Achieved employment with a forward-thinking company that maximizes utilization of technical expertise.,Directed electrical functions in the oil field, contributing to alignment with company goals and fostering professional development.,Delivered exceptional results in repairing, testing, adjusting, and installing electronic equipment, enhancing customer satisfaction through proficient service and familiarity with Windows applications.
Work History
Electric Technician
6 Years 4 Months
Industrial Maintenance Group | 05.2020 - Current
Responsible for trouble shooting motors ,relays ,PLC's,and installation of service panels,meter loops,service conductors conveyor systems,shakers ,and also operate machinery for digging and or spreading of dirt
I&E Technician
2 Months
Renegade Automation | 08.2019 - 10.2019
Working on pumping units doing Frac Interference as well as Wellhead recommissioning
Electrical Foreman
1 Year 2 Months
Great Basin Industrial | 04.2018 - 06.2019
Duties included conducting safety tailgate meetings ,give out work duties to crew ,inspecting all work done on facility, taking inventory and letting superintendent know results, assisting in any duties to help out superintendent including filling out reports , time off request, invoices and general paperwork as well as loading an unloading deliveries by fork lift and double checking materials
I&E Technician
1 Year 7 Months
Flow-Data Inc | 10.2015 - 05.2017
Commissioning of well site's , SWD's and compressor stations via CYGNET,also installed battery boxes ,solar panels,sunsaver's cell modems ,cell boosters and antenas and also install freewave radios and totalflows and make them communicate. I would also install cable tray and various sizes of conduit and panels ,pull wire and terminate
technican
1 Year 8 Months
DMC Carter Chambers | 08.2012 - 04.2014
Technican installing surefire and ultrafab products and maintaining and repairing these products as well as testing PRV's with nitrogen and setting them to set point or replacing them and document it on Valvekeep
Install ridged conduit of different sizes from 1/2 inch to 3 inch also installed lighting receptacles and to vru units ,pumps,generators, plc panels,installed cable tray,and pulled and installed different size conductor size wires and terminated the wires
ELECTRICAN
1 Year 3 Months
Ashley automation and technology | 05.2011 - 08.2012
Job runner in charge of work done for hunt oil,pionner oil,conoco phillips,marathon oil. for hunt oil we installed battery box with solar panel and conduit to well add ons and installed pressure transmitters,for pionner we installed pressure transmitters total flow and corriolus for condensate and gathering.for conoco phillips we insatalled battery box with solar panel and to measurment transmitter to record water flow by gallons and by barrels.for marathon oil we installed sams controller for pump jack and wire pump jack motor and aswell as wired the drip pot ,casing,tubing
welder
3 Months
CCC group inc | 01.2010 - 04.2010
Weld support brakets and vfd panels, plc panels and lighting along convayer system
Electrician/Welder
4 Months
CCC group inc | 08.2008 - 12.2008
Welded all supports and brackets for ridged pipe and fixtures pulled wire and structure welding,bent ridged pipe using triple nickle bender and terminate conductors.also operated skid steerer,front loader,boom forklift,boom lift, man lifts
Electrician
8 Months
Walker Engineering | 11.2007 - 07.2008
Installed various sizes of emt,ridged pipe, allthread ,kendoff strut disconnect boxes ,panels,racks for hanging panels .terminated various sizes of wire in panels and disconnect boxes pulled wire with wire pulling equipment& pulleys installed lighting fixtures ,receptacles,fire alarms ,exit signs, motors,vfd panels
Electrician
6 Months
CCC Group | 05.2007 - 11.2007
Installed cable trays, rigid piping, switch gear and electrical panals in a silica sand mine. Welded supports and brackets to install piping and trays. Terminated various sizes of electrical wire. Installed electrical components in wet and dry plant.
Electician
7 Months
Fred Clark | 03.2005 - 10.2005
Responsible for electrical upgrades in commercial buildings removeing old transformers and pipe as well as conductor upgrades.
Electician
1 Year 1 Month
Martin Wright Electic | 01.2004 - 02.2005
Electiciran helper bent EMT pipe with foot bender, pulled wire,installed receptacle boxes and fixtures
Education
- None Selected
J.Scheider and Associates,Ltd.
safety practices in off shore drilling platforms
- None Selected
pecpremier
saftey practices in the oil and gas industry
High School Diploma
Southside High School | San Antonio, TX
Skills
Achieved efficient installation of various electrical systems including conduits from half inch to six inch. Completed the installation of cable trays and welded supports for conduits
cable trays
and electrical panels with precision. Effectively set up start
run
and stop switches
switchgear
fixtures
and receptacles from ladders
man lifts
and JLG lifts. Enhanced customer satisfaction through effective service in credit card collections.
Certification
Apprentice Electrician, State of Texas
Additional Information
Willing to relocate. Available to start work immediately.