Summary
Overview
Work History
Education
Skills
Certification
Work Experience
Strengths
Timeline
Generic

James E. Hodge

Walker,LA

Summary

Pursued opportunities that present immediate challenges. Supported team efforts to achieve higher responsibilities. Contributed to a dynamic company focused on mutual success through dedicated work. Prioritized safety and quality craftsmanship in all job aspects.

Executed installation and maintenance of piping systems across diverse environments, ensuring optimal functionality.

Assisted in interpreting blueprints and technical diagrams for accurate installations. Supported advanced welding and cutting processes to create dependable piping systems. Followed safety protocols and best practices to promote a secure and efficient work environment.

Assisted teams in executing pipefitting tasks in dynamic settings. Supported blueprint interpretation, welding, and pipe installation efforts. Contributed to maintaining safety protocols and enhancing project workflow.

Overview

36
36
years of professional experience
1
1
Certification

Work History

Quality Control Inspector

Cajun Industries
Camero, La. CP2 LNG Project
09.2024 - Current
  • Cabot Carbon Black Facility
  • Installed and maintained piping systems in compliance with safety regulations.
  • Interpreted blueprints and schematics to execute precise installations.
  • Collaborated with team members to troubleshoot and resolve system malfunctions.
  • Conducted regular inspections to ensure system integrity and functionality.
  • Optimized workflow processes to enhance operational efficiency in project execution.
  • Conducted inspections of materials and products to ensure compliance with quality standards.
  • Identified defects and discrepancies, documenting findings for corrective actions.
  • Utilized testing equipment to evaluate product performance against specifications.
  • Collaborated with production teams to address quality issues in real-time.

Construction Coordinator

PTS Advance
Plaquemine, LA
09.2025 - 10.2025
  • Managed project timelines and resource distribution to facilitate on-time completion of mechanical assignments.
  • Streamlined project documentation processes to support engineering teams and uphold compliance with safety regulations.
  • Evaluated technical drawings and specifications, enhancing quality control and compliance with project standards.
  • Enabled effective collaboration between diverse teams to enhance project efficiency.
  • Coordinated project schedules and timelines to enhance workflow efficiency.
  • Communicated with subcontractors to ensure adherence to project specifications.
  • Assisted in monitoring site safety protocols and compliance measures.
  • Managed documentation for permits, inspections, and contractor agreements.

Construction Coordinator

Global Project Services (GPS)
Enid, Ok
05.2025 - 06.2025
  • Achieved operational excellence at Koch fertilizer plant through effective team collaboration. Enhanced production efficiency by streamlining processes and implementing safety standards. Drove continuous improvement initiatives to elevate overall plant performance.
  • Facilitated project scheduling and resource management to ensure on-time delivery of mechanical tasks.
  • Coordinated organization of project documentation while maintaining rigorous compliance with safety standards for engineering teams.
  • Developed and maintained strategic relationships with clients, leading to increased repeat business and favorable recommendations.

Quality Control Manager

Sulzer Tower Field Services
Atwater, Mn
03.2025 - 05.2025
  • Bushmill Ethanol Plant
  • Led cross-functional teams to identify process improvements, enhancing product reliability and quality.
  • Developed and implemented quality assurance protocols to ensure compliance with industry standards.
  • Conducted regular audits and inspections to monitor adherence to quality control procedures and specifications.
  • Implemented quality control procedures to ensure compliance with industry standards.
  • Conducted regular inspections and audits to identify areas for process improvement.
  • Collaborated with cross-functional teams to address quality-related issues effectively.
  • Developed training programs to enhance team knowledge of quality assurance practices.
  • Established key performance indicators to monitor and evaluate product quality outcomes.
  • Facilitated communication between departments to ensure alignment on quality goals and strategies.

Junior Project Manager

WestPro LLC
Hastings, NE
05.2023 - 07.2024
  • Coordinated project timelines and schedules to ensure timely completion of construction phases.
  • Assisted in managing project documentation, including contracts and change orders.
  • Facilitated communication between contractors, clients, and stakeholders to resolve issues promptly.
  • Reviewed blueprints and specifications to ensure compliance with safety regulations and standards.
  • Monitored site activities for adherence to project plans and quality standards.
  • Developed and maintained tracking systems for materials, equipment, and labor resources.
  • Assisted in project planning and scheduling to meet deadlines and deliverables.
  • Coordinated communication between team members to streamline workflows and enhance collaboration.
  • Maintained project management tools for tracking tasks, timelines, and resource allocations effectively.
  • Organized meetings, capturing actionable items and distributing agendas to stakeholders efficiently.
  • Monitored project progress, identifying potential risks and proposing solutions proactively.
  • Supported project documentation efforts, ensuring accuracy and compliance with standards.
  • Facilitated onboarding for new team members, providing guidance on tools and processes used in projects.

Pipefitter Foreman

Performance Contractors
Baton Rouge, LA
03.1994 - 06.2024
  • Boilermaker Foreman, Pipefitter Foreman
  • Supervised installation and repair of piping systems to ensure compliance with safety standards.
  • Led team in troubleshooting and resolving complex piping issues efficiently.
  • Maintained accurate records of materials used and project progress for reporting purposes.
  • Oversaw quality control inspections to guarantee adherence to industry regulations and specifications.
  • Supervised pipe installation and maintenance projects ensuring adherence to safety standards.
  • Coordinated team schedules and workflow to optimize productivity on job sites.
  • Trained junior pipefitters in proper techniques and safety protocols, enhancing team skill levels.
  • Conducted quality inspections of completed work to ensure compliance with specifications and codes.

Turnaround Coordinator

WestPro LLC
Casper, Wyoming
06.2023 - 08.2023
  • Sinclair Plant, Pipe Planner (Project Valentine Hastings Ne.) Various locations around the country
  • Developed comprehensive action plans to address performance gaps, driving organizational improvements and stakeholder satisfaction.
  • Led cross-functional teams to implement turnaround strategies, enhancing operational efficiency and project outcomes.
  • Facilitated change management initiatives, ensuring seamless transitions and employee engagement throughout transformation processes.
  • Analyzed performance metrics to identify trends, providing actionable insights for strategic decision-making and resource allocation.
  • Streamlined communication channels between departments, enhancing collaboration and accelerating project execution timelines.
  • Coordinated turnaround initiatives to enhance operational efficiency across multiple departments.

Project Manager

Universal Plant Services
Chocolate Bayou, Tx
03.2023 - 05.2023
  • Installed and repaired piping systems following safety protocols and industry standards.
  • Collaborated with team members to complete projects efficiently and within deadlines.
  • Led cross-functional teams to deliver complex projects on time and within budget.
  • Developed and maintained project schedules using advanced project management software.
  • Identified risks and implemented mitigation strategies to enhance project success rates.
  • Conducted regular status meetings to track progress, address issues, and adjust plans as needed.
  • Collaborated with team members to execute complex layouts in industrial settings.
  • Led project planning sessions to define scope, goals, and deliverables aligned with client expectations.
  • Coordinated cross-functional teams to ensure timely completion of project milestones and deliverables.
  • Implemented risk management strategies to identify potential issues and develop mitigation plans.
  • Managed project budgets, tracking expenditures and ensuring resource allocation aligned with project objectives.
  • Mentored junior project managers, fostering skills in project execution and stakeholder engagement.
  • Analyzed project performance metrics to drive continuous improvement initiatives across multiple projects.
  • Managed risk assessments and implemented mitigation strategies to minimize potential issues during project execution.

Pipe General Foreman

Turnaround Welding Services
Martinez
09.2012 - 05.2023
  • Mechanical/Piping QC, Mechanical/Pipe Planner. Various locations around the country
  • Assembled and installed piping systems according to project specifications and safety standards.
  • Collaborated with team members to troubleshoot and resolve installation issues efficiently.
  • Inspected completed work for quality assurance, adhering to industry regulations and best practices.
  • Mentored junior pipefitters on advanced techniques and safety protocols during installations.
  • Fabricated and installed piping systems according to blueprints and specifications.
  • Coordinated workflow among team members to optimize project efficiency and resource allocation.
  • Monitored project progress, identifying potential issues and implementing corrective actions swiftly.
  • Liaised with project managers to align objectives and deliverables, ensuring client satisfaction.
  • Conducted regular performance evaluations for team members, identifying strengths weaknesses opportunities for improvement.

Pipefitter/QC Inspector

Specialty Welding and Turnarounds (SWAT)
Martinez
10.2016 - 08.2021
  • Mechanical/Piping QC, Pipefitter Foreman. Various locations around the country
  • Supervised installation and repair of piping systems to ensure compliance with safety standards.
  • Coordinated workflow among team members to enhance project efficiency and meet deadlines.
  • Conducted inspections of installed systems to verify integrity and performance parameters.
  • Assembled and installed piping systems according to specifications and blueprints.
  • Conducted routine inspections to ensure compliance with safety standards and operational efficiency.
  • Collaborated with team members to troubleshoot and resolve pipefitting issues effectively.
  • Utilized welding techniques to join materials, enhancing overall project integrity and quality.

Superintendent

Bronco Construction
Blytheville, AR
11.2020 - 04.2021
  • Air Liquide Cold Box Rebuild
  • Oversaw project timelines, ensuring adherence to schedules and minimizing delays.
  • Coordinated with subcontractors to maintain quality standards and compliance on-site.
  • Managed site safety protocols, conducting regular inspections and training sessions for workers.
  • Developed efficient workflow processes, enhancing productivity across multiple projects.
  • Mentored junior staff, fostering skill development and knowledge sharing within teams.
  • Evaluated project performance metrics, driving continuous improvement initiatives for future projects.
  • Implemented cost-saving measures through strategic resource allocation and vendor negotiations.

Journeyman Pipefitter

Turner Industries
Baton Rouge, LA
06.1996 - 03.2020
  • Boilermaker, Rigger, and Ironworker
  • Collaborated with team members to troubleshoot and resolve system issues efficiently.
  • Installed and maintained piping systems according to specifications and safety standards.
  • Interpreted blueprints and schematics to ensure accurate pipe fitting installations.
  • Utilized industry-standard tools and equipment for precision in pipe assembly and repairs.
  • Ensured compliance with regulatory standards throughout all stages of pipefitting projects.
  • Installed, maintained, and repaired piping systems in residential and commercial settings.
  • Interpreted blueprints and specifications to determine layout of piping systems.
  • Operated welding equipment to join pipes and fittings securely.
  • Conducted pressure tests to ensure system integrity and safety compliance.

Pipe Design/Field Engineer

Jacobs/Worley ECR
St. Croix
07.1990 - 09.2019
  • Pipefitter, Pipefitter Foreman
  • Limetree Facility
  • Executed field assessments, ensuring compliance with safety regulations and industry standards.
  • Collaborated with project teams to develop and implement engineering solutions for complex issues.
  • Conducted inspections and tests on equipment, identifying potential risks and recommending improvements.
  • Coordinated site activities, optimizing workflow and enhancing project timelines through effective communication.
  • Developed detailed reports on field findings, contributing to strategic decision-making processes within teams.
  • Utilized project management software to track progress and report updates to stakeholders.
  • Assisted in developing field engineering procedures to enhance operational efficiency.

Journeyman Pipefitter

Harder Mechanical (Local #342 Plumber/Pipefitters Union)
Richmond, Ca
05.2018 - 09.2018
  • Pipefitter, Pipefitter Foreman
  • Interpreted blueprints and specifications to determine layout of piping systems.
  • Conducted pressure tests to ensure system integrity and safety compliance.
  • Improved workflow efficiency by standardizing installation procedures across job sites.
  • Completed complex projects on time through efficient time management and prioritization of tasks.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Established strong working relationships with colleagues across trades for better collaboration during multi-disciplinary projects.

Journeyman Pipefitter

F&L United (Via #421 Plumber/Pipefitters Union)
Oxford
07.2017 - 02.2018
  • Pipefitter Foreman
  • Interpreted blueprints and specifications to determine layout of piping systems.
  • Conducted pressure tests to ensure system integrity and safety compliance.
  • Improved workflow efficiency by standardizing installation procedures across job sites.
  • Completed complex projects on time through efficient time management and prioritization of tasks.
  • Performed essential maintenance tasks on pipe systems to extend their life span and reduce the risk of failure.
  • Established strong working relationships with colleagues across trades for better collaboration during multi-disciplinary projects.

Pipefitter/Pipefitter Foreman

Plant Performance Services (P2S)
Salt Lake City
03.2009 - 10.2009
  • Boilermaker/Boilermaker Foreman. Mechanical QC Various locations around the country
  • Conducted inspections of piping systems to identify maintenance needs and potential hazards.
  • Documented work performed and prepared reports for project management review.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Increased efficiency by collaborating with team members to install, assemble and repair piping systems in various construction projects.
  • Increased efficiency by streamlining pipe installation processes and ensuring proper alignment.
  • Performed quality assurance checks regularly identifying potential issues early allowing for swift corrective action minimizing negative impacts on overall timelines.

Mechanical QC Inspector

Starcon International
Manhattan, Illinois
02.2004 - 07.2007
  • Piping Foreman/Piping General Foreman, Boilermaker Foreman, Master Mechanic, Journeyman Pipefitter, Rigger, and Ironworker
  • Identified and documented defects in products, facilitating corrective actions.
  • Conducted inspections to ensure compliance with quality standards and specifications.
  • Collaborated with production teams to resolve quality issues efficiently.
  • Maintained accurate records of inspection results and non-conformance reports.

Journeyman Pipefitter

Southeastern Louisiana Contractors
Norco, LA
02.1997 - 10.1997
  • Boilermaker, Rigger, and Ironworker
  • Interpreted blueprints and specifications to determine layout of piping systems.
  • Conducted pressure tests to ensure system integrity and safety compliance.
  • Improved workflow efficiency by standardizing installation procedures across job sites.
  • Completed complex projects on time through efficient time management and prioritization of tasks.
  • Performed essential maintenance tasks on pipe systems to extend their life span and reduce the risk of failure.
  • Established strong working relationships with colleagues across trades for better collaboration during multi-disciplinary projects.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Education

High School Diploma -

Belaire High School
Baton Rouge, LA
01-1990

Skills

Coordinated yearly OSHA-10 hour class to provide essential safety training and certification for all employees

Achieved NCCER certification in boilermaking and pipefitting, enhancing team capabilities Delivered comprehensive training on rigging fundamentals and basic rigging, improving operational efficiency Contributed to a safer work environment through rigorous adherence to rigging standards

Monitored and assessed worksite conditions to identify hazards and mitigate risks effectively

Achieved high accuracy in pipe measurements, contributing to successful project outcomes Improved measurement protocols, resulting in reduced errors and enhanced project delivery timelines Collaborated with cross-functional teams to optimize measurement strategies

Conducted training sessions on safety procedures to enhance employee awareness and reduce workplace incidents

Specialized in pipefitting techniques, focusing on accurate measurements and seamless connections for optimal system performance

Produced high-quality blueprints and specifications that enhanced project clarity and execution Achieved alignment among project teams through effective documentation and communication Drove project success by providing clear and actionable design guidelines

Achieved precise material cuts that enhanced project quality Improved team productivity through effective coordination of cutting tasks Streamlined equipment usage, resulting in reduced downtime

Achieved seamless project execution through effective management of pipe threading tasks Enhanced team productivity by streamlining threading processes Improved safety compliance through rigorous adherence to established protocols

Performed precise installation of pipe hangers, adhering to safety protocols and project specifications

Conducted comprehensive installation and ongoing maintenance to uphold equipment functionality and longevity

Certification

Forklift, Manlift (up to 125 ft), Fresh Air Trained, 8-Ton & 15-Ton Drott and numerous other types of motorized equipment.

Work Experience

01-2017

Strengths

Excellent leadership and interpersonal relations skills, detail and success oriented, strives for excellence.

Timeline

Construction Coordinator

PTS Advance
09.2025 - 10.2025

Construction Coordinator

Global Project Services (GPS)
05.2025 - 06.2025

Quality Control Manager

Sulzer Tower Field Services
03.2025 - 05.2025

Quality Control Inspector

Cajun Industries
09.2024 - Current

Turnaround Coordinator

WestPro LLC
06.2023 - 08.2023

Junior Project Manager

WestPro LLC
05.2023 - 07.2024

Project Manager

Universal Plant Services
03.2023 - 05.2023

Superintendent

Bronco Construction
11.2020 - 04.2021

Journeyman Pipefitter

Harder Mechanical (Local #342 Plumber/Pipefitters Union)
05.2018 - 09.2018

Journeyman Pipefitter

F&L United (Via #421 Plumber/Pipefitters Union)
07.2017 - 02.2018

Pipefitter/QC Inspector

Specialty Welding and Turnarounds (SWAT)
10.2016 - 08.2021

Pipe General Foreman

Turnaround Welding Services
09.2012 - 05.2023

Pipefitter/Pipefitter Foreman

Plant Performance Services (P2S)
03.2009 - 10.2009

Mechanical QC Inspector

Starcon International
02.2004 - 07.2007

Journeyman Pipefitter

Southeastern Louisiana Contractors
02.1997 - 10.1997

Journeyman Pipefitter

Turner Industries
06.1996 - 03.2020

Pipefitter Foreman

Performance Contractors
03.1994 - 06.2024

Pipe Design/Field Engineer

Jacobs/Worley ECR
07.1990 - 09.2019

High School Diploma -

Belaire High School
James E. Hodge