Summary
Overview
Work History
Education
Skills
Timeline
Generic

John Flanagan

Cathedral City,CA

Summary

Skilled in concrete finishing and demolition work, I enhanced job site efficiency and safety at Callaghan Concrete. Demonstrating critical thinking and physical strength, I trained new laborers and reduced material waste, significantly improving project timelines and quality. My adaptability and proficiency in hand-tool usage have been pivotal in achieving optimal results across diverse construction projects. Highly experienced in mechanical repair of tools, machines, and vehicles Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

18
18
years of professional experience

Work History

Concrete Laborer

Callaghan Concrete
Palm Desert, CA
10.2022 - Current
  • Utilized wheelbarrows, shovels and other tools to move, spread and level concrete.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Demolished and repaired old concrete surfaces.
  • Set wood and other forming materials to prepare for concrete pours.
  • Participated in concrete pouring and finishing, expertly managing application of sealers and curing compounds.
  • Operated heavy machinery such as mixers, pumps, and power tools to expedite the concrete pouring process.
  • Assisted with installation of steel and anchor bolts to reinforce concrete.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Safely operated concrete-cutting and finishing drills, power saws and trowels to complete assigned tasks.
  • Completed various concrete finishing tasks including screeding, edging, and floating for high-quality results.
  • Enhanced project efficiency by assisting in the setup and dismantling of concrete forms and frameworks.
  • Routinely lifted and moved items weighing up to 200 pounds.
  • Trained new laborers in crew processes and safety behaviors.
  • Assisted in accurate measurements for concrete placement, guaranteeing precise dimensions and alignment.
  • Improved job site safety by conducting regular equipment inspections, ensuring proper maintenance and timely repairs.
  • Maintained clear communication with supervisors regarding project progress, addressing potential issues or delays promptly.
  • Assisted with concrete mixing, following instructions for proper ratios of cement, sand and water.
  • Ensured proper curing techniques were applied to optimize concrete strength and durability over time.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Supported efficient material handling by organizing supplies and staging them at appropriate locations on the job site.
  • Operated diverse manual and power tools to cut and shape concrete to required specifications.
  • Interpreted blueprints and diagrams to determine project dimensions and requirements.
  • Prevented job site accidents by adhering to established safety protocols during all phases of construction operations.
  • Facilitated smooth transportation of ready-mix concrete from delivery trucks to designated areas using wheelbarrows or motorized buggies when necessary.
  • Achieved consistent quality control by monitoring the mixing process of cementitious materials according to specified ratios and guidelines.
  • Demonstrated adaptability in working with diverse materials ranging from traditional Portland cement-based mixes to specialized products like epoxy resins or fiber-reinforced polymers.
  • Reduced material waste and costs through efficient utilization of resources, including proper storage and handling practices.
  • Expedited project timelines by coordinating closely with other tradespeople such as ironworkers or carpenters during multi-disciplinary jobsites activities.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Measured and marked areas for deploying concrete.
  • Handled repairs on concrete finishing equipment, keeping tools operational.
  • Wore correct clothing and protective equipment for jobs.
  • Prepared and placed concrete to create sidewalks, driveways, or patios.
  • Troweled and finished concrete to create textured or decorative surfaces.
  • Installed forms for shaping, insulating, or creating decorative effects in concrete.
  • Cut, chipped, or sawed concrete to create desired shapes.
  • Applied sealers or waterproofing to concrete as required by project.
  • Inspected concrete structures for complete fills, defects, or damage.
  • Completed physically demanding tasks such as lifting up to [Number] pounds to move job materials.
  • Adhered to safety and reporting procedures.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Applied contraction, construction, or isolation joints in appropriate areas and situations.

Concrete Pump Operator/ Engineer

Carls Concrete Pumping
Desert Hot Springs, CA
01.2006 - 12.2021
  • Increased jobsite efficiency by coordinating with contractors and construction managers for proper concrete placement.
  • Performed pre-trip and post-trip inspections of concrete pumps according to regulations and checked brakes and fluid levels.
  • Cleaned concrete pumps at end of each project to keep in good working condition and to avoid breakdowns.
  • Demonstrated flexibility and adaptability in adjusting pumping methods based on unique job site conditions or challenges.
  • Reduced downtime by performing routine maintenance on concrete pump equipment, ensuring optimal performance.
  • Assisted in training new hires on concrete pump operation, contributing to a more skilled workforce.
  • Operated skid steer and excavator when necessary

Education

Auto Mechanics, Transmission, Hybrid Classes

College of The Desert
Palm Desert, CA

GED -

Palm Desert High School
Palm Desert, CA
2005

Skills

  • Demolition Work
  • Safety Protocols
  • Hand-tool proficiency
  • Site preparation
  • Concrete finishing
  • Edging and grooving
  • Finishing Techniques
  • Concrete Stamping
  • Waterproofing
  • Shotcrete Application
  • Scaffold building
  • Concrete Curing
  • Physical Strength
  • Critical Thinking
  • Building and Construction
  • Surface Leveling and Smoothing
  • Concrete forms
  • Chipping and Grinding
  • Measurements and Calculations
  • Concrete Spreading
  • Surface Finishing
  • Power Grinding
  • Concrete Finishing Brushes
  • Jointers and Edging Tools
  • Driver Signaling
  • Skilled Mechanic

Timeline

Concrete Laborer

Callaghan Concrete
10.2022 - Current

Concrete Pump Operator/ Engineer

Carls Concrete Pumping
01.2006 - 12.2021

Auto Mechanics, Transmission, Hybrid Classes

College of The Desert

GED -

Palm Desert High School
John Flanagan