Summary
Overview
Work History
Education
Skills
Personal Information
Certification
LANGUAGES
Timeline
Generic
Freddy Lopez Duran

Freddy Lopez Duran

Virginia Beach,VA

Summary

Logistics and construction foreman with a background in scheduling labor, materials, and equipment to keep projects moving safely and on time. Background includes blueprint review, OSHA compliance, crew training, and coordination with superintendents, subcontractors, and field teams to reduce delays, prevent errors, and support efficient jobsite operations.

Overview

1
1
Certification
10
10
years of professional experience

Work History

General foreman structure

HRCP (FLATIRON DRAGADOS,BINCHI)
Virginia Beach, VA
09.2025 - Current
  • Reviewed blueprints and flagged dimension conflicts before pours, preventing structural misalignments.
  • Trained new team members on equipment use and jobsite expectations.
  • Monitored site safety procedures and enforced OSHA compliance across work areas.
  • Inspected work progress and corrected field issues with crew leads.
  • Scheduled labor, materials, and equipment for active project operations.
  • Material handling and assembly of PERI panels, for walls and deck, shoring tower assembly, and others.
  • Managed concrete curing timelines and moisture logs to meet project quality and inspection standards.
  • Handling of hoisting in panels and materials to develop work properly
  • Scheduled subcontractor deliveries and adjusted sequences to avoid material storage bottlenecks on site.
  • Handling of machinery, forklift, manlift, scissor basket, and other machinery for work development.
  • Implemented OSHA-compliant safety checks each shift, cutting on-site minor injuries and stoppages.
  • Inspected formwork and rebar layout against blueprints, catching dimensional errors before pouring.
  • Trained crew on OSHA fall-protection and PPE protocols, reducing reportable close calls on site.
  • Verified slab elevations using laser level and grade stakes, preventing uneven finished floors.
  • Conducted pre-pour briefings with subcontractors and trades to align sequences and avoid conflicts.
  • Coordinated daily work plans with superintendents and project leadership.
  • Reviewed plans, drawings, and specifications for construction activities.
  • Inspected work quality and resolved field issues with supervisors.
  • Documented crew activity, progress, and site conditions in reports.
  • Documented labor hours, crew attendance and individual performance.

Structure Foreman

Flatiron Dragados
Corpus Christi, Texas
10.2024 - 08.2025
  • Led a team to ensure project milestones were met, resulting in timely completions and enhanced client satisfaction.
  • Management and control of personnel, for a better work organization, ensuring the development of work activities, assigning personnel to specific areas to enhance development according to their abilities.
  • Coordination for the assembly and creation of wooden forms for concrete pouring, in containment barriers, segments, and others as necessary for project advancement.
  • Streamlined project workflows by implementing structured schedules, leading to timely completions and improved client satisfaction.
  • Orchestrated concrete pouring operations, ensuring quality standards and enhancing structural integrity across all project phases.
  • Analyzed drainage systems to optimize fiber drainage solutions, resulting in enhanced efficiency and reduced maintenance costs.
  • Conducted thorough inspections of drainage installations, ensuring compliance with engineering standards and preventing costly reworks.
  • The polishing and brushing of the fiberglass pipes was carried out, aiming for quality in the assembly, facilitating the connection of drainage lines in their different sizes.
  • Maintained comprehensive project documentation, ensuring compliance with safety regulations and facilitating smooth project audits.
  • Coordination of the arrival of materials for the project, facilitating the work for the other groups, improving the construction times, and carrying out a more thorough control over the materials.
  • Morning talks were held throughout the project with the staff for better understanding and explanation about the importance of workplace safety, implementing OSHA.
  • Filling out daily reports on the progress of the project, effectively applying knowledge about the daily activities performed and directly coordinating future advances to avoid delays in the project.
  • Enforced safety procedures and jobsite compliance across active work zones.
  • Directed equipment use, material staging, and site logistics.
  • Coordinated daily work with superintendents, subcontractors, and field crews.

Carpentry General Foreman

Marin LLC
Corpus Christi, Texas
11.2022 - 09.2023
  • Oversaw daily operations on-site, ensuring project milestones were met, resulting in on-time project completion and enhanced client satisfaction.
  • Implemented a new scheduling system for workforce allocation, optimizing labor efficiency and significantly reducing idle time.
  • The concrete pouring and assembly of all aspects, such as framing, plumbing, electrification, drywall, and others, were supervised until the final phase of the 18 buildings, ensuring the highest quality of work and staff safety.
  • Coordinated with subcontractors and suppliers to streamline workflow, fostering teamwork that led to improved project timelines.
  • Monitored project progress and identified bottlenecks, applying problem-solving techniques that resulted in noticeable gains in productivity.
  • All workers were trained with safety talks, ensuring each of them had the necessary knowledge. We helped improve machine handling practices, making the activities safer.
  • Weekly and daily reports were made on project progress, and OSHA 10 training was efficiently coordinated with supervisors, and reports were presented on improving equipment costs according to project needs, improving and safeguarding the company's interests.
  • Interpreted blueprints and field drawings for Marin LLC jobsite layouts.
  • Inspected carpentry work for code compliance and quality control.
  • Communicated progress updates with supervisors, trades, and site management.

Drilling Coordinator

Condor Energy Group SRL
Santa Cruz de la Sierra, Bolivia
05.2022 - 09.2022
  • Coordinated drilling operations, ensuring adherence to safety protocols, which led to a zero-incident record during the project.
  • Monitored drilling performance metrics to identify inefficiencies, resulting in improved operational efficiency and reduced downtime.
  • Coordination for the use, handling, and transport of drills for assembly according to the client's request, seeking effectiveness and safety at work to improve drilling processes in mud.
  • Facilitated communication between cross-functional teams, enhancing project alignment and expediting decision-making processes.
  • Direct coordination with the project manager for better control and handling of logistical issues in the project.
  • Control and handling of equipment for the correct cementing at the wellhead, avoiding setbacks that cause delays in the progress of the project.
  • Implemented a new reporting system for real-time data tracking, enabling proactive adjustments and minimizing operational disruptions.
  • Promoted a culture of teamwork and mentorship among crew members, fostering skill development and enhancing overall team performance.
  • Streamlined drilling operations by refining scheduling processes, leading to reduced project timelines and enhanced resource allocation.

Logistics and Transportation Coordinator

Geo Petrosismic Service
Chuquisaca, Bolivia
02.2019 - 04.2022
  • Coordinated transportation schedules, optimizing delivery routes to enhance efficiency and reduce operational delays.
  • Coordination with the different groups, drilling, environment, safety, topography, and others, the daily activities in the project, seeking to optimize time and improve project development.
  • Risk control in heavy machinery such as cranes, forklifts, trucks, and others, conducting thorough inspections to ensure proper operation and avoid workplace accidents.
  • Monitored inventory levels and analyzed supply chain performance, leading to improved stock management and reduced costs.
  • Fostered strong relationships with suppliers and carriers, ensuring seamless communication and timely resolution of logistical challenges.
  • Management of worker payroll to coordinate the rotation of staff in vehicles and to make the work of the different project groups more effective, allowing everyone to carry out their activities efficiently.
  • Implemented a tracking system for shipments, providing real-time updates that improved transparency and customer satisfaction.
  • Monitored inventory metrics, enabling informed supply chain adjustments that improved stock management and minimized costs.

Jr Logistics and Transportation Coordinator

BGP, CNPC Oil
Beni, Bolivia
02.2017 - 02.2019
  • Coordinated daily logistics, optimizing transport routes, ensuring timely deliveries.
  • A rotation system was implemented for 60 vehicles in the project, tracking each group and data designation, control and monitoring inside and outside the project, while also managing the various mechanical maintenance.
  • Managed supply chain operations, reducing delivery delays, enhancing customer satisfaction.
  • Management and control of vehicle movement through GPS to monitor routes, schedules, speeds, and maintenance of kilometers per day for the different vehicles.
  • Collaborated with teams, resolving logistical issues, improving efficiency.
  • Analyzed transport data, identifying cost-saving opportunities, boosting profitability.
  • Implemented safety protocols, minimizing risks, ensuring compliance with regulations.

Education

Diploma - OIL AND GAS NATURAL TECHNOLOGY

UAGRM
Bolivia
10-2019

Skills

Team Leadership, Problem Solving, Process Optimization, Data Analysis, Technical Writing, Risk Assessment, Logistics

Coordinator, Multitasking, Conflict Resolution, OSHA Regulations, Quality Control, Logistics Coordination, Performance Monitoring, Policy Implementation, Field Operations, Payroll Management, Wooden Forms Concrete Curing

Drainage Installation, Reading Blueprints, Package System Management, Safety Audits, Inventory Control, Construction Planning, Creativity, Adaptability, Cost Estimation, Logistics Software, Interpersonal Skills, Strategic Thinking, Motivation Techniques, Teamwork, Flexibility, Leadership

Safety Training,Crew supervision,Equipment operation,Concrete scheduling,Blueprint reading,OSHA compliance,Formwork layout

Personal Information

  • Title: GENERAL FOREMAN OF STRUCTURE
  • Nationality: Bolivian
  • Driving License: 50542308

Certification

  • Safety with Height Work
  • Basic First Aid
  • Defensive Driving in Light Vehicles and 4x4
  • Course on Remediation of Soils Contaminated by Hydrocarbons
  • Oil Distillation and HYSYS Course
  • TWIC Card
  • OSHA 10
  • OSHA 30
  • BLS (BASIC LIFE SUPPORT)

LANGUAGES

English (Proficient), Spanish (Highly proficient)

Timeline

General foreman structure

HRCP (FLATIRON DRAGADOS,BINCHI)
09.2025 - Current

Structure Foreman

Flatiron Dragados
10.2024 - 08.2025

Carpentry General Foreman

Marin LLC
11.2022 - 09.2023

Drilling Coordinator

Condor Energy Group SRL
05.2022 - 09.2022

Logistics and Transportation Coordinator

Geo Petrosismic Service
02.2019 - 04.2022

Jr Logistics and Transportation Coordinator

BGP, CNPC Oil
02.2017 - 02.2019

Diploma - OIL AND GAS NATURAL TECHNOLOGY

UAGRM
Freddy Lopez Duran