Summary
Overview
Work History
Education
Skills
Timeline
Generic

Lary Hall

Grove City

Summary

Skilled in power tool operation and renowned for exceptional attention to detail, I excel in countertop fabrication and installation, as demonstrated at Murry Display Fixtures. My proactive approach in adapting to project changes and enhancing team communication has significantly increased customer satisfaction, showcasing my ability to meet tight deadlines and deliver high-quality products.

Dependable self-starter experienced in manufacturing production, assembly, quality assurance and machine operation and maintenance.

Overview

10
10
years of professional experience

Work History

Countertop Fabricator, Install

Murry Display Fixtures
10.2020 - 03.2023
  • Consistently met project deadlines through effective time management skills and efficient work processes.
  • Assisted in the development of new product offerings through research into emerging trends within the countertop industry.
  • Facilitated smooth communication between team members, ensuring everyone was aligned on project goals, timelines, and expectations.
  • Increased customer satisfaction by delivering high-quality countertops with a focus on craftsmanship and attention to detail.
  • Adapted quickly to changing project requirements or unexpected issues that arose during countertop fabrication processes.

Forklift Driverwest Mail

SURGE Saffing
03.2013 - 10.2020
  • Operated forklift to transport materials around warehouse.
  • Ensured safe stacking of products in designated areas.
  • Inspected equipment daily for proper functioning.
  • Used hand signals to guide team during loading and unloading.
  • Loaded and unloaded goods from trucks and shelves.
  • Maintained a safe work environment by adhering to safety protocols and conducting regular equipment inspections.
  • Kept accurate records of incoming and outgoing shipments.

Education

GED -

West High
179 Powell Ave.
08-1984

Skills

  • Power tool operation
  • Hand tool proficiency
  • Countertop installation
  • Layout design
  • Template creation
  • Attention to detail

Timeline

Countertop Fabricator, Install

Murry Display Fixtures
10.2020 - 03.2023

Forklift Driverwest Mail

SURGE Saffing
03.2013 - 10.2020

GED -

West High
Lary Hall