Mr. Strott has 42 years of experience in heavy utility construction. He began his career in the field as a laborer and has worked his way up to the role as Executive Vice President, making him well versed in all phases of utility construction. Mr. Strott has extensive experience in project oversight as well as detailed management of large diameter pipelines projects and with quality assurance and quality control on multiple projects at Denver International Airport.

Work History

Project Executive

Dominion Water & Sanitation District
- 09.2020
  • Progressive Design-Build, High Zone Tank: Dominion Water & Sanitation District, Castle Rock, CO – Project Executive
  • As an addition to the aforementioned Eastern Pipeline Project, this approximately $4.5M project will include site preparation, a 2 million gallon prestressed concrete water storage tank, construction of approximately 780 feet of 24” DIP, 134 feet of 30” DIP and 450 feet of 30” steel pipe, GESC, overflow headwall, & inlet and outlet valve vaults
  • Estimated Completion September 2020.

Project Executive

Dominion Water & Sanitation District
- 06.2020
  • Progressive Design-Build, Eastern Pipeline Project: Dominion Water & Sanitation District, Castle Rock, CO – Project Executive
  • This $39.9M project will include design and construction of pipeline between the Town of Castle Rock and the DWSD Middle Pressure Zone Tank
  • The first phase of this 3-phase project for the DWSD is currently under construction and it consists of the installation of approximately 11,500 LF of 24” DIP and 14,600 LF of 30” welded steel pipe across open country
  • The remaining two phases of this 3-phase project are under the finalization of design and securing necessary permits
  • Estimated Completion June 2020.

Project Executive

Denver Water
- 12.2019
  • Conduit 16: Denver Water, Denver, Colorado – Project Executive
  • This project consisted of the construction for Conduit No
  • 16 Tunnel installations
  • There were five tunnels total
  • Contract Amount $22.4M
  • Completed December 2019.

Project Executive

North Washington Water & Sanitation District
- 11.2019
  • East 69th Avenue & Race Street: North Washington Water & Sanitation District, Denver, CO – Project Executive
  • This project consisted of replacing an existing 8” DIP with 2,313 LF of 8” C900 PVC pipeline and corresponding service reconnections, valves, fire hydrants and pavement replacement
  • November 2019
  • Contract Amount $347,000.

Project Executive

City of Westminster
- 11.2018
  • Little Dry Creek Interceptor Sewer Improvements – BP 1A: City of Westminster, Westminster, CO – Project Executive
  • This project consisted of the replacement of a water transmission main in Sheridan Boulevard which included a large water main that served vast areas of south Westminster with 6,668 LF of 16” through 6” PVC & DIP
  • This project also consisted of the replacement of wastewater pipeline in Sheridan Boulevard which included a large sewer pipeline that served the southern third of the city with 6,845 LF of 21” through 6” PVC
  • And lastly it consisted of asphalt patching and paving of the streets in conjunction with open cut pipeline work, streets were repaired and resurfaced to address age and condition issues, and customer connections to the new pipelines
  • Contract Amount $8.4M
  • Completion November 28, 2018.

Project Executive and Project Manager

Parker Water & Sanitation District
- 09.2018
  • Progressive Design- Build WRCP Canyon Hess WISE Infrastructure Project: Parker Water & Sanitation District, Parker, CO – Project Executive and Project Manager
  • This was a $45M project with our portion being $13.6M
  • This project was part of the WISE program to complete water conveyance of shared resources from the Town of Parker to Castle Rock
  • It included 19,000 feet of 36” Steel Potable Water to complete the connection from the Town of Castle Rock to a new treatment facility, and over 27,000 feet of 8”-20” raw waterline to complete the interconnection of existing well facilities
  • Completed September 2018.

Project Executive and Sr. Project Manager

Parker Water & Sanitation District
- 01.2018
  • Ridgegate Line/Rueter-Hess WISE Infrastructure Project: Parker Water & Sanitation District, Parker, CO – Project Executive and Sr
  • Project Manager
  • This $15M project consisted of approximately 4.5 miles of 42-inch Welded Steel Potable Water Pipeline, 5 trenchless roadway crossings, flow control structures, ammonia storage facility, and miscellaneous improvements at the Rueter-Hess Water Purification Facility
  • The south end of the project began at the water purification facility and moved cross country north along the edge of existing subdivisions and 2,600 feet thru collector streets ending just north of E-470
  • This project used 22,202 LF of open-cut 42” diameter steel water pipeline with an average bury depth of 12.46 feet
  • This project began in June 2016 reached completion January 2018.

Project Executive

City and County of Denver
- 07.2017
  • South Broadway Reconstruction Arizona Ave to Kentucky Ave: City and County of Denver, Denver, CO – Project Executive
  • This $2M project installed 3,363 LF of 15” to 36” RCP; 43 LF of 12” Corrugated Steel; 3,054 LF of 3”, 6”, 8” and 12” DIP; 1,041 LF of 30” Welded Steel; 169 LF of ¾” Copper; 50 LF of ¾” Copper (Type K); 27 LF of 1” Copper; 100 LF of 1” Copper and 21 Manholes
  • Completion July 2017.

Project Executive

City of Aurora
- 05.2017
  • Rampart Pipeline Phase 3: City of Aurora, Aurora, CO – Project Executive
  • This $2.8M project consisted of the rehabilitation of appurtenances on the Rampart Waterline, including blow-offs in manholes, air vacuum release valves, and butterfly valves connecting the 54” and 40” pipeline
  • Completed May 2017.

Project Executive and starting Project Manager

Town of Milliken
- 11.2016
  • East Side Water and Sewer: Town of Milliken, Milliken, CO – Project Executive and starting Project Manager
  • This $2.5M project consisted of the expansion of the town’s water and sewer system in order to service future development
  • It included the installation of 11,400 LF of 16”, 8” water and 5,450 LF of 12”, 15”, 21”, and 30” sanitary sewer with dewatering
  • The project began in March 2016 and completed in November 2016.

Project Executive

City of Aurora
- 09.2016
  • Sable City Center, Alameda Ave & Sable Blvd: City of Aurora, CO – Project Executive
  • This $5M project consisted of sanitary sewer improvements, storm drainage improvements with installation of 108” diameter reinforced concrete pipe and bend with access manhole, type C inlet, bubbler structure, 12’ x 20’ pedestrian undercrossing of Alameda Avenue, asphalt paving, and other miscellaneous work
  • Completion September 2016.

Project Executive

Colorado Springs Utilities
- 11.2015
  • Highline Transmission Main Phase II: Colorado Springs Utilities, Colorado Springs, CO – Project Executive
  • Expanding the city's potable water capability, including 6,755 LF of 24" WSP and 5,714 LF of 30" WSP
  • Completed November 2015.Contract Amount $5.7M.

Project Executive

City of Loveland Water & Power
- 04.2015
  • River Crossings Replacement Project FL W07C: City of Loveland Water & Power, Loveland, CO – Project Executive
  • This $1.3M project replaced 2-36” steel transmission waterline crossings for the City of Loveland after their September 2013 flood on the Big Thompson River with 610 LF of 36” welded steel pipe and 542 LF of 20” DIP
  • Completed April 2015.

Project Executive

City of Loveland
- 03.2015
  • Meadows Transmission Line Replacement: City of Loveland, Loveland, CO – Project Executive
  • This project consisted of furnishing and installing 4,555 LF of 48” WSP waterline with appurtenances, cast-in-place valve vaults, air/vac vaults, blowoffs with structures, rock excavation, waterline hydrostatic testing, cathodic protection, 9,800 cy of riverbank riprap armoring, approximately 10,000 cy of earthwork to reestablish the floodplain, construction of a 4,325 LF recycled asphalt access roadway, and reclamation for City of Loveland
  • Completed March 2015
  • Contract Amount $3.3M.

Project Executive

Colorado Springs Utilities
- 01.2015
  • Highline Transmission Main Phase I: Colorado Springs Utilities, Colorado Springs, CO – Project Executive
  • The $5.9M installation of 1,081 LF of 30”, 4,509 LF or 36”, and 6,903 LF of 42” welded steel pipe
  • This project began August 31, 2013 and ended January 28, 2015.

Project Executive

City and County of Denver
- 12.2014
  • Parkhill Storm PH IV-A/51st and St
  • Paul Sanitary: City and County of Denver, Denver, CO – Project Executive
  • The project was a Storm and Sanitary open cut project that included 2,356 LF of 84” diameter storm sewer and 2,124 LF of Sanitary (27” to 24”) and 2,420 LF of 12” PVC
  • Approximately 143 LF of 84” storm and a similar amount of sanitary main was jacked and bored under BNSF railroad
  • From September 3, 2013 through December 31, 2014
  • Contract Amount $5.8M.

Sr. Project Manager

Colorado Springs Utilities
- 03.2014
  • Southern Delivery System N1C/N2A: Colorado Springs Utilities, Colorado Springs, CO – Sr
  • Project Manager
  • This $24.7M project installed 6.1 miles of 66” steel raw water pipeline and included three air vac structures and four blowoff structures
  • The pipe was welded and surrounded with CLSM
  • 240’ bore, 84”casing
  • This project began June 11, 2013 and lasted through March 15, 2014.

Project Manager

Motlz Constructors/Burns & McDonnell
- 10.2013
  • Design-Build Northlands Lift Station Force Mains-Phase 1: Subcontractor to Motlz Constructors/Burns & McDonnell, Broomfield, CO – Project Manager
  • Project consisted of 2180 LF of 18” force main, 2760 LF of 14” force main, and 8970 LF of 12” force main with fusible PVC as the material installed
  • Installation of 4130 LF of 24” gravity sewer
  • Installation of 3000 LF of waterline
  • All piping installed was to accommodate a new design build sewer lift station for the City and County of Broomfield
  • Contract Amount $3.1M
  • Completion October 2013.

Project Manager

Denver Water
- 10.2012
  • Conduit 151: Denver Water, Denver, CO – Project Manager
  • The most notable achievement was the 906 LF I-70 bore; the longest bore of its kind (micro-tunnel) and size (42” casing) performed successfully for Denver Water to date
  • The project included a crossing of Sand Creek which required a steam diversion and treatment of groundwater to remove heavy metals
  • Complete October 2012
  • Contract Amount $5.6M.

Sr. Project Manager

Colorado Springs Utilities
- 09.2012
  • Southern Delivery System S3: Colorado Springs Utilities, Pueblo, CO – Sr
  • Project Manager
  • This $22M project consisted of installation of approximately 40,160 LF of 66” diameter welded steel pipe
  • Six combination air release vacuum valve assemblies and vaults
  • Four blowoff assemblies, eleven buried access manways
  • Installation of approx
  • 261 LF of trenchless method pipeline crossing Steel Hollow
  • This project began November 14, 2011 lasted through September 27, 2012.

Project Executive

City of Greeley
- 10.2010
  • Bellvue Transmission Main, Vine Drive Segment: City of Greeley, Fort Collins, CO – Project Executive
  • This $8.5M project installed 14,890 LF of 60” DIP waterline main, two 72” jacked steel casing tunnels, including 123 LF beneath College Avenue, a main thoroughfare of Fort Collins and 200 LF beneath a BNSF railroad and Vine Drive
  • This project started on October 15, 2009 and reached completion in October 2010.

Project Manager

Lower Fountain Metro Sewage Disposal District
- 08.2010
  • LFMSDD Interceptor Sewer-Phase 1: Lower Fountain Metro Sewage Disposal District, Fountain, CO – Project Manager
  • This $4.9M project made improvements to the wastewater collection system including approx
  • 32,000 LF of 24” and 30” dia
  • PVC pipe complete with excavation and compacted backfill
  • This project started October 2, 2009 and ended August 1, 2010.

Project Manager

Aurora Water
- 06.2010
  • Prairie Waters Package G – Segment 1: Aurora Water, Aurora, CO – Project Manager
  • This $55.5M project installed approximately 12.8 miles of 60” diameter epoxy-coated mortar-lined steel pressure water pipeline with an average depth of bury at 18 feet deep
  • Completed June 2010.

Education

Skills

  • Budget Development
  • Construction management
  • Strategic Planning
  • Staff Management
  • Project Management
  • Project estimation and bidding
  • Contract Management
  • Quality Assurance
  • Team Leadership
  • Relationship Building
  • Stakeholder Relations
  • Team Collaboration
  • Work Planning and Prioritization
  • Customer Relationship Management
  • Detail Oriented
  • Budget Control
  • Project Scheduling

Total Years Experience

42

Joined Company

2000

Primary Language

English

Personal Information

Title: Project Executive/ Constructability/ Value Engineering

References

  • Rebecca Tejada, P.E., Senior Project Manager, Parker Water & Sanitation District, 18100 Woodman Dr., Parker, CO, 80134, (720) 842-4261, RTejada@pwsd.org
  • Mert Wiechman, President, SDG Incorporated, 333 West Hampden Ave., Ste. 700, Englewood, CO, 80110, (303) 781-7070, mertw@sdgdenver.com
  • Randall Parks, Project Manager, Dewberry, 990 S. Broadway #400, Denver, CO, 80209, (303) 825-2322, Rparks@dewberry.com

Timeline

Project Executive

Dominion Water & Sanitation District
- 09.2020

Project Executive

Dominion Water & Sanitation District
- 06.2020

Project Executive

Denver Water
- 12.2019

Project Executive

North Washington Water & Sanitation District
- 11.2019

Project Executive

City of Westminster
- 11.2018

Project Executive and Project Manager

Parker Water & Sanitation District
- 09.2018

Project Executive and Sr. Project Manager

Parker Water & Sanitation District
- 01.2018

Project Executive

City and County of Denver
- 07.2017

Project Executive

City of Aurora
- 05.2017

Project Executive and starting Project Manager

Town of Milliken
- 11.2016

Project Executive

City of Aurora
- 09.2016

Project Executive

Colorado Springs Utilities
- 11.2015

Project Executive

City of Loveland Water & Power
- 04.2015

Project Executive

City of Loveland
- 03.2015

Project Executive

Colorado Springs Utilities
- 01.2015

Project Executive

City and County of Denver
- 12.2014

Sr. Project Manager

Colorado Springs Utilities
- 03.2014

Project Manager

Motlz Constructors/Burns & McDonnell
- 10.2013

Project Manager

Denver Water
- 10.2012

Sr. Project Manager

Colorado Springs Utilities
- 09.2012

Project Executive

City of Greeley
- 10.2010

Project Manager

Lower Fountain Metro Sewage Disposal District
- 08.2010

Project Manager

Aurora Water
- 06.2010

Kevin Strott