Summary
Overview
Work History
Education
Skills
Timeline
Generic

James North

Freeport,TX

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

12
12
years of professional experience

Work History

Robotic Installation Tech

Cushman & Wakefield
Through Out The US & Abroad
06.2021 - 11.2022

New Amazon distribution centers

complete set up of drives, robotics ,Nike and universal stations along with wire management.

  • Used hand and power equipment for hoisting, measuring, testing and drilling of various types of installations.
  • Eliminated field downtime and boosted productivity by restructuring installation techniques and staff teams.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Directed teams in installation, testing, start-up and system commissioning tasks.
  • Tested programs and databases to identify issues and make necessary modifications.

Industrial Maintenance Technician

Turner Industries LLC
Freeport, TX
07.2017 - 10.2019

Dow Chemical ( Contractor)

Repaired and aligned various pumps, motors. Established weekly pm controls with documentation and sign offs

  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Followed work orders and specifications for machine and equipment replacement, repair or maintenance.
  • Assessed operating conditions and adjusted settings to maximize performance and equipment longevity.
  • Evaluated engineering proposals, shop drawings and design comments for sound practice and conformance with established safety and design criteria.
  • Developed, drafted and conducted preventive maintenance procedures to enforce business standards.

Millwright Foreman

Amec Foster Wheeler
Alvin, TX
04.2015 - 05.2017

Installation of Two LM6000 Turbines, Generator and associated equipment

  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Laid out mounting holes, using measuring instruments, and drilled holes with power drill.
  • Inserted shims, adjusted tension on nuts and bolts, and positioned parts, using hand tools and measuring instruments with 100% accuracy over the two yr project
  • Connected power unit to machines or steam piping to equipment, and tested units to evaluate mechanical operation.
  • Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
  • Managed efficient teams of up to ten employees.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Contributed to development, implementation and execution of maintenance programs.

Turbine Technician

Siemens Energy
Through Out The US
09.2008 - 05.2015

Nuclear outages through out the states

Complete overhaul on Train, Gen, LP and HP

  • Minimized risks and incidents by strictly adhering to regulations, safety rules and codes.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Worked flexible hours; night, weekend, and holiday shifts.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Documented daily activities in internal system and submitted timely shift reports.
  • Thoroughly documented all plant activities in end of shift logs and detailed concerns and issues prior to distributing reports to on coming Craft labor supervisors

Education

No Degree - Business Communications

Phoenix College Preparatory Academy
Online

NCCER Plus Millwright - Millwright/Maintenance

Southeast Community College Area
Lincoln, NE
09.1986

Skills

  • Program Implementation
  • Commissioning Procedures
  • Program Improvements
  • Issue Resolution
  • Technical Documentation
  • Installation Planning
  • Microsoft Office
  • Quality Assurance
  • Blueprint Interpretation
  • Functional Testing
  • Industrial Machinery Maintenance
  • Mechanical Expertise
  • Technical Plans
  • Troubleshooting Strengths
  • Equipment Installation

Timeline

Robotic Installation Tech

Cushman & Wakefield
06.2021 - 11.2022

Industrial Maintenance Technician

Turner Industries LLC
07.2017 - 10.2019

Millwright Foreman

Amec Foster Wheeler
04.2015 - 05.2017

Turbine Technician

Siemens Energy
09.2008 - 05.2015

No Degree - Business Communications

Phoenix College Preparatory Academy

NCCER Plus Millwright - Millwright/Maintenance

Southeast Community College Area
James North