Installing Solar edge and enphase PV systems with eco fast mounting.
Permit Run, lead crews on jobs, run attics with flex, walk up ladder with panels.
Installing Enphase solar PV systems with K2 flashless rail system, flashless eco fasten, flashed eco fasten. Rail railess. Remove systems, operater at 3 stories using boomlift, run flex through attic spaces.
Dig and fill trenches. Operate light duty trenching equiptment. Travel out of state for other branches.
PV troubleshooting on slow days.
NEC 2023 Code changes updates TX safety & laws. TDLR CE
Electricians apprentice license 2022-2024