Summary
Overview
Work History
Education
Skills
Certification
Equipment Utilized
Generic

MICHAEL CITRANO

Bosque Farms,USA

Summary

Dynamic and results-oriented professional with over 25 years of experience in manufacturing and installation, consistently delivering exceptional operational efficiencies and safety standards. Proven track record of driving profitability through innovative solutions and strategic process improvements. Expertise in fostering high-performance teams and implementing best practices to enhance productivity and quality. Committed to leveraging a strong background to contribute to organizational success and operational excellence.

Overview

19
19
years of professional experience
1
1
Certification

Work History

FEILD INSTALLATION MANAGER

Raymond West
Cypress, CA
09.2024 - 06.2025
  • Managed equipment installation projects at various customer sites, primarily Amazon facilities throughout the US.
  • Scheduled daily work assignments for 15+ install subcontractor employees.
  • Delegated and prioritized alignment of resources to construction areas as needed.
  • Conducted daily safety toolbox meeting and filed JHA/JSA with Site Safety Officer (SSO) and Raymond West EHS Department.
  • Conducted daily Quality Control (QC) checks and confirmed all mechanical equipment installed per floorplan and specifications.
  • Updated and submitted Red Lines to Engineering Department.
  • Coordinated and supported all construction permits.
  • Coordinated and advised multiple site subcontractors throughout installation of mechanical/electrical equipment.
  • Managed inventory and receipt of all mechanical/electrical equipment.
  • Created and managed daily installation/personnel reports via Procore.
  • Attended weekly General Contractor construction meetings.
  • Maintain systematic reporting and accounting records including job site safety and end-of-project reporting.
  • Conducted system commissioning and training with site maintenance and operation personnel.
  • Managed equipment installation projects at various customer sites, primarily Amazon facilities throughout the US.

MECHANICAL SUPERVISOR/SME (CONTRACT)

TEK systems
Hanover, MD
03.2022 - 11.2022
  • Assigned to Symbotic LLC US Remote Group deployed to multiple construction sites throughout the US.
  • Scheduled daily work assignments for 20+ install subcontractors.
  • Delegated and prioritized alignment of resources to construction areas as needed.
  • Conducted daily safety toolbox meeting and filed JHA/JSA with Site Safety Officer (SSO).
  • Conducted daily Quality Control (QC) checks and confirmed all mechanical equipment installed per floorplan and specifications.
  • Managed inventory and receipt of all mechanical/electrical equipment.
  • Created and managed project tickets on Jira platform.
  • Created and managed daily production reports.
  • Participated in daily construction meetings with senior level management team.
  • Coordinated weekly inventory cycle counts.
  • Coordinated and advised multiple trades throughout mechanical installation.
  • Assigned to Symbotic LLC US Remote Group deployed to multiple construction sites throughout the US.

STATIONS PRODUCTION FOREMAN

Culver Installations
Phoenix, AZ
04.2021 - 01.2022
  • Lead project supervisor assigned to Amazon Robotics Sub Same Day (SSD) programs deployed throughout the US.
  • Managed 50+ employees throughout the day to ensure daily tasks are completed on time.
  • Verified/Quality Control (QC) receipt of project mechanical equipment.
  • Created and managed daily project inventory and project reports.
  • Conducted daily inspections of all workstations produced and installed.
  • Conducted daily Sync with Amazon project managers and engineers.
  • Conducted daily Zoom meetings with Culver senior managers.
  • Coordinated with Temp Agency Reps on daily work assignments of 15–20 temp employees.
  • Lead project supervisor assigned to Amazon Robotics Sub Same Day (SSD) programs deployed throughout the US.

FACILITY OPERATOR

Ergon emulsions
Las Vegas, NV
10.2019 - 04.2020
  • Loaded and unloaded railcars and customer trucks.
  • Produced premium grade Asphalt Cement (AC) and emulsions.
  • Evaluated raw materials and finished products.
  • Managed materials and finished product database.
  • Performed monthly cycle counts and annual physical inventory audit.
  • Assisted maintenance mechanics with daily Preventative Maintenance (PM).
  • Produced premium grade Asphalt Cement (AC) and emulsions.

LEADMAN

TIMET
Henderson, NV
09.2006 - 05.2019
  • Performed a diverse range of responsibilities.
  • This included, but not limited to melt process initiation, press and weld electrode operation, and assigned and prioritized manpower to reduce production downtime and increased efficiency of 25+ operators.
  • Conducted annual employee certifications and performance reviews.
  • Utilized and created SAP ERP system production reports, work orders, and inventory management.
  • Conducted daily department safety meetings.
  • Attended weekly production meeting with senior managers.
  • Performed a diverse range of responsibilities including melt process initiation and press and weld electrode operation.

Education

HIGH SCHOOL DIPLOMA -

Josh Lofton High School
ROCHESTER, NY
06.1997

Skills

  • Customer service
  • Construction
  • Workload prioritization
  • Health and safety
  • Installation planning
  • Field operations
  • Blueprint reading
  • Task delegation
  • Crew management

Certification

  • OSHA 30
  • MEWP
  • Forklift

Equipment Utilized

  • Crown – RC Series Stand-up Forklift
  • TSP Services Very Narrow - Aisle Turret Truck
  • Raymond – Universal Stance Forklift Truck
  • Hyster – H70FT
  • Genie - Telescopic Boom Lift
  • 15 Ton Bridge Crane