Summary
Overview
Work History
Education
Skills
Timeline
Summary of Education and Experience
Generic

Jeniece Talbott

Holdenville,Ok

Summary

22 + Years’ experience in material and office management for pipeline and gas related facilities, gas compression, and gas processing facilities as well. I am familiar with DOT and in-house audits throughout the project, Document Control, Timekeeping, Monthly Invoicing and Billing. I also have extensive experience in Material control; material receiving and purchasing including but not limited to working directly with the vendors on material purchases. I am also very familiar with Job completion documentation requirements for pipeline & compressor station projects.

Professional with strong background in materials inspection, prepared to contribute effectively to quality control and assurance processes. Skilled in identifying material defects, conducting thorough inspections, and ensuring compliance with industry standards. Focused on team collaboration and achieving results, adaptable to changing needs, and reliable under pressure. Known for strong analytical skills, attention to detail, and effective communication.

Overview

24
24
years of professional experience

Work History

Materials Inspector

Liberty Energy Services
03.2025 - 09.2025
  • TallGrass “Capture Facility”
  • TPC-02-Ethanol capture facility
  • Received and tracked all materials as they were shipped, and installed
  • Completed material receiving reports and confirmed all documents were as per project specs.
  • Conducted thorough inspections of materials to ensure compliance with industry standards and specifications.

Materials Inspector

Frontier Integrity Solutions
12.2024 - 03.2025
  • Energy Transfer
  • FLBNQ Georgia Pacific Loop
  • 12” which included 3.1/2 miles of new lay, Launch/Receiver and meter site.
  • Conformed all quantities needed and reported any material shortages to accommodate Construction shortages.

Local 798
01.2018 - 01.2024
  • In 2018 thru October 2024, I Joined the local and was hired out on numerous jobs ranging from being a helper, straw, assembled books for test manifolds etc.

Lead Materials Manager

Frontier Integrity FIS
01.2017 - 01.2018
  • Energy Transfer “Bayou Bridge Project “managed materials for 100 miles of new 24” Crude line for Spread 2
  • And 3, which included approx. 40 miles of water lay thru the Atchafalaya Basin
  • Confirmed quantities needed
  • And reported all material shortages to accommodate construction. Prepared project documents for completion of the project Records

Lead Materials Manager

Frontier Integrity FIS
01.2016 - 01.2017
  • ETC “Backhaul Project”
  • Converted 36’’ line for Bi-Directional flow. Job consisted of the Trunkline and Panhandle Compressor station
  • Work. Received and tracked all materials as they were shipped, installed and returned for surplus.
  • Completed material receiving reports and confirmed all documents were as per project specs. Confirmed
  • Quantities needed and reported any and all material shortages to accommodate construction. Prepared project
  • Documents for completion of the project.

Lead Materials Manager

Frontier Integrity FIS
01.2015 - 01.2016
  • ETC “Conversion Project”
  • Receiving material for 120 miles of pipeline conversion. Tracked all material as it was received, installed
  • And returned as surplus. Completed daily progress reporting to confirm the construction schedule was
  • Accommodated and all material was readily available as needed. Completed material receiving reports and
  • Maintained file system daily. Duties consisted of confirming material received was according to Engineering
  • Standards. Reported any shortage of material by completing take-offs on all drawings

Materials Manager/Office Manager

DPS
01.2014 - 01.2015
  • ETC “Make Ready Project”
  • Receiving material in preparation for 30 miles of pipeline conversion. Duties consisted of confirming material
  • Received was according to Engineering standards. Also confirmed all documents received
  • Met requirements. Confirmed daily construction activity progress reporting. Maintained file system for
  • Construction installation. Worked with construction contractor to make sure schedule was accommodated
  • For receipt of all project material. Reported any shortage of material by completing take offs on all drawings

Materials Manager

Houston Inspection Field Serv
01.2013 - 01.2014
  • Enterprise Pipeline Products “Seaway Project “
  • Receive and distribute all materials totaling 97 miles of 30” for the Seaway Project
  • Including
  • Field ordering, preparing all material receiving reports, along with Verifying and
  • Approval of invoices related to field materials. Prepare and file Material Project close out
  • Documents for Client (Enterprise)

Materials Manager

Houston Inspection Field Serv
01.2012 - 01.2013
  • Enterprise Pipeline Products “Atex Project “
  • Receive and distribute all materials totaling 117 miles of 20” for the Atex Project
  • Including
  • Field ordering, preparing all material receiving reports, along with Verifying and
  • Approval of invoices related to field materials. Prepare and file Material Project close out
  • Documents for Client (Enterprise)

Materials Manager

Gulf Interstate
01.2011 - 01.2012
  • Enterprise Pipeline Products “White Kitchen to Yoakum “
  • Receive and distribute all materials totaling 120 miles of 30 & 36” for White Kitchen to Yoakum
  • Project, including
  • Field ordering, preparing all material receiving reports, along with Verifying and
  • Approval of invoices related to field materials. Prepare and file Material Project close out
  • Documents for Client (Enterprise)

Office / Materials Manager

Universal Ensco , INC
01.2009 - 01.2011
  • Florida Gas Transmission “Phase 8“
  • Sr Field Materials Manager for FGT Phase 8 project consisting of 458
  • Miles of 36” & 42” pipelines, 10 Compressor Stations, and numerous
  • Meter and regulator stations. My duties includes but were not
  • Limited to receiving and distributing materials to Contractors for all phases of
  • The project, reporting any and all shortages to the client, managed two
  • Central Material Yards, and over seen 8 pipe laydown yards. Also Responsible
  • For Compiling all Project turn over documents for the Client on the Panhandle
  • Segments of Phase 8

Office / Materials Manager

Universal Ensco , INC
01.2006 - 01.2008
  • Transwestern Pipeline “Phoenix Project”
  • Responsible for managing Central Office and Materials Yard, Project consisted of
  • 256 Miles of 42” & 36” Pipeline from Flagstaff to south Of Phoenix Arizona.
  • Duties included managing all material receiving, and Distribution of materials to
  • Station and Mainline contractors. Also responsible for managing all document
  • Control, and compiling and completing all project completion files for the entire
  • Project.

Office/Materials/Records Manager

Universal Ensco, INC
01.2004 - 01.2006
  • Florida Gas Transmission “Phase 7” Pipeline & Compressor station upgrade
  • Responsible for maintaining central field Office, and managing all material
  • Receiving, along with all of the project files, and all final documentation
  • Etc for a total of 16 work projects On the Phase 7 FGT work. This also
  • Included managing daily time for all of the field management staff for all
  • 16 projects.
  • Florida Gas Transmission “Turkey Point Project” managed field office that
  • Was responsible for receiving all materials for project, which included
  • Coordinating with Houston Office on all Purchase orders, pre-paring all field
  • Documentation packages, commissioning manuals, etc. from start of project
  • To close out of Project. Also responsible for maintaining all of the field
  • Management staffs daily time

Pipeline Office Manager

Universal Ensco, INC
01.2004 - 01.2006
  • San Juan 2005 expansion project, Office Manager Bloomfield New Mexico/
  • Gallup, New Mexico, Installed over 75 miles of 36” pipeline Pre-pared daily
  • Construction reports for over 20 field inspectors, and maintained project job
  • Files, materials records, etc.

Office Manager/ Material Coordinator

Total Inspection Services
01.2004 - 01.2004
  • Tepcpo P-39 Pipeline Expansion Project, Indianapolis, Indiana
  • Pre-pared daily and weekly project construction reports, for numerous field
  • Inspectors on pipeline, Responsible for preparing job completion books
  • Material receiving, payroll, and day to day activities.

Document control

Universal Ensco Inc.
01.2004 - 01.2004
  • Prepared job completion documentation for Florida Gas
  • Transmission Phase 5 and 6 expansion both stations and pipeline projects

Office Manager/ Material Coordinator

Mustang Engineering
01.2002 - 01.2003
  • For field installation of three 7200 hp
  • Rolls Royce turbines for
  • Florida Gas Transmission, Duties consisted of running field construction office
  • Material Receiving, Document
  • Control, Job Completion Packages, Record Keeping, Payroll, etc.

Education

High school Diploma -

Skills

  • Material inspection
  • Compliance verification
  • Quality assurance
  • Project documentation
  • Construction support
  • Materials tracking
  • Quantity confirmation
  • Materials management
  • Compliance inspections
  • Inventory control
  • Material tracking
  • Document control systems
  • Inventory management

Timeline

Materials Inspector

Liberty Energy Services
03.2025 - 09.2025

Materials Inspector

Frontier Integrity Solutions
12.2024 - 03.2025

Local 798
01.2018 - 01.2024

Lead Materials Manager

Frontier Integrity FIS
01.2017 - 01.2018

Lead Materials Manager

Frontier Integrity FIS
01.2016 - 01.2017

Lead Materials Manager

Frontier Integrity FIS
01.2015 - 01.2016

Materials Manager/Office Manager

DPS
01.2014 - 01.2015

Materials Manager

Houston Inspection Field Serv
01.2013 - 01.2014

Materials Manager

Houston Inspection Field Serv
01.2012 - 01.2013

Materials Manager

Gulf Interstate
01.2011 - 01.2012

Office / Materials Manager

Universal Ensco , INC
01.2009 - 01.2011

Office / Materials Manager

Universal Ensco , INC
01.2006 - 01.2008

Office/Materials/Records Manager

Universal Ensco, INC
01.2004 - 01.2006

Pipeline Office Manager

Universal Ensco, INC
01.2004 - 01.2006

Office Manager/ Material Coordinator

Total Inspection Services
01.2004 - 01.2004

Document control

Universal Ensco Inc.
01.2004 - 01.2004

Office Manager/ Material Coordinator

Mustang Engineering
01.2002 - 01.2003

High school Diploma -

Summary of Education and Experience

  • JENIECE TALBOTT
  • PO Box 9
  • Holdenville, Ok 74848
  • Cell Phone: 405-380-3918
  • Email: jtalbott10161@gmail.com
  • Name: Jeniece Talbott
  • Position: Office Manager/Lead Material Coordinator/Utility
  • Education: High school Diploma
Jeniece Talbott