Hardworking professional with several years of experience completing high-quality concrete projects. Practiced at preparing site, building forms and pouring concrete.
Overview
2
2
years of professional experience
Work History
Concrete Finisher
MEB Construction
Chesapeake
08.2024 - 05.2025
Finished surfaces by hand-troweling or machine-troweling for a smooth finish.
Applied hardening compounds to protect the surface from weathering and staining.
Assisted in setting up formwork prior to pouring concrete.
Leveled and smoothed freshly placed concrete with a straight edge or float.
Sprayed curing compound on newly finished surfaces as needed.
Prepared mixtures of sand, gravel, cement and water according to specified proportions.
Inspected work sites to ensure that all safety protocols were followed.
Installed expansion joints, sealants, coatings, and other protective treatments according to specifications.
Performed daily maintenance checks on equipment used during job such as wheelbarrows, shovels.
Followed instructions given by supervisors regarding job requirements such as depth and width measurements.
Mixed, poured and spread concrete using a variety of tools including trowels, floats and screeds.
Cleaned work area at end of each shift removing debris, unused material.
Repaired damaged areas of existing concrete structures using appropriate materials.
Worked with teammates to move steel forms.
Compacted grade using jumping jack or plate compactor equipment.
Finished surfaces by troweling, floating and brushing following project requirements and specifications.
Dismantled forms using basic and advanced tools.
Constructed forms to create various concrete structures.
Positioned wire mesh and rebar to reinforce concrete.
Set up scaffolding, braces, and other temporary structures to support crew during work.
Used forklifts and other equipment to move materials and complete project work with construction team.
Prepared concrete by hand mixing sand and cement.
Poured concrete into forms using pump hose and leveled.
Maintained safety of work areas by adhering to strict regulations.
Placed steel pins using sledgehammer.
Laid and repaired concrete to make level and long-lasting surfaces.
Used numerous types of power tools and other equipment daily.
Removed debris and waste to clean site after completing work.
Removed rough or defective spots from concrete surfaces, using power grinder, or chisel and hammer.
Molded expansion joints and edges using edging tools, jointers, and straightedge.
Protected surfaces from avoidable damages by using correct forming, bracing, preparation, and finishing techniques.
Installed anchor bolts, steel plates and other fixtures in freshly poured concrete.
Produced rough concrete surface using brooms.
Used various chemicals and tools to repair damaged items.
Signaled truck driver to pour concrete and move chute, directing concrete on forms.
Built forms to specific dimensions to shape wet concrete.
Set concrete forms to desired pitch and depth and aligned.
Mixed and poured concrete according to standard ratios.
Spread, leveled and smoothed concrete using rake or shovel.
Prioritized tasks for each job after reading project blueprints and documents.
Repaired unsafe curbs, gutters, sidewalks, driveways and roadways.
Shaped rounded edges on corners with edger tool and created grooves to control cracking.
Journeyman Concrete Finisher
Ryan Infrastructure
Suffolk
05.2023 - 07.2024
Loaded bags of dry ingredients into mixing machines per instructions from supervisors.
Performed repairs on existing concrete structures using patching compounds and other materials.
Removed excess concrete from finished surfaces with edgers or power saws.
Assisted in setting up scaffolding or ladders when needed at the job site.
Sealed cracks in existing pavement surfaces with epoxy patches where necessary.
Cut control joints into hardened slab surfaces using diamond blades or saws.
Installed forms for sidewalks, curbs, steps, gutters. prior to pouring concrete.
Applied hardening agents to newly-poured concrete surfaces to strengthen them.
Leveled surface of freshly-poured concrete with a screed board.
Smoothed the surface of the concrete with finishing tools such as floats and trowels.
Sprayed curing compounds on recently-finished surfaces to protect them from damage.
Set expansion joints in freshly-poured slabs using groovers or jointers as required.
Prepared and measured materials for concrete mixture.
Mixed and poured concrete using wheelbarrows, shovels, trowels, and other hand tools.
Operated power vibrators to compact wet cement mix into desired shape and finish.
Cleaned up job sites by sweeping away debris after completion of project.
Laid and repaired concrete to make level and long-lasting surfaces.
Operated excavators and loaders to prepare site.
Used forklifts and other equipment to move materials and complete project work with construction team.
Worked with teammates to move steel forms.
Upheld requirements for safe operations and reporting of incidents.
Maintained safety of work areas by adhering to strict regulations.
Dismantled forms using basic and advanced tools.
Used numerous types of power tools and other equipment daily.
Constructed forms to create various concrete structures.
Finished surfaces by troweling, floating and brushing following project requirements and specifications.
Poured concrete into forms using pump hose and leveled.
Placed steel pins using sledgehammer.
Compacted grade using jumping jack or plate compactor equipment.
Prepared concrete by hand mixing sand and cement.
Positioned wire mesh and rebar to reinforce concrete.
Set up scaffolding, braces, and other temporary structures to support crew during work.
Removed debris and waste to clean site after completing work.
Loaded and unloaded necessary tools, materials, and machines from trucks and trailers.
Inspected and maintained tools and equipment.
Molded expansion joints and edges using edging tools, jointers, and straightedge.
Removed rough or defective spots from concrete surfaces, using power grinder, or chisel and hammer.
Spread, leveled and smoothed concrete using rake or shovel.
Created requested finishes and results using small gravel for pebble appearance and other techniques.
Built forms to specific dimensions to shape wet concrete.
Shaped rounded edges on corners with edger tool and created grooves to control cracking.
Set concrete forms to desired pitch and depth and aligned.
Produced rough concrete surface using brooms.
Restored damaged and worn stonework on old buildings or sites.
Installed anchor bolts, steel plates and other fixtures in freshly poured concrete.
Mixed and poured concrete according to standard ratios.