Summary
Overview
Work History
Education
Skills
Timeline
ProjectManager

DOUGLAS C. BOUDREAUX

Chandler,USA

Summary

Dynamic project management professional with over 20 years of experience in the semiconductor industry, specializing in the delivery of mission-critical lithography projects across diverse environments. Proven expertise in driving project timelines and ensuring quality outcomes through meticulous strategic planning and execution. Recognized for a highly collaborative approach, adaptability, and a steadfast commitment to team success and client satisfaction. Extensive experience collaborating with customer A&E design teams, system integrators, and multi-discipline trades in multicultural settings enhances the ability to navigate complex project landscapes effectively.

Overview

37
37
years of professional experience

Work History

Project Manager

World Wide Professional Solutions
Chandler, Arizona
02.2024 - Current
  • Directed team efforts in the timely installation and commissioning of 9 extreme ultraviolet lithography scanners and multiple semiconductor systems, ensuring project delivery within budget constraints.
  • Implemented lean construction methodologies to drive efficiency, ensure safety, and minimize waste across projects.
  • Reviewed and comprehended contract documents and project specifications to ensure alignment with project objectives.
  • Coordinated efforts with scheduling and project controls teams to ensure alignment of CPM schedules with owner and tool installation milestones.
  • Directed project teams and trade partners across diverse disciplines, ensuring adherence to stringent safety, quality, and cleanroom standards.
  • Reviewed and assessed vendor and subcontractor bids to maintain competitive pricing and adherence to client requirements.
  • Spearheaded continuous improvement initiatives to optimize cost control, constructability, and productivity across designated scopes.
  • Lead the construction change management process including review of change requests, pricing validation, schedule impacts, and approval coordination with the client, design team, and trade partners.

Equipment Engineering Technician

Calviri LLC
Tempe, Arizona
05.2022 - 01.2024
  • Conducted thorough testing and installation of upgrades on product preparation equipment, ensuring compliance with cleanroom standards.
  • Partnered with chemical engineering team to drive experiment development focused on enhancing tool capabilities.
  • Collected and tracked equipment production data to enhance operational efficiency and reliability.
  • Oversaw hazardous waste program for cleanroom and support areas. Directed compliance efforts for storage, scheduling, and disposal processes. Led initiatives for documentation updates and personnel training to enhance operational efficiency.

Install Tool Owner

Intel Corporation
Chandler, Arizona
07.2012 - 02.2022
  • Ensured the design and installation of complex manufacturing equipment per specifications while keeping to strict timeline schedules to include micro-schedule development, systematic testing of supporting safety systems, automation integration and equipment functionality and commissioning.
  • Extensive familiarity and use of systems such as Primavera, Autodesk Design Review, AMTS Touchplan, BIM360, Microsoft Office Teams, Word, Excel, PowerPoint, Project.
  • Facilitated role as Engineering Technician which included driving production and maintenance issue resolution through HPM team, developing jigs and specialty equipment for maintenance safety/efficiency.
  • Trained in LEAN principles, WPO practices, ISO9001 Auditor training

Manufacturing Technician

Intel Corporation
Chandler, Arizona
07.2000 - 07.2012
  • Executed Expat assignment as the Lead Technical Trainer responsible for developing and implementing training plans for technicians with relatively no maintenance experience in semiconductor manufacturing up to a L3 Technician.
  • Performed quality preventive and corrective maintenance as well as installation of equipment upgrades which optimize tool performance and extend production time.
  • Assisted in daily coordination of test wafers and weekly inline monitors, conduct particle analysis on inline monitors and evaluate operating data to conduct real time equipment adjustment to ensure process optimization and quality tool performance.
  • Collaborate with manager on area training responsibilities and future training direction.

Interior Electrician

United States Army
Lafayette, LA
02.1989 - 02.1995

Education

Associate of Applied Science - Electronics

DeVry Institute of Technology
Phoenix, Arizona
10.1998

Skills

  • Project management
  • Project planning
  • Cost management and forecasting
  • Advanced problem solving
  • Team leadership
  • Coaching and guidance
  • Meeting facilitation
  • Schedule coordination
  • Quality assurance
  • Performance metric tracking
  • Cross-functional coordination
  • Problem-solving
  • Primavera software proficiency
  • Proficient in Autodesk design review
  • BIM360 project management
  • Experienced with Microsoft Office applications

Timeline

Project Manager

World Wide Professional Solutions
02.2024 - Current

Equipment Engineering Technician

Calviri LLC
05.2022 - 01.2024

Install Tool Owner

Intel Corporation
07.2012 - 02.2022

Manufacturing Technician

Intel Corporation
07.2000 - 07.2012

Interior Electrician

United States Army
02.1989 - 02.1995

Associate of Applied Science - Electronics

DeVry Institute of Technology
DOUGLAS C. BOUDREAUX