Summary
Overview
Work History
Education
Skills
Languages
Certification
Accomplishments
Timeline
Generic

Juan Matos

DeBary,FL

Summary

Hands-on Project Manager recognized for flawless execution and finding solutions to complex problems. Communicative and reliable professional polished in developing scopes and objectives and maintaining comprehensive project documentation. Commended for unexcelled record of completing critical projects on schedule and within budget.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Mitigation and Reconstruction Project Manager

PuroClean of Longwood
Longwood, FL
09.2019 - 10.2024
  • Develop emergency response plans in the event of an incident or disaster.
  • Planned, organize and direct operations of multiple units to maximize productivity and profitability.
  • Develop operational strategies to improve efficiencies using IICRC Standards.
  • Arrive first to the jobsite and used excellent verbal skills to engage customers in conversation and effectively determine needs and requirements.
  • Perform inspection and determine source of loss, evaluate and analyze the loss to determine the scope of work.
  • Prepare the schedules for all the technicians and the lead technicians and assign specific duties.
  • Maintain daily logs of labor and equipment used on-site, revised dry-logs and verify all the process using the Mitigation Programs (Corelogic, Mitigate, Mica, Encircle and Purologic).
  • Monitor the Mitigation progress by establishing plans, budgets and measuring results.
  • Coordinate financial or budget activities to fund operations and maximize profits in Commercial and Residentials claims.
  • Inspect right set up of drying system (equipment, tools, materials, and safety equipment) to ensure quality standards were met.
  • Communicate regularly with subcontractors regarding project timelines in the Reconstruction side.
  • Oversee activities of subcontractor's personnel assigned to various tasks during construction jobs.
  • Supervise Reconstructions projects to uphold schedule requirements and quality demands.
  • Assists in developing scopes of work for bid packages (T&M for Commercial jobs)
  • Present and prepare Xactimate estimates according to the scope of work created by myself or by the lead technicians, made sure that the descriptive information is accurate to be uploaded to Xactware.
  • Communicate with the Mitigation crew members to demonstrate high standards and mitigate issues.
  • Delegate duties to the Mitigation crew members based on skillset.
  • Track and report units and labor hours prior to submission of timecards.
  • Review project blueprints and specifications to determine number of workers needed to complete jobs and arrange meetings regarding Production with Project Coordinators in the Commercial line.
  • Monitor equipment operation during extraction process to detect and prevent problems in the Reconstruction.
  • Asses potential commercial losses to ensure in accordance with applicable laws and regulations.
  • Maintain detailed records of all claim activities in a timely manner in Residential and Commercial losses.
  • Evaluate coverage based on analysis of facts, law, policy language and endorsements.
  • Review property damage estimates for accuracy and completeness.
  • Document date, parties involved and specific details about losses.
  • Resolve mitigation concerns to the homeowner by providing relevant details through the process.
  • Conduct on-site inspections of property damage to assess repair needs and costs.
  • Estimate costs on site and recommend potential solutions.
  • Produced preliminary estimates based on schematic and design development level documents.
  • Monitored daily activities of technicians to ensure compliance with local, state and federal regulations.
  • Developed mitigation strategies to reduce risk and increase safety in the jobsites.
  • Served as a liaison between Director and Mitigation departments when coordinating responses to environmental emergencies.
  • Complete and maintain mitigation operations standards each day.
  • Resolved customer inquiries and complaints requiring management-level escalation.
  • Delegated work to the crew, setting priorities and Mitigation goals.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs (Crawford Contractor Connection, Accuserve, Claims Connect, GHRN, Alacrity, ASI CIY, DCMG, PS, MaintenX International).
  • Reviewed employee performance and provided ongoing feedback and coaching to drive performance improvement through Supervisors, Lead Technicians and Technicians.
  • Reviewed completed work to verify consistency, quality, and good performance.
  • Produced thorough, accurate and timely reports of project activities.
  • Implemented quality control measures to uphold company standards.
  • Oversaw inventory management activities at each site including ordering supplies as needed.
  • Reviewed Mitigations reports monthly to analyze sales. budget goals, customer satisfaction levels met.
  • Directed day-to-day operations by spearheading implementation of short-term and long-term strategies to achieve business plan and profitability goals in the Mitigation Department.
  • Built strong operational and functional crews with a minimum of one Lead Technician and two technicians to meet process and production demands.
  • Analyzed and controlled building materials, supplies and equipment needed through the Mitigation project to evaluate the operational expenses.
  • Organize meetings with clients to discuss project specifications through the Mitigation and Reconstruction process.
  • Communicate with suppliers and coordinate delivery of supplies to job sites (Aramsco, Jon-Don, Artemis, Myco).
  • Report project progress, site problems and labor status to supervisors in Commercial jobs.
  • Kept production crew moving forward for progress in daily site operations.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Recruit and train new employees to meet job standards requirements.
  • Guide employees on understanding and meeting changing customer needs and expectations.
  • Create and manage budgets for travel, training, and team-building activities.
  • Identify areas of deficiency and performed root-cause analysis to solve problems in each mitigation project.
  • Ensure all workers adhere to company policies and procedures.
  • Develop and implement safety protocols for the team.
  • Provide guidance, direction, and technical assistance to Mitigation crew in all the levels (Supervisors, Lead Technicians, Technicians and Temporary workers).
  • Analyze customer feedback concerning the scope of work to identify opportunities for improvement in services offered.
  • Negotiate contracts with vendors to secure best prices for goods and services needed.
  • Connect with clients and develop strategies to achieve sales and customer service goals.

Education

Domingo Aponte Collazo
Puerto Rico

Skills

  • Commercial Mitigation experience
  • Disaster Recovery Methodologies
  • Project Planning
  • Workforce training
  • Strategic Planning
  • Project Management
  • Data Analysis
  • Project scope

Languages

English
Native/ Bilingual
Spanish
Native/ Bilingual

Certification

IICRC Certifications:

- Water Damage Restoration (WRT)

- Applied Structural Drying (ASD)

- Fire and Smoke Damage Restoration (FSRT)

- Odor Control (OCT)

- Applied Microbial Remediation (AMRT)

- Commercial Drying (CDS)

Accomplishments

  • NORMI Certifications:

- Mold Assessor

- Mold Remediator

* Commercial Large Loss Project Management by IICRC

* Microbial Warrior International:

- Certified Forensic Operator

- High Risk / High Level Decontamination Specialist

* Bloodborne Pathogens & OPIM.

* 40 Hours Hazwoper Certification + Update 8 Hours.

Timeline

Mitigation and Reconstruction Project Manager

PuroClean of Longwood
09.2019 - 10.2024

IICRC Certifications:

- Water Damage Restoration (WRT)

- Applied Structural Drying (ASD)

- Fire and Smoke Damage Restoration (FSRT)

- Odor Control (OCT)

- Applied Microbial Remediation (AMRT)

- Commercial Drying (CDS)

Domingo Aponte Collazo
Juan Matos