn around it was more work an rerun programs making sure all the instruments where In workin order.
Fabricated cable tray, mounted cable tray, ran 3/4-4 inch rigid conduit, 3/4 emt an 1 inch emt, ran 1/4,3/8, an 1/2 inch tuning, fabricated tubing tray, mounted instruments, pulled wire terminated wire, had to use location drawings, electrical drawings an P&ID drawings, mounted panels, an did some start up on this project
Fabricat stands, mount panels, pull wire, terminate panels, bend 3/4 inch emt - 4 inch emt, 3/4 rigid -4 inch rigid conduit,