
Dedicated to supporting Amazon, RME, and end customers by fostering an efficient and safe working environment through adherence to relevant standards and policies. Committed to developing a robust planning strategy for shift coverage on critical equipment PMs, along with proactive daily monitoring of spare parts inventory. Focused on creating a culture of training and development, empowering SMRTs to mentor and cultivate MRTs while ensuring balanced and complementary skill sets. This holistic approach enhances operational efficiency and contributes to a sustainable workforce capable of meeting evolving challenges.
Executed shift planning related to current backlogs and daily department goals.
Allocate labor quarterly and lead quarterly sync meetings with ICQA leadership team.
Lead safety circles for the department.
Assisting associates on the floor related to removing their barriers and teaching them proper standard work to ensure the highest standards can be maintained building wide.
Built 8 week indirect roster for ICQA associates to maintain transparency and consistency among all associates across all shifts.
Designed layout for new push cart for ICQA associates to use to mitigate the number of injuries and amcare reports being experienced as a result of previously flawed design.
Altered and amended the standard work surrounding the damage process in ICQA, thus resulting in a 25uph improvement in that specified process path.
Created power point presentations and trainings to use new problem solve tools being rolled out to the FC.
Created Ship Dock problem solve position and training materials as well as trained all dock problem solvers.
problem solve peak planning to ensure that OB had enough available OOPS chutes and equipment to account for projected peak volumes.
Deep dive large scale issues related to AFE and the Mezz in regards to units being virtually deleted by the system.
Deep dive and bridge DEA misses related to the IB and OB docks at PHX6.
Coordinated rhetoric and materials for the site IRDR walk as well as leading the IRDR walk with the sites Sr. team.
Ensure Sox compliance was maintained for site.
Research and validate IRDR defects as they related to IB, OB and ICQA.
Lead Problem Solver/CPT Operator
Clear all CPT prior to slam pad cutoff.
Lead team of up to 8 problem solvers daily.
Train and develop new problem solvers in OB – Trained 28 new problem solvers in 2016 for OB.
Back up pack PA/Process Guide
Plan wall staffing for AFE to maintain balance with sorters.
Obtain accurate HC’s to report to central flow.
Coach and help associates who are below rate to remove barriers.
Conduct stand ups in the absence of the manager.