Overview
Work History
Education
Languages
Timeline
Generic

Julio Olvera

Ennis,TX

Overview

26
26
years of professional experience

Work History

Machinist, Welder

Riley’s Industrial
Ennis, TX
03.2008 - Current
  • Set up and operated various machine tools to produce precision parts and instruments.
  • Performed routine maintenance on machinery, including lubrication, cleaning.
  • Maintained quality and safety standards; kept records of maintenance and repair work.
  • Calculated dimensions and tolerances using knowledge of mathematics and instruments such as micrometers or vernier calipers.
  • Read blueprints, skhes, drawings, manuals, specifications or sample part to determine dimensions and tolerance of finished work piece.
  • Measured, marked and scribed dimensions and reference points on material or work pieces as guides for subsequent machining.
  • Aligned components for assembly according to blueprint specifications using measuring instruments such as calipers or dial indicators.
  • Drilled holes in parts using drill presses.
  • Operated manual lathes to turn down shafts and cut threads into them.
  • Assembled machined parts into mechanical units using hand tools and power tools.
  • Changed worn cutting tools as needed during operation.
  • Used grinding equipment for finishing surfaces and sharpening cutting edges on machined parts.
  • Kept accurate records regarding production numbers and any repairs performed on machinery.
  • Operated hand tools, drill presses, riveting machines and tap burners to safely produce projects.
  • Selected appropriate speeds and feeds according to metal type and finish specifications.
  • Operated forklift to place finished products on skids and transport to warehouse.
  • Welded, heat treated and repaired worn and damaged equipment to optimize performance.
  • Set up, adjusted and operated basic or specialized machine tools to perform precision machining operations.
  • Fabricated and welded components to assemble structural forms, such as machinery frames, tanks, pressure vessels, and furnace shells.
  • Repaired broken or cracked parts using cutting torches and welding equipment.
  • Utilized oxyacetylene torches for preheating metals prior to welding or bending them into desired shapes.

Master Production Scheduler

Sealed Air Corp.
Grand Prairie, TX
11.1997 - 01.2008
  • Developed and maintained master production schedule to ensure optimal productivity and customer satisfaction.
  • Monitored weekly schedules to identify potential conflicts or delays in production processes.
  • Analyzed raw material inventories to determine future product needs and adjust the master production schedule accordingly.
  • Collaborated with purchasing team to ensure sufficient supply of materials for production operations.
  • Utilized MRP system to create accurate forecasts of finished goods requirements.
  • Communicated changes in production scheduling with internal teams such as manufacturing, engineering, and quality control departments.
  • Worked closely with sales representatives to understand customer demand patterns and account for them in the master schedule.
  • Assisted in creating long-term planning strategies for meeting future customer demands.
  • Conducted meetings with management staff on a regular basis to discuss current status of orders and any related issues that may arise.
  • Resolved any discrepancies between forecasted demand versus actual demand by adjusting the master production schedule accordingly.
  • Coordinated with clients and management to stay up-to-date on progress.
  • Utilized information-gathering techniques while analyzing and identifying implications to make correct planning and scheduling decisions.
  • Eliminated process discrepancies, implementing continuous improvements for scheduling procedures.
  • Reviewed material shortages, stock outages and safety stock levels while working with buyers, material planners, schedulers and manufacturing to meet customer requirements.
  • Managed movement of materials and product through production.
  • Distributed work orders to departments.
  • Contacted suppliers to verify shipment details.
  • Received incoming shipments and reviewed contents against purchase order for accuracy.
  • Provided technical assistance and information to staff regarding planning program areas and ordinances.

Education

Physics And Mathematics - IT

UTA
Arlington, TX
03-2005

Languages

Spanish
Native/ Bilingual

Timeline

Machinist, Welder

Riley’s Industrial
03.2008 - Current

Master Production Scheduler

Sealed Air Corp.
11.1997 - 01.2008

Physics And Mathematics - IT

UTA
Julio Olvera