Mr. Ramos develops and disseminates project newsletters that serve the purpose of informing the affected community, elected officials, civic organizations, government agencies of project-related information including, but not limited to, completed work accomplishments and scheduled work activities. He attends and conducts meetings and presentations with affected community boards, businesses, and associations to discuss, gather, and resolve impacts due to construction activities. Mr. Ramos also conducts daily site visits to ensure housekeeping matters are adhered to and maintains a daily project-related complaint log.
Overview
1
1
Certification
Work History
Community Liaison/Inspector
New York City Housing Authority
Bronx and Manhattan
As part of NYCHA's overall Security Enhancement Project targeting 86 developments to provide Closed Circuit Television ("CCTV") and Layered Access Control ("LAC"), LiRo managed projects in the Bronx and Manhattan. This project consisted of the installation of security cameras and closed-circuit television, internet protocol based intercom system, secure entrance doors, and remote access control and all associated elements of a complete surveillance system at various NYCHA developments. These projects were performed under Job Order Contracts (JOC) administered through the Gordian Group with each development having its own proposal and Job Order number ($14 million)
CCTV at Various Locations
Program Management Services for Lead Abatement
New York City Housing Authority
LiRo-Hill is serving as Program Manager for NYCHA's Lead Abatement Program to support compliance with the HUD Agreement and the City Capital Action Plan pertaining to lead abatement including the planning, oversight, management, construction management and execution of lead abatement projects and related activities at multiple developments throughout the City of New York.
The scope of services being performed by LiRo-Hill's Team include coordination, management and/or support for all NYCHA designated aspects of the following activities for Assigned Projects, as well as providing Technical Assistance and Staff Augmentation services related to these activities:
Project Execution Plan (PEP)
Program Planning and Administration
Procurement Coordination, Management and Contracting
Construction Management
Financial Analysis, Management and Reporting
Metric Management
Stakeholder Outreach and HUD Required Processes
Oversight, coordination and Quality Control of Design and Construction
Municipal Filings, Project Closeout and Asset Management
LiRo-Hill
Community Liaison/Inspector
New York City Housing Authority
Amsterdam Houses, New York
For the past 10 years, LiRo-Hill has been performing on-call construction management services on a task-order basis for the NYCHA under four separate contracts that totaled $250 million. The properties all required that LiRo-Hill performed preconstruction and construction phase services. LiRo-Hill was responsible for prequalifying prime contractors, bid administration for the projects and ultimately entering into contract with the lowest responsible prime contractor. These projects also included a wide variety of construction management services such as: demolition, lead and asbestos abatement, cost-estimating, constructability review, contractor prequalification, project management, change orders, progress payments and project closeouts, amongst others. In the fourth on-call contract, among the projects was the Amsterdam Houses in Manhattan.
Community Liaison/Inspector
New York City Housing Authority
Edenwald Houses, NY
LiRo-Hill managed and coordinated the reconstruction of approximately 2,500 bathrooms in occupied apartments in 40 different buildings. This project included the replacement of steam distribution and condensate piping to improve efficient delivery and use of energy, as well as the replacement of 1,937 of its bathrooms, and replacement/modernization of electrical panel, riser, and wiring, wet wall demolition, new plumbing (domestic water risers, drains and waste line), floor leveling and tiles, bathtub and fixtures and drywall insulation were also part of Phase I of this work. LiRo-Hill handled contractor coordination, daily supervision, reports, inspection and acceptance of all bathrooms under our control. ($43.6 million)
Under this contract, LiRo-Hill performed work on a task order basis. Projects include both pre-construction and construction phase services and are located throughout New York City. Mr. Ramos was the Community Liaison/Inspector on multiple projects under this contract, including:
Marlboro Houses - LiRo-Hill provided construction management services to the 29-building development. The scope of work included 30 roof replacements (Building #9 included a separate Children's Center Roof), 29 buildings with extensive masonry repairs and balcony restoration being carried out on these buildings. There are four types of buildings at Marlboro, three high rise buildings, 25 low rise buildings, one boiler room/Building 29 and a Children's Center. Project specifics include:
Roof Replacement: Included the abatement of existing ACM at roof flashings and fascia/gravel stop, removal of all existing roofing and replacement with new three-ply BUR with SBS cap sheet and gravel flood coat to attain an R-value of R20.
Masonry Repairs of 29 Occupied Buildings: Included the removal and replacement of damaged brick at every facade to satisfy all LL11 inspections and violations, repair of mortar joints that were degraded by means of tuck pointing and abatement of any flashing's as required as ACM.
Balcony Restoration: Comprised of abatement of existing transite panel system as ACM, demolition and removal of existing concrete curb with new concrete curb poured in place, demo and removal of existing concrete topping, installation of new liquid applied waterproofing system on structural deck and new curb, installation of new galv angle at curb, restoration and re-installation of existing screen system, installation of new concrete topping at balcony floor, repairs of all degraded concrete at ceilings and columns and installation of new coating system on all ceilings, columns, and curb.
Structural concrete curbs were removed and replaced throughout three 16-story buildings coupled with the demolition and repair of all expansion joints totaling approximately 35 percent of the structural slab that is repaired. Work was conducted while maintaining egress for more than 384 apartments at these three buildings throughout construction.
CM/Build Requirements Contract
Community Liaison/Inspector
New York City Housing Authority
, NY
LiRo-Hill provided professional services to NYC Housing Authority to assist with boiler replacement projects at various housing developments throughout New York City. This included coordinating the construction activities in accordance with the contract documents; managing the logistics of the temporary boilers, utilities and site perimeter for temporary heating and hot water, in order for demolition of existing boiler plant to commence; reviewing and approving the progress schedules for the project; chairing the progress meetings with the contractors, subcontractors and NYCHA Divisions during the course of construction; processing monthly payments for contractors for contract and change order work; identifying and processing change orders during the course of construction; coordinating design bulletins with the consultants to be implemented during construction; generating uncompleted work and punch list work in order to qualify for substantial completion; coordinating the sign-offs required for DOB Certificate of Completion; scheduling controlled inspections after all construction activities are completed; coordinating and archiving closeout documents for final payments; and turnover of project files and server files to the Authority.
Multisite Boiler Replacement
Office Engineer
City University Construction Fund, Hunter College SPARC
Kips Bay Buildings, NY
LiRo-Hill is providing construction management/build services for the decanting of Hunter College's SPARC Building to the Hunter College Main Campus. This project is part of a broader program intended to transform the Hunter College Brookdale campus into a state-of-the-art life science and healthcare hub. Consisting of approximately 45,500 SF the renovations will occur within the occupied confines of the 17 story North Building. With renovations occurring over multiple areas on multiple floors over a condensed project duration there will be significant construction activity occurring throughout the North Building. LiRo-Hill will institute an Occupant Protection Plan to provide protection against hazards and nuisances inherent in the construction process. The plan will provide for barricades, signage, and other means to create safe conditions free of noise, dust and fumes produced by construction activities as well as ensure that life safety systems are maintained throughout the duration of construction.
Certification
OSHA 10 Certified
Timeline
Office Engineer
City University Construction Fund, Hunter College SPARC
Gang Analyst, Domestic Violence Liaison & Senior Citizen Alternate, Expungement Officer, CPS Liaison & CHA Liaison, Patrol Officer, and worked with Community Policing Unit teaching personal safety and awareness to a diverse body of students at Chicago Police DepartmentGang Analyst, Domestic Violence Liaison & Senior Citizen Alternate, Expungement Officer, CPS Liaison & CHA Liaison, Patrol Officer, and worked with Community Policing Unit teaching personal safety and awareness to a diverse body of students at Chicago Police Department
Constituent Services Liaison/Community Liaison at United States House of Representatives (USHOR)Constituent Services Liaison/Community Liaison at United States House of Representatives (USHOR)
Community Liaison/Community Coordinator at Mayor's Office of Immigrant AffairsCommunity Liaison/Community Coordinator at Mayor's Office of Immigrant Affairs