Skilled team player with strong background in Industrial and sewer treatment environments. Works well independently to handle assignments and always ready to go beyond basics assignments. Quick learner with good work ethics. Construction Laborer skilled in preparing work sites for construction and ensuring safe and maintained project site. Executes instructions and works efficiently with other team members.
Overview
7
7
years of professional experience
Work History
Floor Technician
Including results for rz epoxy flooring baton roug
Baton Rouge , La
10.2024 - 11.2025
Maintained cleanliness of floors using buffing machines and vacuums.
Operated floor scrubbers to ensure hygienic conditions in all areas.
Followed safety protocols while using hazardous cleaning chemicals properly.
Implemented best practices for floor care and maintenance procedures consistently.
Stripped old wax from floors using chemical strippers and scrapers.
Swept and mopped floors to maintain cleanliness.
Monitored work areas to ensure that no debris was left behind after cleaning.
Moved furniture and other objects as necessary for floor maintenance.
Checked machinery for proper functioning before use.
Maintained a safe working environment by adhering to OSHA standards.
Ensured all safety protocols were followed when operating power tools and equipment.
Inspected floors for signs of wear or damage and repaired accordingly.
Evaluated work areas before planning flooring layout for different projects.
Kept accurate records of supplies used during each shift.
Inspected floor surface, assessed conditions, and corrected potential imperfections affecting carpet and flooring installations.
Applied new finish to floors using brushes, rollers, or trowels.
Vacuumed, buffed, and waxed floors without causing disruptions to business.
Maintained cleanliness and safety of floors across various facilities, adhering to health standards.
Laborer Helper
Sim's
Gonzales, LA
06.2024 - 09.2024
Completed work on time and with minimal or no errors.
Maintained clean and well-organized work site by removing trash and placing tools back in toolbox.
Demonstrated dependability by establishing perfect record of attendance and punctuality.
Operated and maintained various construction tools and equipment safely.
Followed instructions from contractors and construction managers to meet project specifications.
Cut grass
Labor Helper
P&J's Pressure Washing And Detailing
Gonzales, LA
10.2023 - 05.2024
Managed inventory of cleaning supplies and equipment; placed orders when necessary.
Utilized eco-friendly cleaning products to support sustainability efforts.
Prepped vehicle exterior using power washer, brushes and soapy water to maximize cleanliness.
Completed preventive maintenance and documented work performed.
Operator
National Water Infrastructure
Geismar, LA
09.2018 - 10.2023
Monitored and adjusted speed, temperature and pressure to achieve consistent and high-quality results.
Conducted quality checks and inspections on products to determine compliance with specifications, quality and standards.
Operated computerized control systems, maintaining precision in production processes.
Collaborated with team members and supervisors, coordinating workflow and meeting production targets.
Recorded output quantities, downtime and product quality to track and evaluate production performance.
Removed waste materials or debris to promote safe and clean work environment.
Adhered to safety protocols and procedures to promote safe working environment and prevent accidents or injuries.
Operated equipment following procedures and guidelines to establish safety and smooth operations.
Handled hazardous materials with due care, following all safety guidelines.
Education
East Iberville Elementary And High School -
East Iberville Elementary And High School
Saint Gabriel, LA
05.2009
Skills
Tool and equipment management
Construction Site Maintenance
Safety Protocols
Heavy Lifting
Worksite Cleanup
Problem-Solving
Excellent Communication
Detail Orientation
Floor maintenance
Equipment operation
Team collaboration
Time management
Attention to detail
Effective communication
Site preparation
Surface preparation
Job site preparation
Workplace safety
References
Byron Burbank, National Water Infrastructure, 225-323-9913
Paul Gustave, Impala Terminal, 225-450-5426
Charles Hudson Jr, Impala Terminal, 225-733-1918
Timeline
Floor Technician
Including results for rz epoxy flooring baton roug