Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
References
Timeline
Generic

David Hatter

Suffolk,VA

Summary

Talented professional considered knowledgeable leader and dedicated problem solver. Bring over 22 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs and improvements. Organized and dependable by managing multiple projects with a positive attitude. Willingness to take on added responsibilities to meet team goals. Excels through mentoring, training and empowering team to excel in performance.

Overview

25
25
years of professional experience
1
1
Certification

Work History

Project Manager

ATS
07.2023 - Current
  • Building New Virginia Class submarine and New Ford Class carriers for US Navy Ships
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Coordinated cross-functional teams and resolved conflicts, maintaining positive work environment throughout project lifecycle.

Project Manager

General Dynamics
11.2022 - 07.2023
  • As the project manager I streamline the entire project life cycle to ensure completion on time with in a agree budget that’s 50 million dollars to the USS Bainbridge (DDG-96). Interfaced a firm fix price budget to ensure best value for material and subcontract services for both the project and the company, as well to our government. My background in auxiliaries and propulsion plant onboard the ship engineering systems. I managed all major repairs and install on all items in the engineering scope of work, budget, schedule, cost estimates, quality, safety, contract administration through all the project phase and in accordance with company polices, standards and project objectives.
  • Implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Drafted project reports to identify successful outcomes, insights and future recommendations.

Deck Supervisor

Huntington Ingalls
02.2022 - 11.2022

As the Deck supervisor, my responsible for ensuring technical adequacy of a visual work instruction to support manufacturing and installation in a model-based environment including validation of welds, notes, and dimensions for COLUMBIA class submarines. A 2.5 millions C5ISR, upgrades and installs with structural engineering specifications involving metals, non-metallic or composite structural materials from product design. Analyzes damage cables for removable and install cable for for system upgrade for the mid life cycle on the USS Jefferson City SSN-759 and USS Asheville SSN-758.

  • Successfully managed budgets and allocated resources to maximize productivity and profitability.
  • Used industry expertise, customer service skills and analytical nature to resolve customer concerns and promote loyalty.
  • Managed senior-level personnel working to me dead lines to me milestone to ensure deployment and schedules were met.

Project Manager

Thermcor
08.2020 - 01.2022
  • · Portfolio value managed~ $3 million annually. Collaborated with various on-site contractors, vendors, and clients to ensure completion of insulation was installed on Navy ships throughout the Hampton Roads. Established and monitored project budget commitments, including purchasing of supplies and equipment. Designed and implemented project management tools to track the cost, scope, and time of projects. Reduced project start-up budgeting time from a day on having materials on the job site every morning to finish the ahead of schedule by 10 days. With a keen eye for detail and a disciplined approach to execution, excels at driving projects through based on milestones and top-notch communication.
  • Enhanced overall project success by conducting thorough post-project evaluations and incorporating lessons learned into future efforts.
  • While learning project management achieving my PMP certification at the same time.

Quality Assurance Manager

Thermcor
08.2020 - 01.2022

As QA Manager I was responsible for performing visual and dimensional inspections. Creating, modifying, and maintaining Quality Assurance documents. Analyzes documentation such as drawings, military specification, and standards with NAVSEA standard items. Generate reports of conditions found during inspection activities, notify production, Superintendents and Quality Assurance/Quality Control management of significant problems. Performs pre-inspections of completed work, attends, witness and verifies tests and inspections. Working with NAVSEA, QA workbook and OSHA Standards (29 CFR 1910 (Occupational Safety and Health Standards) & 1915 (Personal Protective Equipment for Shipyard Employment).

Engineering Warrant Officer

US Navy
07.1999 - 07.2020

As an US Naval engineering officer for the navy, my responsibilities of the position involve systems of major significance, extensive cost, complexity, and strategic importance. A subject matter expert Steam and Diesel Propulsion, Electrical power generation, Refrigeration systems, Electro-hydraulic systems, and Distillation / Reverse- Osmosis water production systems. Well verse in these areas, responsible for planning, reading instruction, blueprint reading, coordinating, and supporting complex unique research and development programs and instruction to complete ships missions. Overseeing the accomplishment in troubleshooting and performing preventative and corrective maintenance on shipboard equipment such as the Boiler to Steering units etc. Shown vast knowledge in utilization of hand tools such as micrometer, calipers, torque wrenches and boring drills and measuring instruments while performing Boiler maintenance or auxiliary equipment overhauls. Dynamic leader with excellent interpersonal skills in high stressed environments requiring attention to detail. Vast multicultural experience meeting deadlines and adapts to constant changes.

Education

Associate Degree - Engineering Technology

Thomas Edison State University
Trenton, NJ
01.2012

Skills

  • Project Management
  • Process Improvement
  • Reading Drawing/Blueprint
  • Microsoft Project
  • Adobe Acrobat
  • Microsoft Dynamics
  • Processes and procedures
  • Conflict Resolution
  • Project Planning
  • Quality Assurance
  • Budgeting and forecasting
  • ERP Software

Certification

  • PMP Certification, PMI, 03/01/22
  • Lean Sig Sigma- Green and Yellow belt
  • Afloat Environmental Protection Coordinator
  • Air Condition and Refrigeration System Tech, Ship refers.
  • Air Compressor and Compress Air Component Maintenance
  • Ship Cargo Weapon Elevators operator and maintain PMS.
  • Hydraulics Repair Technician Aircraft Elevator Operator
  • Anchor/Steering operator and maintain PMS.
  • Auxiliary System Technician Gallery equipment’s, ship package conveyors, pulpier, and plastic melting unit
  • Small Boat repair (7m RHIB)

Accomplishments

  • Project Management, Supervised project production efforts to ensure projects were completed to company standards, on time and with budget constraints.
  • Project Coordination, Provided writing QA packages for repairs to make sure installation, adjustment, testing, maintenance, modification, and repair of shipboard propulsion, steering, and associated equipment, and instrument repair, adjustment, and calibration are completed with no rework.
  • Quality Control, Saved 20% on supply cost by working closely with suppliers to ensure components met department quality standards.
  • Testing, Evaluation and Analysis, Tested equipment to ensure compliance. Analyzed data and provided recommendation which resulted in adoption of new cost-saving equipment.
  • Strategic Management, Supervised and directed over 25 Sailors in the replacement and rebuilding over 50 HP valves and HP air compressor which improves HP system on the ship which translated saving the Navy $650K.

References

  • Joe Grant, Project Manager, 5701 Cleveland St. Suite 400, Virginia Beach, VA, 23462, (757) 334-1839
  • Larry White, Safety lead, 5701 5701 Cleveland St. Suite 400, Virginia Beach, VA, 23462, (757) 768-5821
  • Shawn Thibeault, Team lead, 5701 Cleveland St. Suite 400, Virginia Beach, VA, 23462, (757) 381-3577
  • Diamond Kelly, Team lead 1325 Cavalier Blvd. Chesapeake VA 23323 (757) 719-4829


Timeline

Project Manager

ATS
07.2023 - Current

Project Manager

General Dynamics
11.2022 - 07.2023

Deck Supervisor

Huntington Ingalls
02.2022 - 11.2022

Project Manager

Thermcor
08.2020 - 01.2022

Quality Assurance Manager

Thermcor
08.2020 - 01.2022

Engineering Warrant Officer

US Navy
07.1999 - 07.2020

Associate Degree - Engineering Technology

Thomas Edison State University
David Hatter