Dedicated electrician with 8 years hands-on experience and great understanding of the National Electrical Code for Residential, Commercial, and Industrial projects. Able to understand new and existing High or Low complex voltage systems. Comply with blue prints or electrical schematics that will follow safety standards required for state inspections. Strong knowledge of complicated MCC and PLC systems requiring a lot of different devices with precision and safety measures during installation. Current valid Texas Driver's License and no courts pending.
Overview
14
14
years of professional experience
1
1
Certification
Work History
Electrician
Muth Electric
01.2023 - Current
Installing- Devices or Equipment including Motors, compressors, ATS, Switch Gears, CT cans, Transformers, PLC (Programmable Logistic Controls), MCCs (Motor Control Cabinets), Back up Generators, Lighting Panels, Flow meter devices, Temperature, Pressure, Low or High devices, Bending Pipe by hand or equipment, Solenoids, Relays, Ethernet ports, cat 6 cable, Analog, Digital signal circuits, photocells, cameras, signs, different voltage outlets, refrigerated AC units, card readers, motion activated lights, switches, solar panels, inverters, meters, heaters, pumps, motors, underground circuits, alarms, speakers, and other components that these devices require to function and to be protected properly. This part of the job sometimes requires demolition of old service wires and devices.
Trouble Shooting- Trouble shooting systems done by other companies, people or yourself. This part of the job requires me to be able to identify certain circuits or devices. Helps eliminate the risk of a fire, some one electrocuting themselves and loss of production.
Materials - include EMT, PVC, Rigid, IMC Pipe from 6” inch to 1/2" in size. straps, wire, breakers, anchors, uni-strut racks, etc..
Electrician
A.R.P Electrical Services
11.2020 - 12.2022
Installing- Roughing, Boxing, Pulling wire, then Trimming or Upgrading a Residential or Commercial Project. Theres a lot going on in these projects. Cameras, doorbells, smart fans, speakers, microphones, lights, photocells, signs, different voltage outlets, refrigerated AC units, card readers, motion activated lights, switches, solar panels, inverters, meters, heaters, pumps, underground circuits and other components that these devices and systems require to function or be protected properly. These compenents include Conduit pipe, straps, breakers, panels, anchors, uni-strut racks, penetrating equipment, trenching etc..
Trouble Shooting- Trouble shooting Electrical systems done by other companies, people or yourself. This part of the job requires me to be able to identify certain circuits or devices. Helps eliminate the risk of a fire, some one electrocuting themselves and loss of production
Customer Service- A very important part is having good people skills. I am inside peoples homes or in peoples business. The customer is expecting their brand new installation with out any problems or expecting their existing service to be fixed. Some may be nice and others might be in a bad mood already. I always have to answer polite. After installing or fixing the problem, the work will talk for it self.
Electrician
Voltage Electric
06.2017 - 11.2020
Installing- In this field there was more automation for packing it included EZC’s, ECG’s , Back up Generators Dual Power Supplies, Gate Ways, Asi Cord, Beacons, Motors, FMDs, VFDs, signs, different voltage outlets, refrigerated AC units, card readers, motion activated lights, switches, inverters, meters, Transformers, ATS, Switch Gears, CT cans, Transformers, PLC (Programmable Logistic Controls), MCCs (Motor Control Cabinets), Lighting Panels, Flow meter devices, Temperature, Pressure, Low or High devices, Solenoids, Relays, Ethernet ports, cat 6 cable, Analog, Digital signal circuits, photocells, cameras, signs, heaters, pumps, motors, underground circuits, alarms, speakers etc.. This part of the job sometimes requires demolition of old electrical systems.
Trouble Shooting- Trouble shooting Electrical systems done by other companies, people or yourself. This part of the job requires me to be able to identify certain circuits or devices. Helps eliminate the risk of a fire, some one electrocuting themselves and loss of production
Materials- Cable trays, liquid tight, Uni-strut Racks, conveyor belts, straps, anchors, penetrating equipment, trenching etc. 6" to 1/2" EMT, RMC, IMC etc.. and other components that these devices require to function and be protected properly.
Electrician
Millenium Contractors
01.2016 - 03.2017
Installing- Roughing, Boxing, Pulling wire, then Trimming or Upgrading a Residential or Commercial Project. Theres a lot going on in these projects. Cameras, doorbells, smart fans, speakers, microphones, lights, photocells, signs, different voltage outlets, refrigerated AC units, card readers, motion activated lights, switches, solar panels, inverters, meters, heaters, pumps, underground circuits and other components that these devices and systems require to function or be protected properly. These compenents include Conduit pipe, straps, breakers, panels, anchors, uni-strut racks, penetrating equipment, trenching etc..
Trouble Shooting- Trouble shooting Electrical systems done by other companies, people or yourself. This part of the job requires me to be able to identify certain circuits or devices. Helps eliminate the risk of a fire, some one electrocuting themselves and loss of production
Customer Service- A very important part is having good people skills. I am inside peoples homes or in peoples business. The customer is expecting their brand new installation with out any problems or expecting their existing service to be fixed. Some may be nice and others might be in a bad mood already. I always have to answer polite. After installing or fixing the problem, the work will talk for it self.
Flow Back Operator
PLK
07.2013 - 12.2015
Flow Back Operator- Manage the, plug catcher for plugs, sand catcher, manifold, separator, oil and water tanks, flare. Once oil starts flowing out you will have one input on the separator and 4 output functions, which are gas, oil, water, and a belly dump for any sand. Oil and water will separate by gravity and stay separate with help of chemical injection, the gas will naturally escape through the top output on the separator, leaving the sand having to be manually dumped at the bottom of the separator. There is a variety of pressures and levels (for ex. Differential, Static, Tubing Press., Casing Pressure, Flare Rate, temperature etc.. to be kept up by recording them into a log every 15, 20, 30, or 60 minutes depending on what is being done with choke or how high the pressure or levels are. Dumping of the oil dump on the separator is required by hand if the oil is getting too high to prevent oil going into the gas output which goes to the flare. All the Gas, Oil and Water have Manually Operated Bypasses or Manual Dumps. The operator must keep track of all oil, water being hauled off and gas either being sent to a sales line or sent to the flare. Manually release off gas, oil, water and sad either to the pit by using the gas pressure. This is done so no pressure is caught in between the lines when the rig down process begins, then any left over gas caught in the separator, manifold, sand catcher etc.. will be flared or released to prevent and avoid ignition or high pressure release in the rig down process.
Rigging up/Down- this procedure requires a lot of physical work, such as hammering with a sledge hammer or picking up heavy pipes. A variety of tools and materials are used that include but are not limited to, fork lifts, booms lifts, cranes, sledge hammers, wire brushes, nylon straps, pry bars etc. Inventory is also part of this skill, keeping track of the expired pressure tested pipes. In the yard there is a lot of repairing valves or chokes, manifolds, plug catchers etc. organizing, breaking or rebuilding.
Flowback Operator Reports- must send in Cover Sheet, Spread Sheet and Daily Report. Each of these has a different time to be recorded and sent varying from 6, 12 and 24 hours. No errors are permitted in any kind of reports due to engineers making decisions based on any numbers involving gas, oil, and water.
Pressure testing- Testing iron pieces for faulty or weak iron, rebuilding plug valves, check for expired test on iron pieces in the field, load/ unload mono-rail, stock update iron ready for use, separate damaged or expired iron, inventory, hot shot requests.
Cooling tower Technician
Amertech Tower Services
03.2011 - 06.2013
Rigging up/down – A lot machines including forklift , boom lifts, penetrating, cutting, and lasers are used to build the structure. This part of the job is mostly done by hand, by Climbing, Fabricating and Installing Wood or Fiber Glass studs using nuts and bolts.
Installing- The main objective of this structure is to place large turbines with electrical motors, torque tubes, gear boxes, hubs and pitch blades in a way that when they are all on they act as a cooling mechanism for water used in big industrial plants,
Inspections- All the mechanical components checked for torque values and for any loose vibration to 1 thousandth on an inch for inspection. A variety of inspections have to be passed, which also again included drug test by HAIR-FOLLICLE followed by safety, anchoring, levels, turbine blade pitch %, Bump test motors, check Soft foot of motors, and check torque values, damaged material etc..
Education
High School Diploma - undefined
El Dorado High School
El Paso, Tx
Skills
Critical thinking
Problem solving
Quality assurance
Attention to detail
Efficient
Excellent interpersonal skills
Technical documentation
Familiar with a variety of computer programs
Work well in team invironments
Electrical repairs/ installation/ troubleshooting
Load calculations
Panel upgrades
Electrical maintenance
Wiring diagrams
Power distribution
Sub-panels
Wiring termination
Wire Pulling (this process is the hardest its very delicate as far as damaging wire worth thousands of dollars and has to be pulled with equipment or by hand in very tight places There is a lube that is used to make it slide better through the pipes so its very slippery and can be a bit dity