Motivated Production Line Worker proficient in quality checks, finishing work and equipment calibration. Ready to tackle new challenges and to contribute to team and company success.
Overview
23
23
years of professional experience
Work History
Production Line Worker
Pratt Industries
06.2023 - Current
Packaged and labeled products using automated equipment.
Collaborated with other production workers to achieve smooth running of production line.
Boxed, labeled, and transported items to support assembly operations.
Followed instructions to make products in line with customer specifications.
Prioritized tasks to meet personal and team production targets.
Followed safety protocols to prevent accidents and injuries to self and colleagues.
Used established assembly instructions to complete jobs quickly, accurately, and with zero errors.
Performed basic maintenance of production equipment to prevent downtime.
Made sure that products were produced on time and are of good quality.
Used problem-solving and issue-resolution skills to promptly and successfully address production problems.
Collaborated with other departments to optimize production workflows.
Construction Worker
Cruz Construction
03.2020 - 02.2023
Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
Loaded, unloaded, and moved material to and from storage and production areas.
Worked independently in fast-paced environment while meeting productivity and quality expectations.
Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
Assisted with successful, time-sensitive renovations of various structures.
Assisted with basic carpentry work such as installing wooden floors and crown molding.
Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
Operated power equipment to move materials and promote job efficiency.
Industrial Painter
Trinity Rail
05.2016 - 02.2020
Painted surfaces using brushes, spray guns, and paint rollers.
Operated power sprayers and hand tools to prepare and paint large areas.
Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
Provided supervisor with daily status report on all job tasks and workers' duties.
Worked holidays and weekends depending on shifting needs of project.
Inspected completed work for adherence to very strict guidelines and highest quality standards.
Calculated amount of paint and other materials needed for each job accurately.
Laborer
Cretex Concrete Products Midwest
01.2001 - 04.2015
Worked alongside team to accomplish work goals according to schedule.
Understood and followed verbal and written instructions to complete work correctly.
Maintained organized and clean work areas at all times on job sites.
Loaded, unloaded, and moved material to and from storage and production areas.
Organized materials, tools, and equipment to supply team members.
Utilized construction tools and machinery to effectively complete job site projects.
Identified and reported hazards on job sites to prevent accidents and injuries.
Mixed and poured concrete for variety of projects.
Operated forklifts and boom lifts to complete various tasks.