Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

Nick Walton

Lisbon,Iowa

Summary

Hard-driving business leader offering skill in strategic business planning and team development. Skillfully recruit and train employees at all levels to meet customer and business demands. Articulate, forward-thinking and resourceful in meeting unique needs.

Overview

22
22
years of professional experience

Work History

Owner/Operator

Walton Construction
06.2008 - Current
  • Managed day-to-day business operations.
  • Consulted with customers to assess needs and propose optimal solutions.
  • Trained and motivated employees to perform daily business functions.
  • Evaluated suppliers to maintain cost controls and improve operations.

Carpenter

Britt Constrcution
01.2006 - 01.2007
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Read and interpreted blueprints to follow specifications of projects.
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Measured, drilled and sawed materials to perform successful home improvements.
  • Measured materials to determine sizes and quantity required for construction project.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Discarded debris and disposed waste to maintain cleanliness and quality standards.
  • Collaborated with other construction workers to coordinate projects and streamline process.
  • Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
  • Developed and implemented new processes and procedures to improve productivity and workflow.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Planned and executed work with proper tools and materials to maximize efficiency.
  • Installed insulation, trim and other finishing touches.
  • Repaired damaged doors, windows and other structures.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Measured, cut and installed drywall, paneling and other materials.
  • Built and hung custom doors and frames.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Specialized in foundations, framing and finish carpentry.

Carpenter

Mcdonough Structures
01.2004 - 06.2006
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Read and interpreted blueprints to follow specifications of projects.
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Measured, drilled and sawed materials to perform successful home improvements.
  • Measured materials to determine sizes and quantity required for construction project.
  • Discarded debris and disposed waste to maintain cleanliness and quality standards.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
  • Collaborated with other construction workers to coordinate projects and streamline process.
  • Repaired damaged doors, windows and other structures.
  • Installed insulation, trim and other finishing touches.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Measured, cut and installed drywall, paneling and other materials.
  • Built and hung custom doors and frames.
  • Specialized in foundations, framing and finish carpentry.
  • Followed protocols and stayed organized to provide personal and teammate safety.

Sheet Metal Installer

ASI Sheetmetal
04.2001 - 01.2004
  • Planned and coordinated tasks and determined correct amount of material required to complete assignments.
  • Inspected individual parts, assemblies and installations for adherence to specifications and building codes.
  • Read job specifications to determine machine adjustments and material requirements.
  • Detected work piece defects and machine malfunctions.
  • Set up and performed maintenance on fab and machine shop machines.
  • Operated hand and power tools and heavy machinery safely.
  • Worked with tin, sheet iron and sheet copper.
  • Drilled and punched holes in metal for screws, bolts and rivets quickly and efficiently.

Education

High School Diploma -

Lisbon High School
Lisbon, IA
05.2000

Skills

  • Customer Relations
  • Remodels and New Construction
  • Project Oversight
  • Staff Training
  • Sales Leadership
  • Project Estimating
  • Analytical and Critical Thinker
  • Commercial Maintenance
  • Project Management
  • Adaptable and Flexible
  • Staff Management
  • Strategic Project Planning
  • Business Planning
  • Strategize Plans
  • Sales Oversight
  • Operations Management

Additional Information

I have had a buisness in a small town for 15 years.Have been able to keep a good reputation.We have worked in all aspects of construction residential and commercial.I have had numerous payroll employees and for consecutive years.

Timeline

Owner/Operator

Walton Construction
06.2008 - Current

Carpenter

Britt Constrcution
01.2006 - 01.2007

Carpenter

Mcdonough Structures
01.2004 - 06.2006

Sheet Metal Installer

ASI Sheetmetal
04.2001 - 01.2004

High School Diploma -

Lisbon High School
Nick Walton