Experienced Technical Program Manager with a 23-year track record overseeing numerous cost-plus and firm fixed price programs. Proven leadership skills in effectively managing program cost, schedule, and technical performance. Demonstrates commitment to achieving revenue targets while ensuring compliance with corporate initiatives. Highly skilled in leading and managing design-to-specification and build-to-print programs and teams, guiding them from proposal through test, qualification, and delivery. Brings extensive experience in composite structures and has held various engineering and leadership roles over the years.
Strengths
Skills
Cultivate robust customer relationships by consistently meeting expectations in terms of cost, schedule, and technical requirements.
Proficient in EVMS
Program kickoff, planning and development
Distinguished as a great leader and team player, adept at collaborating with both internal and external customers.
Management of proposals/ delegations/ negotiations
Empower and mentor others: Possess extensive experience in developing and leading high-performing teams.
Proficient with MS Office Excel, Word, Power Point and Projects
Hardworking and dedicated professional with an action-oriented approach, driven by tasks to achieve measurable results.
Highly skilled in time-phasing budgets, revenue forecasting, EACs, and delivering presentations to leadership.
Leading and orchestrating dynamic Internal and External Integrated Product Teams (IPTs).
Proficient in Risk Management and the development of effective mitigation plans.
Detail oriented and thorough
Leveraging lessons learned to enhance execution
Committed to Continuous Improvement, with a focus on lean initiatives and the reduction of waste.
Experienced in the development and implementation of Sales, Inventory, and Operations Planning (SIOP).
Overview
36
36
years of professional experience
6
6
years of post-secondary education
Work History
Sr. Program Manager
Albany Engineered Composites
Salt Lake City, UT
01.2021 - 01.2024
Lead the execution of a substantial $200M composite aerospace heavy-lift strategic helicopter program CH-53K. I played a key role in managing the production ramp-up of our deliverables
These included very complex assemblies; Left and Right Hand Sponsons, Tail Rotor Pylon, and Horizontal Stabilizer
It was a complex and impactful endeavor, overseeing crucial aspects of the project to ensure its success
Successfully demonstrated and passed MRL9 (Manufacturing Readiness Level 9) reviews with Sikorsky and the government, showcasing our industrialization capabilities.
Innovatively addressing challenges in the hiring and retention environment to boost productivity while onboarding new employees
Developed a standard of daily work content to effectively manage budgets, enhance efficiency, and improve gross margin as the program matures and multiple tool strings are in use.
Cultivated interpersonal skills by building positive relationships with others.
Demonstrated leadership skills in managing projects from concept to completion.
Sr. Program Manager
Albany Engineered Composites
Salt Lake City, UT
03.2019 - 02.2021
Managed the execution of the$60M+ / yr F-35 Program
Led the team to successfully qualify our Automated Fiber Placement Machine, Viper, in support of the Wing Box Skins (CTOL)
Established a new manufacturing cell and facilitated industrialization while overseeing significant capital projects
Collaborated with senior management to execute strategic plans, contributing to successful proposals and securing long-term contract wins
Program consisted of 227 unique parts and an aggressive schedule ramping to higher rates for CTOL, STOVL and CV
Successfully lead the team from a low performing financial performance and late to deliver, to better than expected financial performance and on time delivery.
Devised tools and benchmarks to improve team performance and monitor production.
Airbus Sr. Program Manager
Albany Engineered Composites
Salt Lake City, UT
03.2015 - 02.2019
Managed the design, development, qualification and production of the A380 Floor Bean Struts and the A330 Empennage strut for Airbus
Led the team through the phases of development, qualification, and ramp-up into production
Worked diligently to meet all GRAMS (Government-Industry Data Exchange Program) requirements, demonstrating effective industrialization.
Addressed and resolved technical, financial, and operational concerns by working with team members and directors.
Sr. Program Manager
Alliant Techsystems, ATK
Magna, UT
01.2002 - 08.2014
Directed multi-disciplined engineering, fabrication and testing teams
Accountable for technical success, cost, schedule, on time delivery, EBIT, continuous improvement and overall program execution
Led ATK team in successfully winning the 2009 NASA GSFC Contractor Excellence Award
Received prestigious ATK Gold Excellence Award for Program Management, 2008
Directed all technical, financial and schedule execution of programs including the development and test of portions of the James Webb Space Telescope
Planned all aspects of projects: design, analysis, development testing, qualification, fabrication of composite components and assemblies
Managed several successful programs meeting all ROI goals with contract values ranging from $100K to $20M
Successfully manage both commercial and government programs including EVMS reporting
Brought to closure challenging failure investigations to result in process improvements
Developed and captured new business opportunities to provide continued growth for business unit
Business Development
Alliant Techsystems, ATK
Magna, UT
01.2000 - 02.2002
Supported the development and shaping of potential targets during pursuit efforts, taking charge of multiple proposal teams to ensure the delivery of successful proposals
Identified opportunities through strategic networking and meetings with customers, subsequently developing capture plans for potential pursuits
Led the preparation of comprehensive proposals, encompassing estimating, generation of Basis of Estimate (BOE), delegation, schedule creation, and timely delivery to the customer
Formulated compelling value propositions to drive effective proposal strategy and actively engaged with customers to identify and develop winning opportunities.
Helped with planning and hosting of marketing events.
Assisted with development of event strategies and tactical plans to promote accomplishment of marketing goals.
Development / Test Engineer
Alliant Techsystems
Magna, UT
06.1988 - 02.2000
Held accountability for overseeing all facets of requirements verification and the formulation of test scenarios to showcase design compliance
Engaged in engineering activities focused on Titan IV, specifically involving rings and forward domes
Conducted tolerance studies related to the redundant O-ring compression in clevis and tang joints
Responsible for developing detailed piece part and assembly drawings
Formulated comprehensive test plans, designed and executed tests, and prepared associated reports