Dynamic Roadway Superintendent at Watson Civil Construction, adept at project management and quality assurance. Proven track record in enhancing project efficiency through strong relationship building and coordination. Successfully led roadway construction and rehabilitation projects, ensuring high standards and client satisfaction. Committed to delivering exceptional results in every endeavor.
Job Superintendent for Roadway Construction , New Construction and Road Rehab
2 years as Grade foreman on State Rd 200 widening . Excavated and finish all 5 ponds, build new lanes with embankment. Demuck and add Rip Rap on all 4 corners of the bridge and some ditch bottom tie into the river. 5 miles of curbpad and sidewalks.
7 years of Heavy Equiptment Operator before becoming Foreman. Can operate all machines (except the motor grater).
Worked on the whole phase 2 of the 9B project,
Collins RD project
As a Superintendent I have Accomplished Alta Drive widening . Included a full 60 day detour for 2 bridge sections of complete demo and demuck add 22 ft of embankment , new islands, traffic separators, new construction at railroad intersection at Alta/Faye Rd.
Phillips Hwy add 13 new turn lanes, new utilities, mill and resurface.
SanJose BLVD. Build new southbound onramp to I-295 /Buckman Bridge , mill and resurface 2 miles Northbound/Southbound, replace all Ada ramps per spec , demo replace 32 driveways at business entrances.
Before Superintendent promotion I was a grade foreman for the SanPablo JTB Diamond Diversion , Southside Blvd widening, Bch Blvd and southside new uturn on ramps, SanPablo Rd widening between Atlantic Blvd -Beach Blvd.