Summary
Overview
Work History
Skills
References
Timeline
Generic

Leland Coberley

Del-city,Oklahoma

Summary

Owner/Operator of a respected company that specialized in residential/commercial foundations, retaining walls and concrete rooms with 2o+ years of experience. While I am adept at leadership and giving directions with a fantastic eye for detail, I am looking for an opportunity to be part of a structured team where I can utilize my skills and collaborate with like minded people.

Overview

31
31
years of professional experience

Work History

Owner/Operator

Coberley Construction
Del-city, Oklahoma
04.2002 - Current
  • Established long-term relationships with customers by promoting great service and engagement skills and quickly resolving issues.
  • Ensured compliance with all local laws, regulations, policies, and procedures related to the operation of the business.
  • Maintained relationships with vendors and suppliers in order to secure favorable terms on materials and services.
  • Collaborated with architects, engineers, surveyors, inspectors and other professionals involved in construction processes.
  • Coordinated with other trades on-site for efficient scheduling.
  • Managed project operations, budget and timeline and collaborated with stakeholders to review status.
  • Prepared bids on upcoming projects based on estimated costs for labor, materials and equipment usage.
  • Developed and implemented construction plans for projects, ensuring compliance with all applicable codes and regulations.
  • Recruited and hired workers, in addition to training, supervising and monitoring daily performance.
  • Enforced safety rules at all times to reduce workplace hazards.
  • Organized the storage of supplies, tools and equipment used in the course of construction activities.
  • Reported to Builders and Superintendents updates and estimated completion dates, noting delay issues.
  • Inspected forms, footings, and foundations for accuracy in accordance with plans and specifications.
  • Scheduled inspections, meetings, and pours.
  • Managed scheduling of crews based on weather conditions and availability of materials and equipment.
  • Bore boltholes in wood, masonry or concrete using electric or pneumatic drill.
  • Measure and mark designated areas where new foundations are going to be placed.
  • Operated excavators and loaders to prepare site.

Crew Chief

La Force Construction / Kirkes Construction
Oklahoma City, OK
03.1998 - 03.2002
  • Managed daily operations of team members to ensure efficient and successful completion of tasks.
  • Train new hires on job duties, safety protocols, and company policies.
  • Developed and implemented strategies to enhance team performance, improve processes and boost results.
  • Performed general maintenance on tools and equipment used by the crew.
  • Reviewed blueprints and plans prior to beginning a job to ensure accuracy of measurements and specifications.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Participated in regular meetings with other foremen in order to discuss best practices and process improvements.

Network Cable Installer

O'Rear Scale and Equipment
Oklahoma City, OK
01.1997 - 12.1997
  • Ensured that all safety protocols were followed while working onsite at customer locations.
  • Connected routers, switches, hubs, access points, firewalls and other networking devices.
  • Performed physical cable management including labeling and organizing cables for easy identification.
  • Conducted testing to ensure proper operation of newly installed cabling systems using appropriate test equipment.
  • Prepared for daily work assignments by requisitioning equipment and supplies from warehouse and stocking vehicle.
  • Selected correct tools or methodologies to perform specific cabling tasks.
  • Pulled lines to proper tension for safety and durability of installation work.
  • Laid out cabling plans and ran through buildings to desired locations.

Butcher Assistant

Sam's Club
Arvada, CO
01.1996 - 12.1996
  • Created ground meat by measuring ingredients and running through grinder equipment.
  • Completed basic meat cutting.
  • Received orders from customers and sliced, weighed and wrapped meats to customer specifications.
  • Organized shelves with products in an orderly fashion ensuring proper rotation was followed at all times.
  • Counted and documented inventory.
  • Adhered to USDA guidelines when labeling packaged meats ready for sale.
  • Maintained a safe working environment by adhering to all safety protocols established by the company.
  • Complied with federal, state and local sanitation regulations and department procedures.

Tile Setter

Conestone Tile
Jones, OK
01.1995 - 12.1995
  • Used power tools and machinery properly to avoid job site accidents.
  • Measured, cut, and installed ceramic tile, marble, and stone using hand tools and power cutting tools.
  • Repaired damaged tiles by replacing them with new ones or patching them up with matching pieces.
  • Installed backer boards on floors and walls to provide a base for the tiling process.
  • Applied waterproofing membranes to showers, tubs, sinks. to prevent water seepage into underlying structures.
  • Mixed adhesive according to manufacturer's instructions for wall and floor tiles installation.
  • Attended training sessions related to tile setting techniques.
  • Applied sealants and grout finishes to protect tile from water damage.
  • Created straight, even and precise patterns using straightedges, levels and squares.
  • Installed decorative designs on floors and walls with mosaic tiles.

Automotive Body Technician

Continental Bodshop
Oklahoma City, OK
01.1994 - 12.1994
  • Communicated effectively with co-workers regarding progress on projects.
  • Measured, cut and installed sheet metal for patching purposes using hand tools such as hammers and dollies.
  • Repaired and replaced body panels, fenders, bumpers, grills, door handles, window regulators, carpeting, headliners, dashboards, consoles and and other components.
  • Applied primers and sealants to protect repaired surfaces from rusting or corrosion.
  • Prepared vehicles for painting by sanding primed surfaces as well as removing old paint with chemical removers or abrasive materials.
  • Mixed paints according to manufacturer specifications.
  • Utilized frame machines to restore bent frames back to their original shape.
  • Welded broken parts and filled in dents to create smooth vehicle bodies.
  • Covered bumpers, windows and trim with masking tape to prevent overspray or damage to adjacent areas.
  • Used metal-cutting guns, air grinders and wrenches to remove damaged vehicle sections.

Concrete Laborer

Kirkes Construction
Midwest City, OK
05.1993 - 12.1993
  • Use shovels, hoes, rakes, and other tools to spread or level concrete.
  • Loaded and unloaded necessary tools, materials, and machines from trucks and trailers.
  • Carry heavy materials such as blocks, lumber, mortar mixers, and wheelbarrows across job sites safely.
  • Assist in demolishing existing structures with jackhammers and other tools as needed.
  • Install reinforcement rods in order to add strength to the structure.
  • Dismantled forms using basic and advanced tools.

Skills

  • General Maintenance and Preventative Maintenance
  • Schematics, Blueprints, and Diagrams - interpretation and implementation
  • Troubleshooting Diagnostics
  • Minor Mig Welding (Steel/Stainless)
  • Equipment Maintenance and Repair
  • Ability to Operate Tools and Machinery
  • Repair of Variety of Mechanical Systems
  • Paint and Body
  • Work Planning and Prioritization
  • Problem-Solving Aptitude
  • Measuring and Calculating
  • Fabrication of Fuel Systems, Charge Pipes, Exhaust, Engine Swaps, Brackets, Mounts and other components
  • Knowledge of Various Automotive Systems

References

References available upon request.

Timeline

Owner/Operator

Coberley Construction
04.2002 - Current

Crew Chief

La Force Construction / Kirkes Construction
03.1998 - 03.2002

Network Cable Installer

O'Rear Scale and Equipment
01.1997 - 12.1997

Butcher Assistant

Sam's Club
01.1996 - 12.1996

Tile Setter

Conestone Tile
01.1995 - 12.1995

Automotive Body Technician

Continental Bodshop
01.1994 - 12.1994

Concrete Laborer

Kirkes Construction
05.1993 - 12.1993
Leland Coberley