My diverse background and experience in plant operations/technical procedure development along with my experience as a successful business owner makes me an ideal candidate for a position as a contract procedure writer.
* Sales of Spray Foam and Fiberglass Insulation to include meeting with potential residential and commercial customers, taking measurements, performing take-offs to determine material needed and providing estimates.
* Prepping job sites, installation of product and cleanup of job site following install.
* Marketing our company to ensure a steady pipeline of work.
* Maintain equipment.
* Certified in building science through the Building Performance Institute.
Nuclear Equipment Operator:
* Performed equipment inspections and equipment operations in accordance with approved site procedures.
* Member of plant Fire Brigade.
* Attended required training.
* Performed on the job training and evaluations for newer employees that were navigation the qualification process.
*Documented plant deficiencies via the Condition Report Process.
Operations Technical Procedure Writer:
* Maintained and updated site operations procedures.
* Developed new procedures as required.
* Performed 50.59 and 72.48 screens and evaluations.
* Member of Emergency Response Organization.
* Signed off on Final Design Authorizations for Ops Support.
* Performed Technical Reviews on team members work.
* Effectively communicated with engineering, design mods, operations and department team members to ensure timely changes to bank of procedures that I was responsible for.
* Equipment Inspections/Operations in the field and from the control room On the Fluidized Catalytic Cracking Unit and the Propylene Recovery Units.
* Level 4 Certification.
* Member of the plant Fire Brigade.
* Attended training as required.
* Trained new and less experienced employees.