Summary
Overview
Work History
Education
Skills
Qid
Personal Information
References
Certification
Timeline
Generic

Haitham Mostafa

Mohmed
Doha

Summary

I have been immersed in the world of infrastructure, water and wastewater plants, since August 2007, and this journey continues to this day. Over the years, I have amassed a wealth of knowledge encompassing all aspects of water treatment and infrastructure, including processes, equipment, maintenance, and operational procedures. My dedication to this field has not only provided me with expertise but also a passion for contributing to the development and management of essential infrastructure projects

Overview

17
17
years of professional experience
5
5
years of post-secondary education
3
3
Certifications

Work History

Work Order Manager

GEC Contracting Services and Trading
5 2023 - 6 2024
  • Contract Analysis: Studying and analyzing the contract to ensure all terms and conditions are understood and met
  • Project Baseline Creation: Establishing the project baseline, outlining all key deliverables, timelines, and budget requirements
  • Milestone Tracking: Monitoring and ensuring adherence to project milestones to ensure timely and efficient progress
  • Design Coordination: Collaborating with consultants to follow and review the project design, ensuring it meets the required specifications and standards
  • Procurement Oversight: Following the procurement process and ensuring all materials and services meet baseline requirements
  • Equipment Delivery Monitoring: Tracking the delivery of equipment to ensure it arrives on schedule and meets project specifications
  • Site Installation Supervision: Overseeing site installation activities to ensure they are carried out correctly and align with project plans and standards.

Acting Project Manager

GEC Contracting Services and Trading
2022.11 - 2024.06
  • Site Installation Follow-up: Monitoring the completion of remaining installation activities on site to ensure timely and accurate execution
  • Equipment Operation Oversight: Ensuring the proper operation of equipment and addressing any issues that arise
  • Client Handover Process: Managing the handover process to the client, ensuring all requirements and expectations are met
  • Snag Rectification: Identifying and rectifying all snags reported by the client to ensure final acceptance of the project
  • Project Closeout Deliverables: Coordinating the delivery of project closeout documents and materials, including O&M manuals, as-built drawings, and spare parts.

Construction Manager

GEC Contracting Services and Trading
2019.09 - 2022.11
  • Schedule Management: Coordinating with the technical and site teams to ensure the project schedule is maintained and deadlines are met
  • Stakeholder Coordination: Following up and coordinating with all project stakeholders, including the client, consultant, customers, and Ministry of Interior (MOI), to ensure smooth project progress
  • Daily Site Monitoring: Monitoring daily site activities to ensure work is proceeding according to plan and addressing any issues promptly
  • Target Setting: Creating weekly and monthly targets for the project and conducting regular follow-ups with engineers to ensure targets are achieved.

Construction Manager

GEC Contracting Services and Trading
2017.09 - 2019.09
  • CP 652 Design Build, Operate & Maintain (DBOM) of Al Dhakhira, Sewage Treatment Works, Transfer Pumping Station and Associated Pipelines
  • Site Installation Management: Overseeing all installation activities at the pump station, including pumps, cranes, pipes, surge vessels, odor control systems, screens, generators, and other equipment
  • Rising Main Activities: Managing and supervising rising main activities such as excavation, pipe laying, micro-tunneling, pipe testing, and chamber construction
  • Quality Control: Conducting regular inspections and tests to ensure the quality and compliance of all installation and construction work
  • Coordination and Communication: Coordinating with various teams and stakeholders to ensure seamless integration of all project components.

Senior Site Engineer

GEC Contracting Services and Trading
2016.05 - 2017.09
  • Project (Supply, Installation and Maintenance of Flow Monitoring System for Surface/Ground water/Foul Sewer Networks AA-D /14-15 OM /1685/G
  • Manhole Inspection: Inspecting existing manholes to determine the most suitable method for sensor installation
  • Support Fabrication: Fabricating and installing the appropriate support structures based on the suitability of each manhole
  • Sensor Installation: Overseeing the installation of sensors, ensuring they are properly placed and securely supported
  • Coordination with ICA Teams: Coordinating with Instrumentation, Control, and Automation (ICA) teams to upload necessary software and verify that the installation meets all technical requirements and standards
  • Quality Assurance: Ensuring that the installation is completed to a high standard, with all systems functioning as intended.

Senior Site Engineer

Bamag Mena
2015.05 - 2016.09
  • 10-th of ramadan treatment plant 600,000 m3/day (Egypt)
  • Construction of water treatment plant 600,000 m3/day
  • Site Installation Follow-up: Monitoring the completion of remaining installation activities on site to ensure timely and accurate execution
  • Plant Commissioning: Leading the startup and commissioning process for the plant, including the Intake, Booster, and Station components
  • Pre-Startup Checks: Reviewing all relevant catalogues and performing pre-startup checks, including oil, grease, belts, and routing directions to ensure equipment is ready for operation
  • Equipment Verification: Checking the availability and operational status of all plant equipment to confirm readiness for commissioning
  • Electromechanical Troubleshooting: Following up on and resolving electromechanical issues and breakdowns during the commissioning phase
  • Maintenance Planning: Preparing a periodic maintenance schedule for all plant equipment to ensure ongoing reliability and performance
  • System Integration: Ensuring all systems and components are integrated and functioning correctly during the commissioning phase
  • Quality Assurance: Conducting thorough inspections and tests to verify that the plant meets all operational and safety standards.

Site Engineer

GEC Contracting Services and Trading
2011.11 - 2015.05
  • Project(s)-CP 725: Project CP 725- Consists of construction and refurbishment of various pumping stations and construction of rising main in phase-7, (PS-13, PS-34, PS-50)
  • Drawing Preparation: Preparing all drawings based on site dimensions to ensure accurate and effective installation and refurbishment work
  • Site Installation Management: Overseeing and managing all installation activities at the site to ensure they meet project specifications and standards
  • Refurbishment: Conducting refurbishment of life rising main pipes, including managing shutdowns for limited times to minimize disruption
  • Pre-Startup Equipment Checks: Checking the availability and operational status of all plant equipment before starting the plant to ensure everything is in working order
  • Plant Commissioning: Leading the startup and commissioning process for the plant, ensuring all systems and components are integrated and functioning correctly.

Site Engineer

BAMAG MENA
2011.01 - 2011.11
  • Mashtool El-soq Plant, Cairo, 800 L per Second
  • A water treatment pumping station intake, clarifiers, filters, chlorine, alum sulphate and treated pump room
  • Subcontractor Management: Overseeing and coordinating with subcontractors to ensure their work aligns with project requirements and schedules
  • Project Status Reporting: Preparing comprehensive project status reports to update stakeholders on progress, challenges, and achievements
  • Site Progress Monitoring: Tracking and managing site progress to ensure activities are on track and adhere to the project plan
  • Progress Reporting: Compiling and preparing detailed site progress reports to provide insights into project performance and any necessary adjustments.

Operation Engineer

WH, SUBCONTRACTOR FOR BAMAG MENA
2007.08 - 2010.12
  • Projects: l-Edwa Plant, Minia, 64,000 m3 per day (Egypt)- El-Marg Plant, Cairo, 600,000 m3 per day (Egypt)- Embaba extension Plant, Cairo, 200,000 m3 per day (Egypt)
  • Operator Distribution: Managed and assigned operators to various buildings and systems, including chlorine rooms, pump rooms, and alum systems, ensuring efficient operation
  • Operation Procedure Oversight: Followed and enforced operational procedures to maintain smooth and safe plant operations
  • Equipment Monitoring: Supervised the operation of plant equipment and machinery, ensuring optimal performance and addressing any issues
  • Electromechanical Problem-Solving: Identified and resolved electromechanical problems to minimize downtime and maintain operational efficiency
  • Maintenance Scheduling: Developed and implemented a periodic maintenance schedule for all site equipment to ensure reliability and longevity
  • Leadership: Provided leadership and support to manpower and technicians, fostering a productive and cooperative work environment.

Education

Bachelor of Engineering - Mechanical engineering design & production department

MINIA UNIVERSITY-EGYPT
2002.09 - 2007.05

Skills

Technical knowledge

Qid

28581806644

Personal Information

  • Date of Birth: 08/10/1985
  • Gender: Male
  • Nationality: EGYPTIAN
  • Marital Status: Married

References

  • Mr. Peter Alkafrouni, Operations Manager, GEC Contracting Services and Trading, p.alkafrouni@gec.com.qa
  • Mr. Raed Roustom, Chief Executive Officer, GEC Contracting Services and Trading, r.roustom@gec.com.qa

Certification

Chartered Engineer IMechE

Timeline

Chartered Engineer IMechE

2024-07

Project Management Professional (PMP)

2023-04

Acting Project Manager

GEC Contracting Services and Trading
2022.11 - 2024.06

IOSH Managing Safely

2022-10

Construction Manager

GEC Contracting Services and Trading
2019.09 - 2022.11

Construction Manager

GEC Contracting Services and Trading
2017.09 - 2019.09

Senior Site Engineer

GEC Contracting Services and Trading
2016.05 - 2017.09

Senior Site Engineer

Bamag Mena
2015.05 - 2016.09

Site Engineer

GEC Contracting Services and Trading
2011.11 - 2015.05

Site Engineer

BAMAG MENA
2011.01 - 2011.11

Operation Engineer

WH, SUBCONTRACTOR FOR BAMAG MENA
2007.08 - 2010.12

Bachelor of Engineering - Mechanical engineering design & production department

MINIA UNIVERSITY-EGYPT
2002.09 - 2007.05

Work Order Manager

GEC Contracting Services and Trading
5 2023 - 6 2024
Haitham MostafaMohmed