Highly accomplished Project Manager with over 12 years of experience delivering fireproofing projects in private and public construction sectors. PMP-certified with a proven track record of achieving high-quality results, ensuring safety standards, and driving innovative solutions. Skilled in client coordination, risk management, and resource optimization to yield significant cost savings. Rooted in fireproofing expertise, with the versatility to successfully manage projects across diverse domains, adapting skills to drive results in various industries. Seeking a challenging role in Project management to leverage expertise and drive project success in a results-driven organization, now based in Connecticut as a Permanent Resident.
In my role as Project Manager at FSIME Construction LLC, I directed fireproofing projects from initial planning through to final delivery. I ensured all aspects met stringent quality and safety requirements. By fostering a collaborative environment with clients, architects, and contractors, I was able to design and implement creative fireproofing solutions, leading to successful project completions.
Key accomplishments:
Regular site inspections and rigorous quality assurance checks ensured adherence to industry standards. My management of planning, resource allocation, and scheduling allowed me to lead a diverse team of internal staff and subcontractors to achieve project goals efficiently.
As a Project Engineer at Mega Gas & Oil Field Equipment & Services LLC, I managed fireproofing projects across multiple sites, ensuring high-quality delivery within set timelines. My responsibilities included resolving on-site technical issues and coordinating with clients and field teams to enhance operations, safety, and project quality.
Key accomplishments:
At Monel Engineering, I supported the planning, execution, and monitoring of projects involving gas pipelines, manifold systems for gases such as oxygen, nitrogen, hydrogen, and argon, as well as structural steel services. Overseeing small-scale projects with budgets ranging from $50k to $150k, I led teams of 2-4 engineers and technicians.
Key responsibilities included coordinating design reviews, conducting site inspections, and maintaining detailed documentation to ensure alignment with industry standards and client specifications.
Key accomplishments:
Enhanced resource efficiency by 20% through the implementation of streamlined processes and best practices, boosting operational productivity.
• Reduced project delivery times by 25% with improved execution strategies and prompt issue resolution.
• Maintained strict adherence to technical specifications and regulatory standards, reinforcing the company's commitment to operational excellence.
• Minimized project delays by promptly resolving issues and sustaining project momentum.
• Led cross-functional teams to drive continuous improvements and achieve project milestones.
• Managed financial oversight and resource allocation, ensuring compliance with technical specifications and regulatory standards.
• Delivered projects within 2 to 6 months, consistently meeting budget and timeline requirements.
• Reduced delivery times by 10% through process optimization and proactive issue resolution.
• Enhanced client satisfaction and secured repeat business by 15% through effective communication and responsive service.
• Achieved 8% reduction in project costs by optimizing resource management.
• Successfully integrated structural steel with gas pipeline systems, improving project stability and functionality.
G42 Life Science Park, Kezad, Abu Dhabi
Directed the intumescent fireproofing application for a multi-story warehouse within the Life Science park. Ensured that fireproofing measures were effectively implemented across all levels of the warehouse to meet stringent safety and compliance standards. Coordinated with construction and design teams to ensure seamless integration with the warehouse's structural and operational requirements.
Key Achievements:
• Completed the fireproofing application on time and within budget while adhering to high safety and compliance standards.
• Significantly enhanced fire protection across the multi-story warehouse, ensuring safety for sensitive life science materials and equipment.
• Achieved positive feedback from stakeholders for effective project management and successful integration with the warehouse infrastructure.
Technologies Used:
Intumescent coatings
Kezad Logistics Park - 6 and 7, Kezad, Abu Dhabi
Oversaw the application of fireproofing materials for a massive industrial warehouse. Implemented cementitious fireproofing to enhance structural resilience.
Key Achievements:
• Delivered under budget.
• Enhanced safety standards for the warehouse.
• Strengthened partnerships with key stakeholders.
Technologies Used:
Cementitious fireproofing systems
Khazna Data Center, Dubai Design District, Dubai
Directed the fireproofing of a critical data center using specialized intumescent system. Ensured rigorous adherence to industry standards and project goals.
Key Achievements:
• Completed ahead of schedule with zero downtime.
• Improved data center fire safety and operational reliability.
• Secured additional projects from the client.
Technologies Used:
Intumescent coating
Pure Data Center, Yas Island, Abu Dhabi
Led the fireproofing application project for a state-of-the-art data center, implementing intumescent fireproofing system. Ensured that all project phases adhered to stringent safety and operational standards, critical for maintaining data center integrity and performance.
Key Achievements:
• Completed the project on schedule with zero downtime.
• Enhanced fire safety measures, ensuring maximum protection for critical infrastructure.
• Met all regulatory requirements and received positive client feedback for execution quality.
Technologies Used:
Intumescent coating
Dubai International Airport Cargo Terminal
Led the epoxy intumescent fireproofing application for the steel structures of Dubai international airport cargo terminal. Oversaw the fireproofing process performed at the client’s steel company, ensuring that the fire protection measures were effectively integrated with the terminal’s structural components and operational requirements. Focused on aligning the fireproofing systems with the terminal's demanding needs.
Key Achievements:
• Completed the fireproofing application on time and within budget, achieving superior fire safety and operational efficiency for the cargo terminal.
• Applied epoxy intumescent coatings to enhance fire protection while preserving the functionality and integrity of the steel structures.
• Received commendations from the client for exceptional project management and successful coordination of fireproofing activities at the client's facility.
Technologies Used:
Epoxy intumescent coatings
Midfield Terminal Building Project - Abu Dhabi International Airport, Abu Dhabi
Managed the fireproofing of a new airport terminal, applying cementitious fireproofing systems to Pier 2 and Pier 3, and intumescent coatings with an AESS (Architecturally Exposed Structural Steel) finish to link bridges, and standard intumescent coatings to gate houses. Oversaw the entire project lifecycle to ensure compliance with stringent safety standards and seamless integration with the terminal's infrastructure.
Key Achievements:
• Completed the project within budget while maintaining high safety and compliance standards.
• Enhanced fire safety and aesthetic appeal of critical areas, improving the terminal's overall operational efficiency.
• Fostered strong client relationships, resulting in additional opportunities and continued collaboration.
Technologies Used:
• Cementitious fireproofing systems (Pier 2 and Pier 3)
• Intumescent coatings with AESS finish (Link bridges)
• Intumescent coatings (Gate houses)
Opportunity Pavilion - Expo 2020, Dubai
Directed the application of cementitious fireproofing materials for the Opportunity Pavilion at Expo 2020, Dubai. Managed all aspects of the project to ensure the pavilion’s structural components met the highest fire safety standards and seamlessly integrated with the innovative architectural design.
Key Achievements:
• Successfully completed the fireproofing within budget and on schedule.
• Ensured 100% compliance with international safety standards and regulations.
• Contributed to the pavilion’s standout features by enhancing both fire safety and structural integrity, receiving positive feedback from stakeholders and visitors.
Technologies Used:
Cementitious fireproofing systems
Parsons Headquarters, Abu Dhabi
Managed the intumescent fireproofing application for the Parsons headquarters at Abu Dhabi. Oversaw the application of fireproofing materials to columns and beams, which were pre-treated in a dedicated yard before installation at the construction site. Ensured the project met rigorous safety standards and seamlessly integrated with the building's advanced design.
Key Achievements:
• Completed the fireproofing process within schedule and budget, adhering to high safety and quality standards.
• Successfully enhanced fire protection for critical structural components, improving the building’s overall safety and operational efficiency.
• Received positive feedback from the client for effective project management and the successful integration of fireproofing systems, executed off-site to optimize on-site operations.
Technologies Used:
Intumescent coatings
Rochester Institute of Technology, Dubai
Managed the fireproofing project for the Innovation Lab and Multi-Purpose Hall at the Institute of Technology, utilizing both intumescent and cementitious fireproofing systems. Ensured comprehensive coverage across both specialized areas to meet stringent fire safety and regulatory standards. Coordinated with design and construction teams to ensure seamless integration and adherence to project timelines.
Key Achievements:
• Successfully completed the project on schedule and within budget, while maintaining high safety and compliance standards.
• Enhanced fire protection for both the high-tech Innovation Lab and the versatile multi-Purpose Hall.
• Received positive feedback from the institute for effective project execution and thorough integration with the facility’s advanced infrastructure.
Technologies Used:
• Intumescent coatings (Innovation Lab)
• Cementitious fireproofing systems (multi-Purpose Hall)
University of Birmingham, Academic City, Dubai
Directed the intumescent fireproofing application for key structural elements in the main building of University of Birmingham. This included atrium columns, bridge walkways, cellular columns, and staircases. Ensured that all applications met stringent safety and compliance standards, integrating seamlessly with the university's architectural design.
Key Achievements:
• Completed the fireproofing project on schedule and within budget, maintaining high standards of safety and quality.
• Significantly improved fire protection across critical structural components, enhancing overall safety for students and staff.
• Received commendations for effective management and coordination, leading to successful project integration with the building's design.
Technologies Used:
Intumescent coatings (Atrium columns, bridge walkways, cellular columns, staircases)
Emirati School, Al Rahmaniya, Sharjah
Oversaw the fireproofing project for a new educational facility, applying intumescent coatings to critical areas. Collaborated effectively with construction teams to ensure timely project completion and adherence to rigorous safety standards.
Key Achievements:
• Delivered the project on schedule while achieving full compliance with safety regulations.
• Enhanced the facility’s fire safety performance, meeting all required standards.
• Earned commendations from the educational institution for high-quality execution and reliability.
Technologies Used:
Intumescent coatings
St. Mary's High School, Ras Al- Khaimah
Managed the fireproofing of a new indoor sports facility for St. Mary's High School, Ras Al- Khaimah, utilizing both intumescent fireproofing systems. Coordinated closely with construction teams to ensure timely completion and adherence to safety standards.
Key Achievements:
• Achieved 100% compliance with safety regulations.
• Completed the project on schedule.
• Received positive feedback from the school for quality and efficiency.
Technologies Used:
Intumescent coatings
Al Forsan International Sports Resort and Development, Khalifa City, Abu Dhabi
Managed the fireproofing of a major sports arena, utilizing cementitious fireproofing for concealed structural areas and intumescent coatings for exposed regions. Coordinated with multiple contractors to ensure seamless integration and effective application across all areas of the facility.
Key Achievements:
• Successfully completed the project on schedule.
• Significantly enhanced structural fire safety, accommodating large crowds.
• Received recognition for outstanding project management and coordination.
Technologies Used:
• Cementitious fireproofing systems (Concealed areas)
• Intumescent coatings (Exposed areas)
Yas Mall, Yas Island, Abu Dhabi
Oversaw fireproofing for a large shopping mall, applying intumescent fireproofing material to all structural elements. Managed scheduling and resource allocation efficiently.
Key Achievements:
• Achieved on-time delivery with no safety incidents.
• Elevated fire safety compliance for the mall.
• Enhanced client satisfaction leading to repeat business.
Technologies Used:
Intumescent coatings
Leader Sports Society Mall, Mirdiff, Dubai
Led the fireproofing project for the ice rink area in a large sports mall, focusing on the application of intumescent fireproofing to the roof trusses. Managed all aspects of the project to ensure high-quality application and adherence to safety standards while coordinating with various stakeholders.
Key Achievements:
• Completed the intumescent application on schedule and within budget.
• Enhanced fire protection for the roof trusses, ensuring safety in a high-traffic area.
• Received commendations for effective project management and successful integration with existing structures.
Technologies Used:
Intumescent coatings (Roof trusses in ice rink area)
Union Cooperative Society, Al Warqa 3, Dubai
Managed the intumescent fireproofing application for the steel structures within a shopping mall. Directed the project to ensure that all steel components were effectively protected against fire, meeting rigorous safety standards and integrating seamlessly with the mall’s design and construction.
Key Achievements:
• Successfully completed the fireproofing on schedule and within budget.
• Enhanced fire safety for the steel structures, ensuring compliance with safety regulations and contributing to the mall's overall safety.
• Received positive feedback from stakeholders for efficient project execution and high-quality results.
Technologies Used:
Intumescent coatings
Roxy Cinemas, Dubai Hills
Directed the intumescent fireproofing application for podiums and stadium seating areas in Roxy Cinemas. Managed the project to ensure that all seating areas and podiums met rigorous fire safety standards and were effectively protected. Coordinated with construction and design teams to integrate fireproofing solutions seamlessly into the theater’s layout and infrastructure.
Key Achievements:
• Completed the project on time and within budget, while adhering to stringent fire safety regulations.
• Enhanced fire protection for key areas, ensuring safety for large audiences and compliance with building codes.
• Received commendations for effective project management and successful integration with the theater’s design and operational requirements.
Technologies Used:
Intumescent coatings (Podiums and stadium seating areas)
Pets Qasr - Pets Hotel and Clinic, Al Reem Island, Abu Dhabi
Oversaw the intumescent fireproofing application for a specialized pet hotel and clinic. Managed the project to ensure all critical areas, met rigorous fire safety standards. Coordinated closely with construction and design teams to achieve seamless integration and adherence to safety regulations.
Key Achievements:
• Completed the project on schedule and within budget while adhering to high safety standards.
• Enhanced fire safety and protection throughout the facility, ensuring a safe environment for both pets and staff.
• Received commendations for effective project management and successful execution from stakeholders.
Technologies Used:
Intumescent coatings
Dubai Harbor - Yacht Club, Dubai Marina, Dubai
Oversaw the intumescent fireproofing application for the steel structures at Dubai Harbor Yacht Club, meticulously ensuring that fire protection measures enhanced safety while complementing the club's luxurious and sophisticated design. Managed the integration of fireproofing systems with a focus on preserving the aesthetic appeal of the steelwork, crucial to maintaining the high-end environment of the club.
Key Achievements:
• Successfully completed the project on schedule and within budget, resulting in a highly profitable outcome.
• Achieved an optimal balance between robust fire protection and the yacht club’s sophisticated appearance, ensuring both safety and visual elegance.
• Received commendations from stakeholders for exceptional project management, effective coordination, and successful preservation of the upscale design.
Technologies Used:
Intumescent coatings
Yas Acres Golf and Country Club, Yas Island, Abu Dhabi
Oversaw the intumescent fireproofing application for key structures at a prestigious Golf Course and Country Club. Managed the fireproofing of various components, including clubhouses, maintenance facilities, and other essential structures, ensuring compliance with rigorous safety standards and enhancing the overall fire protection across the property.
Key Achievements:
• Completed the project within budget and on schedule, upholding high standards of safety and quality.
• Significantly improved fire safety across the club's critical structures, contributing to a safer environment for members and staff.
• Received positive feedback from the client for exceptional project management and successful integration of fireproofing systems into the club’s design.
Technologies Used:
Intumescent coatings
Bahwan Tower, Business Bay, Dubai
Led the intumescent fireproofing application for the roof crown structure of Bahwan Tower. Oversaw the entire process from planning through to completion, ensuring high standards of fire safety and compliance.
Key Achievements:
• Successfully completed the application on schedule.
• Met all safety and regulatory requirements, enhancing structural fire resistance.
• Delivered within budget, with no safety incidents.
Technologies Used:
Intumescent coatings
Deira Waterfront Enrichment Project at Plot 4, Deira, Dubai
Managed a comprehensive fireproofing project involving the application of cementitious fireproofing at podium levels and intumescent fireproofing on roof structures for the hotel and office building complex - Deira Waterfront Enrichment Project. Directed the execution and coordination across different building components to ensure seamless integration and compliance with fire safety standards.
Key Achievements:
• Completed both podium and roof fireproofing applications on schedule.
• Enhanced structural fire resistance for both podium and roof areas.
• Achieved regulatory compliance and high-quality standards within budget.
• Fostered positive client relationships, leading to future project opportunities.
Technologies Used:
• Cementitious fireproofing systems (Podiums)
• Intumescent coatings (Roof Structures)
KOA Canvas, Al Barari, Dubai
Managed the intumescent and cementitious fireproofing application for both the internal and external steel structures of a multi-story residential building, featuring office spaces on the ground floor. Oversaw the comprehensive fireproofing strategy, ensuring effective protection of structural elements while maintaining the building's functionality and aesthetic appeal.
Key Achievements:
• Successfully completed the project on schedule and within budget, enhancing both the fire safety and overall performance of the building.
• Delivered robust fire protection solutions for internal and external steel structures, balancing safety with the building’s design requirements.
• Received positive feedback for effective project management and seamless integration of fireproofing systems into the residential and commercial components.
Technologies Used:
• Intumescent coatings
• Cementitious fireproofing systems
Labor Accommodation Facility, Dubai Investment Park, Dubai
Managed the application of cementitious fireproofing for a labor accommodation facility, focusing on enhancing fire safety for the residential and common areas. Oversaw the entire project lifecycle, ensuring that all fireproofing measures were implemented effectively to meet safety standards and integrate seamlessly with the facility’s infrastructure.
Key Achievements:
• Completed the fireproofing application on time and within budget while adhering to stringent safety and regulatory requirements.
• Improved fire safety and protection throughout the accommodation, contributing to a safer living environment for residents.
• Coordinated efficiently with construction teams, leading to successful integration of fireproofing systems with minimal disruption.
Technologies Used:
Cementitious fireproofing systems
Marina Vista at Emaar Beach Front , The Palm Jumeirah, Dubai
Oversaw the fireproofing of the roof crown structure for the residential high-rise building - Marina Vista, employing intumescent fireproofing system. Ensured meticulous adherence to quality and safety standards throughout the project.
Key Achievements:
• Completed the project 15% under budget.
• Significantly improved fire safety and protection for the roof crown structure.
• Facilitated a seamless and successful project handover.
Technologies Used:
Intumescent coatings
Paramount towers, Business Bay, Dubai
Managed the application of high-density cementitious fireproofing material to the roof crown structure of a high-rise hotel and residence. Ensured that the fireproofing application met stringent safety and performance standards and coordinated with construction teams to align with the project's architectural and structural requirements.
Key Achievements:
• Delivered the project on time and within budget while maintaining exceptional safety and quality standards.
• Enhanced fire protection for the roof crown structure, contributing to the building's overall safety and durability.
• Facilitated successful project integration with minimal disruption to ongoing construction activities.
Technologies Used:
High-density cementitious fireproofing systems
Seven Palm Hotel and Apartments, Palm Jumeirah, Dubai
Oversaw the application of intumescent fireproofing for the link bridge structure connecting the high-rise hotel and apartment building. Managed the project to ensure the fireproofing was applied effectively, meeting all safety regulations and seamlessly integrating with the building’s architectural design.
Key Achievements:
• Completed the fireproofing application on schedule and within budget.
• Enhanced the fire safety of the link bridge, ensuring robust protection for the high-rise structure.
• Achieved high client satisfaction through meticulous project management and adherence to quality standards.
Technologies Used:
Intumescent coatings
Seventh Heaven, Al Barari, Dubai
Directed the cementitious fireproofing application for the internal living spaces, apartments, and sky villas at Seventh Heaven, Al Barari. Managed the project to ensure comprehensive fire protection for high-end residential units, focusing on both aesthetic integration and compliance with stringent fire safety standards.
Key Achievements:
• Successfully completed the fireproofing application on schedule and within budget, adhering to top industry standards.
• Enhanced fire safety and structural integrity across all internal living spaces, apartments, and sky villas.
• Received commendations for effective project management and seamless integration of fireproofing systems with the luxurious design of Seventh Heaven.
Technologies Used:
Cementitious fireproofing systems
Vida Hotel, Dubai Creek Harbor
Led the intumescent coating application for the roof crown of Vida Hotel at Dubai Creek Harbor. Managed the project to ensure effective fireproofing of the roof structure, which involved meticulous planning and coordination with construction teams to integrate the fireproofing system seamlessly with the hotel's architectural design.
Key Achievements:
• Completed the project on time and within budget while maintaining high standards of safety and quality.
• Enhanced fire protection for the roof crown, significantly improving the hotel’s overall fire safety.
• Received commendations from stakeholders for effective project execution and successful coordination with the hotel's construction team.
Technologies Used:
Intumescent coatings
Dubai Chambers, Al-Buteen, Dubai
Led the intumescent fireproofing initiative for the roof canopy and structural columns of Dubai Chambers, encompassing both the parking lot and main building. Ensured that all fireproofing measures were meticulously applied to enhance safety and compliance with rigorous government standards, while seamlessly integrating with the facility's architectural design.
Key Achievements:
• Delivered the project efficiently, on time and within budget, while upholding the highest safety and quality standards.
• Elevated the fire safety of crucial structural elements, including the roof canopy and columns, significantly improving the facility's overall fire resilience.
• Earned commendations from government officials for effective management and successful alignment with the building's complex infrastructure.
Technologies Used:
Intumescent coatings
Dubai Prosecution Building, Umm Hurair 2, Dubai
Managed the cementitious fireproofing application for the steel slab deck and canopy of a high-profile prosecution building. Ensured effective fire protection for critical areas, including the building’s floors and canopy, while maintaining compliance with rigorous safety standards and integrating seamlessly with the building's structural and architectural requirements.
Key Achievements:
• Completed the project on time and within budget, adhering to stringent safety and quality standards.
• Successfully enhanced fire safety and protection across the floor and canopy, contributing to the building's overall safety and resilience.
• Received positive feedback from stakeholders for efficient project management and high-quality execution.
Technologies Used:
Cementitious fireproofing systems
Microsoft Office
Microsoft Project