Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jan Kowalkowski

Tinley Park,IL

Summary

Carpentry professional with 15+ years of experience in coordinating construction projects and enforcing quality control standards. Expertise in analyzing project requirements and managing resources to achieve optimal results. Proven track record of delivering projects on time and within budget.

Overview

17
17
years of professional experience

Work History

carpentry and remodeling specialist

JK Construction
Orland Hills , IL
01.2009 - Current
  • Coordinated project schedules and resources for construction initiatives.
  • Implemented quality control measures to maintain high construction standards.
  • Analyzed project needs and provided recommendations for resource allocation.
  • Collaborated with stakeholders to address project challenges and solutions.
  • Maintained documentation of project progress and compliance records effectively.
  • Installed framing and drywall for residential remodeling projects.
  • Collaborated with clients to design custom renovations and improvements.
  • Operated power tools and equipment safely on job sites.
  • Managed material inventory and ordered supplies as needed.
  • Checked sites regularly to uphold quality and safety during construction.
  • Maintained clean and organized workspaces throughout projects.
  • Repaired damaged parts of buildings such as walls, floors and roofs.
  • Cut lumber and drywall to specified sizes with power saws and hand tools.
  • Installed cabinets, doors, windows and other interior fixtures according to blueprints and specifications.
  • Constructed frames for walls, ceilings and floors using wood components.
  • Inspected existing structures prior to renovation work to identify areas requiring repair or replacement.
  • Ensured all building materials were installed correctly according to manufacturer's instructions.
  • Resolved problems related to design or functionality during project implementation.
  • Worked closely with contractors to ensure timely completion of projects within budget constraints.
  • Assisted in the demolition of existing structures to prepare for remodeling projects.
  • Assembled cabinetry by cutting through sheet material with a circular saw or router.
  • Planned layout of construction projects according to building codes and customer requirements.
  • Performed post-construction cleaning tasks such as sweeping debris from the site area.
  • Built stairs based on blueprints or sketches provided by clients.
  • Measured distances accurately using tape measures, levels and squares.
  • Applied different types of finishes including paint, stain, varnish and polyurethane coating.
  • Checked accuracy of cut pieces against plans before installation.
  • Provided technical advice on remodeling techniques that would improve structural integrity or aesthetic appeal.
  • Replaced worn out parts such as door locks, hinges and windowpanes.
  • Used various carpenter's hand tools, portable power tools and standard measuring instruments.
  • Prioritized work, keeping carpentry jobs on task and within budget.
  • Conducted inspections, diagnosed problems, took measurements and made necessary adjustments to complete projects according to specifications.
  • Installed cabinets, base cabinets and crown molding.
  • Collaborated with clients to determine design preferences and specifications.
  • Maintained inventory of tiles, tools, and supplies for efficient operations.
  • Used power tools such as wet saws to cut large format tiles accurately.
  • Created custom designs with mosaic tile pieces when requested by customers.
  • Cut out holes for fixtures such as toilets, sinks and bathtubs.
  • Inspected newly installed tiles for any defects or irregularities before completing project.
  • Utilized hand tools such as hammers, pliers, saws, drills for cutting shapes in tiles during installation process.
  • Laid out patterns of floor tile according to customer design requirements.
  • Applied waterproofing membranes to surfaces before tiling.
  • Mixed thinset mortar, grout and other adhesives for use in tile installations.
  • Grouted tiles using appropriate tools such as float, sponge and sealer applicator.
  • Cleaned up work area at the end of each day's work session.

Education

High School Diploma -

Marie Sklodowska Curie Metropolitan High School
Chicago, IL
05-2000

Skills

  • Project management and resource allocation
  • Carpentry techniques and construction scheduling
  • Material inventory management
  • Quality control and technical problem solving
  • Construction safety
  • Cost estimation
  • Attention to detail
  • Time management

Timeline

carpentry and remodeling specialist

JK Construction
01.2009 - Current

High School Diploma -

Marie Sklodowska Curie Metropolitan High School
Jan Kowalkowski