Summary
Overview
Work History
Education
Skills
Websites
Timeline
Generic

Ganesh Bogle

Hollywood,FL

Summary

Seasoned Owner/Operator with 20 years of expertise in construction/renovations. Highly knowledgeable about interior renovation market, competitors and clientele with strong background in negotiating deals and generating up to $180,000 annually. Personable leader with strengths in guiding employees to elevate productivity and attracting loyal customers to increase profits.

Overview

21
21
years of professional experience

Work History

Owner/Operator

First class Tiling LLC
04.2007 - Current
  • Developed business plan and budget to maximize profitability
  • Analyzed market trends and customer feedback to identify opportunities for growth
  • Supervised staff and manage projects
  • Trained apprentices into fully qualified tradespersons
  • Oversaw hiring process for new employees, from recruiting to onboarding training
  • Created marketing strategies to drive revenue and increase brand visibility
  • Maintained relationships with vendors and suppliers in order to secure favorable terms on materials and services
  • Resolved customer complaints promptly and professionally in order to maintain a positive reputation for the business
  • Negotiated contracts with clients for products or services rendered by the company
  • Established long-term relationships with customers by promoting great service and engagement skills and quickly resolving issues
  • Responded quickly to customer complaints and gathered pertinent information to make educated decisions for remediation
  • Managed daily operations of the business, including staff, sales, inventory, and accounting.

Tile Finisher

ET Flooring Contractors
05.2005 - 04.2007
  • Measured and cut tiles to fit into walls, floors and ceilings
  • Installed tile backer board on walls and floors for added support
  • Laid out the tiles in a pattern to ensure uniformity of design
  • Grouted tiles with appropriate grout and sealant materials
  • Applied waterproofing membrane over concrete slabs prior to tiling
  • Handled over 30 installations each month smoothly
  • Cut tiles accurately using wet saws, manual tile cutters, power tile nippers and diamond blades
  • Smoothed edges of cuts with abrasive stones or sandpaper as needed
  • Cleaned surface areas before applying adhesive materials to surfaces
  • Spread thinset mortar or other adhesives onto surfaces according to manufacturer's instructions
  • Sealed grout lines with silicone caulk and water-resistant sealants
  • Checked finished work for accuracy against plans and blueprints before completion of job
  • Scraped off excess mortar from joints between tiles using a putty knife or trowel
  • Removed old ceramic, porcelain, marble and granite tiles without damaging underlying surfaces
  • Repaired cracks in flooring by filling them with epoxy grout or cementitious patch material
  • Completed all tasks within set deadlines while maintaining high standards of quality workmanship
  • Maintained safe working environment by following established safety procedures including use of proper protective equipment such as gloves, goggles and respirators when applicable
  • Adhered to industry codes and regulations related to installation techniques and safety practices
  • Kept up-to-date on new products, materials, tools and techniques used in tile finishing projects
  • Assisted other tradespeople in various aspects of their jobs where necessary
  • Examined buildings and project specifications to determine measurements
  • Provided accurate timelines for project completion to key stakeholders
  • Ordered flooring supplies and tiling equipment according to project requirements
  • Completed post-installation inspections and processed work invoices
  • Used power tools and machinery properly to avoid job site accidents
  • Produced high-quality work with power and hand tools and accurate calculations of distances and surface areas.

Installer/skilled Tradesman

Accurate Tile Installers
04.2003 - 04.2005
  • Installed and configured hardware components, such as processors, memory modules, hard drives, motherboards, video cards and sound cards
  • Performed troubleshooting to diagnose and resolve system issues
  • Upgraded systems with new software applications and operating systems
  • Assisted tile setter in mixing and applying grout to tiles
  • Measured, cut, and installed various types of tile for walls and floors
  • Cleaned surfaces prior to tiling to ensure smooth surface
  • Mixed mortar, thinset, epoxy, or other adhesives according to manufacturer's instructions
  • Aligned tiles along reference lines using level and straightedge tools
  • Cut tiles with wet saws and nippers as required for installation
  • Transported materials from storage areas to job sites using hand trucks or carts
  • Inspected work sites to make sure that they are ready for installation of tiles
  • Applied sealants and waterproofing compounds after tile installation is complete
  • Grouted joints between tiles with rubber float and sponges for a seamless finish
  • Prepared sub-surfaces by filling cracks or holes with cementitious patching material
  • Ensured proper bonding of adhesive on backings of tiles before setting them
  • Notified supervisor about any potential problems or discrepancies found during installation
  • Spaced spacers evenly between the edges of each tile while laying them out
  • Removed excess grout from the surface of the newly installed tiles
  • Examined joints between adjacent tiles for uniformity in size and shape
  • Selected appropriate trowels based on type of adhesive used in installations
  • Maintained cleanliness at work site throughout project duration
  • Replenished supplies such as adhesives, grouts, spacers, when needed
  • Lifted heavy objects like slabs of stone or ceramic tile into place with help from others
  • Assisted with completing skilled work by preparing supplies and organizing equipment for ease of use
  • Cleaned and leveled surface areas and removed excess grout
  • Measured, cut and shaped tiles and marble to size
  • Prepared tiling surfaces using waterproofing materials and lath.

Education

High School Diploma -

Miami Norland Senior High School
Miami, FL

Some College (No Degree) Construction Trades -

Kingston College
Jamaica, WI

Skills

  • Operations Oversight
  • Operational Reporting
  • Personnel Management
  • Financial Planning
  • Business Planning
  • Operations Management
  • Negotiation
  • Performance Analysis

Timeline

Owner/Operator

First class Tiling LLC
04.2007 - Current

Tile Finisher

ET Flooring Contractors
05.2005 - 04.2007

Installer/skilled Tradesman

Accurate Tile Installers
04.2003 - 04.2005

High School Diploma -

Miami Norland Senior High School

Some College (No Degree) Construction Trades -

Kingston College
Ganesh Bogle