Summary
Overview
Work History
Education
Skills
Timeline
Installation Technician

Douglas Wheeler

Integrated systems solutions
Hunlock Creek,PA
45
years of professional experience

Experienced Installation Technician with a strong background in system installation, cabling, blueprint reading, circuit testing, and equipment troubleshooting. Known for delivering accurate, efficient installations and resolving issues quickly to support smooth project completion.

Work History

Installation Technician

2 Years 5 Months
Integrated systems solutions | Crane Lake, Minnesota | 06.2024 - Current
  • Installed and configured various systems to meet client specifications and requirements.
  • Executed system installations efficiently, ensuring optimal performance and user satisfaction.
  • Utilized problem-solving skills to troubleshoot and rectify system malfunctions effectively.
  • Installed integrated systems cabling for commercial client sites.
  • Mounted equipment and hardware per project drawings.
  • Tested wiring and device connections before system handoff.
  • Installed new equipment according to manufacturer specifications and customer requirements.

Installation tech/Site Supervisor

10 Years 7 Months
Wepco/KPI | Pittston, Pennsylvania | 11.2013 - 06.2024
  • Executed installation of complex equipment and systems to meet project specifications.
  • Performed thorough testing and troubleshooting to ensure optimal equipment functionality.
  • Managed daily site operations to ensure project timelines and objectives were met.
  • Facilitated collaboration among team members to streamline workflow and enhance productivity.
  • Maintained clear communication with team members to ensure alignment on project goals.
  • Provided regular updates to stakeholders regarding project progress and site conditions.
  • Installed field equipment for Wepco/KPI industrial customers
  • Interpreted blueprints, wiring diagrams, and installation drawings
  • Assembled mounting hardware, brackets, and support components
  • Wired controls, panels, and device connections
  • Troubleshot equipment faults and corrected installation issues
  • Coordinated jobsite work with Wepco/KPI crews and clients
  • Installed new equipment according to manufacturer specifications and customer requirements.
  • Resolved customer complaints related to installation issues in a timely manner.
  • Provided feedback to supervisors regarding any potential problems encountered during installations or repairs.

Truss Plant sawyer forman

2 Years 7 Months
Maronda Homes | Tampa, Florida | 08.2011 - 03.2014
  • Measured, cut, and prepared framing lumber for Maronda Homes home construction.
  • Operated saw equipment to shape wood components for wall and floor framing.
  • Inspected lumber for defects before cutting materials for residential builds.
  • Read work orders to prepare wood parts for carpentry teams.
  • Maintained saw blades, tools, and work area for daily production.
  • Checked for discrepancies between orders and actual products produced by the saws.
  • Assembled saws and tools and fed lumber into saw machine.
  • Set up equipment according to safety protocols.
  • Inspected finished products for accuracy and quality assurance.

Carpenter Foreman

25 Years 8 Months
CCA | Pompano Beach, Florida | 11.1985 - 07.2011
  • Operated sawmill equipment to cut lumber to required specifications.
  • Inspected wood for defects before and after cutting operations.
  • Adjusted saw settings to match changing material and production needs.
  • Monitored blade condition and reported maintenance issues promptly.
  • Followed safety procedures for handling lumber and powered cutting tools.
  • Communicated regularly with subcontractors regarding project timelines.
  • Tracked and reported units and labor hours prior to submission of timecards.
  • Trained new employees on company policies and procedures.

Electrician

2 Years 2 Months
B&M Electrical | Boca Raton, Florida | 12.1985 - 02.1988
  • Install electrical systems in commercial and residential buildings ensuring compliance with codes.
  • Configure and test electrical systems to optimize performance and safety standards.
  • Installed wiring, conduit, and fixtures for B&M Electrical projects.
  • Replace and upgrade fixtures to enhance efficiency and meet client specifications.
  • Tested circuits with meters and diagnostic tools.
  • Read blueprints and wiring diagrams for accurate installations.
  • Maintained compliance with electrical codes and safety practices.
  • Installed conduit, wire and motor controls.

Aviation Electrician's Mate

4 Years
US Navy | Jacksonville, Florida | 11.1981 - 11.1985
  • Completed day-to-day duties accurately and efficiently.
  • Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
  • Prioritized and organized tasks to efficiently accomplish service goals.
  • Worked with cross-functional teams to achieve goals.
  • Maintained updated knowledge through continuing education and advanced training.
  • Utilized advanced technical skills and expertise to troubleshoot complex problems and implement solutions.

Education

Associate of Science - Electronic Engineering

ITT Technical Institute | Pompano Beach, FL | 01-2015

Skills

System installation
Cabling installation
Blueprint reading
Circuit testing
Equipment troubleshooting
Project coordination

Timeline

Installation Technician

Integrated systems solutions
06.2024 - CurrentRead More

Installation tech/Site Supervisor

Wepco/KPI
11.2013 - 06.2024Read More

Truss Plant sawyer forman

Maronda Homes
08.2011 - 03.2014Read More

Electrician

B&M Electrical
12.1985 - 02.1988Read More

Carpenter Foreman

CCA
11.1985 - 07.2011Read More

Aviation Electrician's Mate

US Navy
11.1981 - 11.1985Read More

ITT Technical Institute

Associate of Science from Electronic Engineering
Read More
Douglas Wheeler