Summary
Overview
Work History
Skills
Timeline
Generic

Jose Valenzuela

Presidio

Summary

Dynamic professional with a strong background in coordinating construction projects and mentoring staff. Committed to enhancing worksite safety and optimizing processes to achieve project goals efficiently.

Overview

2027
2027
years of professional experience

Work History

Construction Foreman

Berry Bros General Contractors
Pecos, TX
2018 - Current
  • Supervised daily construction activities, ensuring adherence to safety protocols and project timelines.
  • Coordinated with subcontractors to streamline workflows and maintain project schedules effectively.
  • Trained and mentored junior staff, enhancing team efficiency and skill development on-site.
  • Implemented process improvements that reduced downtime and optimized resource allocation during projects.
  • Conducted regular site inspections to ensure compliance with building codes and safety regulations.
  • Managed material procurement and inventory control, minimizing waste and ensuring availability of supplies.
  • Collaborated with project managers to address challenges, contributing to successful project completion strategies.
  • Studied and interpreted blueprints to plan construction phases and team assignments.
  • Verified and submitted team timesheets.

Pipefitter

Berry Bros General Contractors
Pecos, TX
08.2013 - 2016
  • Installed and repaired piping systems for various construction projects.
  • Interpreted blueprints and technical drawings to ensure accurate installation.
  • Collaborated with team members to maintain safety standards on job sites.
  • Utilized power tools and equipment for efficient pipe fitting operations.
  • Conducted routine inspections to identify leaks and necessary repairs.
  • Improved workflow by implementing effective processes for material handling.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.

Pipefitter

AZ Gas Plant
Coyanosa, TX
2012 - 2013
  • Coordinated with project managers to align tasks with project timelines and goals.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Utilized specialized tools and equipment for precise pipefitting processes, ensuring optimal results for each project.
  • Replaced faulty parts and repaired structural damages to pipes and related components.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.

Construction Foreman

On The Spot
Denver City, TX
2011 - 2012
  • Supervised field crews to maximize quality and work efficiency.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Consistently met deadlines under pressure through diligent time management abilities.
  • Inspected work for compliance with applicable regulations and job specifications.
  • Improved client satisfaction with consistent communication and updates on project status.

Skills

  • Managing materials
  • Worksite safety
  • Crew oversight
  • Project management

Timeline

Pipefitter

Berry Bros General Contractors
08.2013 - 2016

Construction Foreman

Berry Bros General Contractors
2018 - Current

Pipefitter

AZ Gas Plant
2012 - 2013

Construction Foreman

On The Spot
2011 - 2012
Jose Valenzuela