Experienced construction manager with a proven track record of 30 years in the infrastructure and heavy civil industry. Adept at overseeing all aspects of operations, from negotiation to cost management, while effectively supervising crews. Possessing strong leadership skills and a deep understanding of project management principles, consistently delivering successful outcomes within budget and on schedule.

Overview

32
32
years of professional experience
1
1
Certification

Work History

Construction Manager

BETA Engineering
05.2024 - Current
  • Currently managing the Eldorado Lugo Mojave Project (ELM) for BETA/Siemens and our customer is Southern California Edison (SCE)
  • The project consists of upgrading the series capacitor racks at Lugo Substation which is a 500 KV yard
  • I am currently overseeing the day-to-day operations for SC-1 Mojave and SC-4 El Dorado Capacitor Yards
  • We are currently removing and replacing the old equipment and IPS Bus for A, B & C phases platforms 1 & 2 as well as all upgrades to the control and protection system cabinets in the MEER buildings
  • Developed strong relations with SCE, ULM, Rising Edge and Circle Wood Services
  • Collaborated closely with clients to ensure project objectives were met, maintaining transparent communication throughout the process.
  • Identified and resolved construction issues promptly to prevent delays.
  • Established a reputation for excellent crisis management skills when unexpected issues arose during construction, quickly developing solutions to minimize project delays.
  • Implemented safety protocols for reduced workplace injuries, conducting regular site inspections and safety meetings.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.

Owner- Union Reinforcing Steel Contractor

Shea Reinforcing Steel, Inc
02.2022 - 04.2024
  • Furnished and installed reinforcing steel on various State Agency projects
  • To name a few; The Santa Claus Lane Bike Path for Caltrans, Carpinteria Ca
  • The Big Dalton Dam Road Improvements and Helipad for LADWP Glendora, Ca
  • San Dimas Dam helipad, LADWP
  • Hwy 101 Ventura to Santa Barbara barrier rail project for Caltrans
  • Los Olivos Pedestrian Bridge HWY 154 for Caltrans, Santa Barbara, Ca
  • Hwy 39 bridge retrofit, Caltrans, Azusa, Ca
  • Conejo Canyon Pedestrian Bridge, City of Thousand Oaks, Thousand Oaks, Ca
  • Gaviota Pass Emergency Restoration of Hwy 101 Secant pile wall and barrier rail, Caltrans, Gaviota, Ca
  • Moss Street Sea wall and pedestrian access restoration project, City of San Juan Capistrano, San Juan Capistrano, Ca
  • Bluebird Canyon Outfall Structure, City of San Juan Capistrano, San Juan Capistrano, Ca
  • We also provided service to numerous clients in the private sector
  • Managed day-to-day business operations.
  • Developed and maintained strong relationships with clients, resulting in repeat business and referrals.
  • Oversaw daily operations, ensuring all tasks were completed accurately and efficiently by team members.
  • Managed financial aspects of the business, including budgeting, financial reporting, and tax preparation.
  • Interacted well with customers to build connections and nurture relationships.
  • Increased customer satisfaction by implementing efficient business processes and providing exceptional service.
  • Established a positive workplace culture that fostered employee engagement, collaboration, and loyalty.

General Foreman - Union Iron Worker

Commercial Metals (CMC)
05.2021 - 02.2022
  • General Foreman for the construction of 12' diameter CIDH piles for the 73-flyover connector bridge.
  • Developed strong relations with OHL and Caltrans.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Worked alongside team to accomplish work goals according to schedule.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.

General Foreman - Superintendent Union Ironworker

Commercial Metals (CMC)
10.2020 - 05.2021
  • Constructed the 2.5-mile Automated People Mover through LAX International Airport.
  • Developed strong relations with LAWA as well as Flatiron Construction
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Worked alongside team to accomplish work goals according to schedule.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.

General Foreman - Union Iron Worker

Legacy Reinforcing Steel
01.2020 - 10.2020
  • Enterprise Rental Car parking structure the largest parking structure in the Western United States used to service LAX and the Automated People Mover
  • Developed strong relations with LAWA and PCL Construction
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Worked alongside team to accomplish work goals according to schedule.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.

General Foreman - Union Iron Worker

Commercial Metals (CMC)
04.2014 - 12.2019
  • The New Gerald Desmond Bridge at the port of Long Beach
  • 515 foot tall all concrete suspension bridge
  • Managed crews of 25 or more on multiple areas of the project/segments simultaneously
  • Developed strong interpersonal relationships with The Port of Long Beach, Caltrans, Shimmick, AE Com and Legacy Foundations
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Worked alongside team to accomplish work goals according to schedule.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Completed final walkthroughs at job sites to close out projects.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Improved project efficiency by effectively delegating tasks and managing a team of skilled workers.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.

General Foreman - Union Ironworker

Commercial Metals (CMC)
03.2013 - 04.2014
  • Marriot Hotel Expansion and Event Center at the San Diego Harbor and Waterfront
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Worked alongside team to accomplish work goals according to schedule.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Completed final walkthroughs at job sites to close out projects.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Directed projects according to schedule and quality demands.

Union Iron Worker

Russell Coker Inc.
01.2005 - 03.2013
  • Projects included Otay River Valley Bridge San Diego, The Metro Downtown San Diego, several bridge projects in Carmel Valley, and the Lake Murray Water Treatment Plant
  • Worked fast to complete tasks and meet daily deadlines.
  • Followed instructions and procedures to complete assigned tasks.

Union Iron Worker

J.L. Davidson
01.2002 - 12.2004
  • Petco Park stadium project
  • Worked fast to complete tasks and meet daily deadlines.
  • Followed instructions and procedures to complete assigned tasks.

Iron Worker

Canyon Steel Inc.
02.1995 - 01.2002
  • Swimming pool / steel contractor

Apprentice Oiler / Yard Personnel

Cabrillo Crane and Rigging
01.1993 - 01.1995
  • Worked under guidance of experienced professionals to learn trade best practices and techniques.
  • Enhanced practical skills by assisting experienced professionals in various tasks.

Education

High School Diploma -

Granite Hills High School
El Cajon, CA
06-1991

Skills

  • Project management
  • Construction management
  • Problem-solving
  • Site management
  • Project scheduling
  • Team building and leadership
  • Scope management
  • Safety compliance
  • Subcontractor management
  • Site safety
  • Cost control
  • Decision-making

Certification

  • Occupational Safety and Health Administration (OSHA) 30-hour Construction Training - U.S. Department of Labor.
  • CPR/AED Certification
  • Licensed Contractor with the Contractors State License Board.

Timeline

Construction Manager

BETA Engineering
05.2024 - Current

Owner- Union Reinforcing Steel Contractor

Shea Reinforcing Steel, Inc
02.2022 - 04.2024

General Foreman - Union Iron Worker

Commercial Metals (CMC)
05.2021 - 02.2022

General Foreman - Superintendent Union Ironworker

Commercial Metals (CMC)
10.2020 - 05.2021

General Foreman - Union Iron Worker

Legacy Reinforcing Steel
01.2020 - 10.2020

General Foreman - Union Iron Worker

Commercial Metals (CMC)
04.2014 - 12.2019

General Foreman - Union Ironworker

Commercial Metals (CMC)
03.2013 - 04.2014

Union Iron Worker

Russell Coker Inc.
01.2005 - 03.2013

Union Iron Worker

J.L. Davidson
01.2002 - 12.2004

Iron Worker

Canyon Steel Inc.
02.1995 - 01.2002

Apprentice Oiler / Yard Personnel

Cabrillo Crane and Rigging
01.1993 - 01.1995
  • Occupational Safety and Health Administration (OSHA) 30-hour Construction Training - U.S. Department of Labor.
  • CPR/AED Certification
  • Licensed Contractor with the Contractors State License Board.

High School Diploma -

Granite Hills High School
Matthew Shea