Objective
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline

JOSE R SANCHEZ

Industrial Maintenance Group
SAN ANTONIO,TX
1
Certification
23
years of professional experience

Achieved employment with a forward-thinking company that maximizes utilization of technical expertise.,Directed electrical functions in the oil field, contributing to alignment with company goals and fostering professional development.,Delivered exceptional results in repairing, testing, adjusting, and installing electronic equipment, enhancing customer satisfaction through proficient service and familiarity with Windows applications.

Work History

Electric Technician

6 Years 4 Months
Industrial Maintenance Group | 05.2020 - Current
  • Responsible for trouble shooting motors ,relays ,PLC's,and installation of service panels,meter loops,service conductors conveyor systems,shakers ,and also operate machinery for digging and or spreading of dirt

I&E Technician

2 Months
Renegade Automation | 08.2019 - 10.2019
  • Working on pumping units doing Frac Interference as well as Wellhead recommissioning

Electrical Foreman

1 Year 2 Months
Great Basin Industrial | 04.2018 - 06.2019
  • Duties included conducting safety tailgate meetings ,give out work duties to crew ,inspecting all work done on facility, taking inventory and letting superintendent know results, assisting in any duties to help out superintendent including filling out reports , time off request, invoices and general paperwork as well as loading an unloading deliveries by fork lift and double checking materials

I&E Technician

1 Year 7 Months
Flow-Data Inc | 10.2015 - 05.2017
  • Commissioning of well site's , SWD's and compressor stations via CYGNET,also installed battery boxes ,solar panels,sunsaver's cell modems ,cell boosters and antenas and also install freewave radios and totalflows and make them communicate. I would also install cable tray and various sizes of conduit and panels ,pull wire and terminate

technican

1 Year 8 Months
DMC Carter Chambers | 08.2012 - 04.2014
  • Technican installing surefire and ultrafab products and maintaining and repairing these products as well as testing PRV's with nitrogen and setting them to set point or replacing them and document it on Valvekeep

electrician

3 Months
Bobcat Electrical&instrumentation | 09.2012 - 12.2012
  • Install ridged conduit of different sizes from 1/2 inch to 3 inch also installed lighting receptacles and to vru units ,pumps,generators, plc panels,installed cable tray,and pulled and installed different size conductor size wires and terminated the wires

ELECTRICAN

1 Year 3 Months
Ashley automation and technology | 05.2011 - 08.2012
  • Job runner in charge of work done for hunt oil,pionner oil,conoco phillips,marathon oil. for hunt oil we installed battery box with solar panel and conduit to well add ons and installed pressure transmitters,for pionner we installed pressure transmitters total flow and corriolus for condensate and gathering.for conoco phillips we insatalled battery box with solar panel and to measurment transmitter to record water flow by gallons and by barrels.for marathon oil we installed sams controller for pump jack and wire pump jack motor and aswell as wired the drip pot ,casing,tubing

welder

3 Months
CCC group inc | 01.2010 - 04.2010
  • Weld support brakets and vfd panels, plc panels and lighting along convayer system

Electrician/Welder

4 Months
CCC group inc | 08.2008 - 12.2008
  • Welded all supports and brackets for ridged pipe and fixtures pulled wire and structure welding,bent ridged pipe using triple nickle bender and terminate conductors.also operated skid steerer,front loader,boom forklift,boom lift, man lifts

Electrician

8 Months
Walker Engineering | 11.2007 - 07.2008
  • Installed various sizes of emt,ridged pipe, allthread ,kendoff strut disconnect boxes ,panels,racks for hanging panels .terminated various sizes of wire in panels and disconnect boxes pulled wire with wire pulling equipment& pulleys installed lighting fixtures ,receptacles,fire alarms ,exit signs, motors,vfd panels

Electrician

6 Months
CCC Group | 05.2007 - 11.2007
  • Installed cable trays, rigid piping, switch gear and electrical panals in a silica sand mine. Welded supports and brackets to install piping and trays. Terminated various sizes of electrical wire. Installed electrical components in wet and dry plant.

Electician

7 Months
Fred Clark | 03.2005 - 10.2005
  • Responsible for electrical upgrades in commercial buildings removeing old transformers and pipe as well as conductor upgrades.

Electician

1 Year 1 Month
Martin Wright Electic | 01.2004 - 02.2005
  • Electiciran helper bent EMT pipe with foot bender, pulled wire,installed receptacle boxes and fixtures

Education

- None Selected

J.Scheider and Associates,Ltd.
safety practices in off shore drilling platforms

- None Selected

pecpremier
saftey practices in the oil and gas industry

High School Diploma

Southside High School | San Antonio, TX

Skills

Achieved efficient installation of various electrical systems including conduits from half inch to six inch. Completed the installation of cable trays and welded supports for conduits
cable trays
and electrical panels with precision. Effectively set up start
run
and stop switches
switchgear
fixtures
and receptacles from ladders
man lifts
and JLG lifts. Enhanced customer satisfaction through effective service in credit card collections.

Certification

Apprentice Electrician, State of Texas

Additional Information

Willing to relocate. Available to start work immediately.

Timeline

Electric Technician

Industrial Maintenance Group
05.2020 - CurrentRead More

I&E Technician

Renegade Automation
08.2019 - 10.2019Read More

Electrical Foreman

Great Basin Industrial
04.2018 - 06.2019Read More

I&E Technician

Flow-Data Inc
10.2015 - 05.2017Read More

electrician

Bobcat Electrical&instrumentation
09.2012 - 12.2012Read More

technican

DMC Carter Chambers
08.2012 - 04.2014Read More

ELECTRICAN

Ashley automation and technology
05.2011 - 08.2012Read More

welder

CCC group inc
01.2010 - 04.2010Read More

Electrician/Welder

CCC group inc
08.2008 - 12.2008Read More

Electrician

Walker Engineering
11.2007 - 07.2008Read More

Electrician

CCC Group
05.2007 - 11.2007Read More

Electician

Fred Clark
03.2005 - 10.2005Read More

Electician

Martin Wright Electic
01.2004 - 02.2005Read More

Southside High School

High School Diploma
Read More

pecpremier

from None Selected
Read More

J.Scheider and Associates,Ltd.

from None Selected
Read More
JOSE R SANCHEZ