RAMSES DIANE LONLACK-CREARY

Punta Gorda,FL

Summary

Quick-learner professional with an ability to function at a high level in a wide variety of setting, seeing and maintaining full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills position as a Project Engineer/Project Manager involving Civil Engineering background. (C-43) West Basin Reservoir Package 4 - Civil Works features the construction of a sand embankment dam with a perimeter of approximately 16.3 miles and a separator dam of 2.8 miles in length. The reservoir will encompass approximately 10,500 acres and store 170,000 acre-feet of water when full.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Alternate Contractor Quality Control Manager /Senior Engineer

The Lane Construction Corporation
LaBelle, FL
05.2021 - Current
  • (C-43) West Basin Storage Reservoir Package 4 - Civil Works is $524 million project
  • Alternate Contractor Quality Control Systems Manager (ACQCSM) and Senior Field Engineer for (C-43) West Basin Storage Reservoir Package 4 - Civil Works
  • Assist Quality Control Manager with Three Phase Inspection (Preparatory, Initial and Final Phases Meeting)
  • Concrete Pre-Placement inspection checklist
  • Concrete Monitoring inspection
  • Oversee Different Structures with all Civil and Structural activities
  • Review project quantities and manage project quantity book
  • Assist with cost report management, including JD Edwards manipulations
  • Assist with project CPM management, including regular updates
  • Manage major subcontracts and input quantities into JD Edwards & Quantity Book
  • Prepare pay estimates for major subcontract
  • Interacted effectively with site engineering team and field staff to coordinate work that complied with design and construction documents.
  • Managed team in troubleshooting efforts that alleviated errors.
  • Identified any key changes to project that could affect cost, completion date and customer relationship.
  • Prepared documentation that would be used in requests for proposal.
  • Inspected raw materials and finished products to verify quality and disposed items that did not meet safety requirements.
  • Performed quality control audits on per-production supply chain, verifying continuity of raw materials.
  • Determined root cause of deviations and non-conforming results and implemented appropriate corrective and preventive actions throughout product development process.
  • Documented and executed detailed test plans and test cases and summarized and logged audit findings for reporting purposes.
  • Reviewed and validated quality requirements for manufacturing planning, supplier purchase orders and engineering specifications to meet contract compliance regulations.

Site Engineer/Contractor Quality Control Engineer

The Lane Construction Corporation
LaBelle, FL
05.2019 - 05.2021
  • (C-43) West Basin Storage Reservoir Package 4 - Civil Works is $524 million project
  • Contractor Quality Control Specialist (CQCS) and Site Engineer for (C-43) West Basin Storage Reservoir Package 4 - Civil Works
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Oversaw quality control and health and safety matters for construction teams.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Supervised and monitored daily tasks of three subcontractors.
  • Prepared and reviewed engineering specifications, scopes of work, schedules of payments and other documents.
  • Prepared site reports and organized subcontractor invoices, codes documentation and schematics.
  • Checked technical designs and drawings for adherence to standards.
  • Supervised and monitored daily tasks of three subcontractors.
  • Identified and resolved technical issues and design conflicts to minimize project delays and maintain tight schedules.

Project Engineer

Ragle Incorporated
Dallas, TX, Dallas
11.2018 - 05.2019
  • Construction of Stabilization of MSE Wall 301-307 on President George Bush Turnpike . Estimate cost $24 Millions
  • Assisted and supported project manager on various tasks such as collecting subcontractor daily activities report.
  • Prepared and reviewed engineering specifications, scopes of work, schedules of payments and other documents.
  • Determined and scheduled priorities as required to progress engineering work.
  • Assessed site conditions and collected measurements to make accurate project design determinations.
  • Completed daily construction tasks while ensuring safe working conditions, staying on budget and meeting project deadlines.
  • Generated change orders for project using estimating Ground Works
  • Reviewed contractor proposals and sets of drawings prepared by firms to identify missing information, generate questions and align budgets.
  • Evaluated change order requests in response to out of scope work activities and developing field conditions.

Associated Plant Engineer

LANE Construction Corporation
Justin, TX
04.2014 - 07.2015
  • Segment 3B of intersection 35 WEST improvement Project in Fort Worth, TX estimated cost of $2Billion.
  • Daily and monthly production report.
  • Developed time and cost estimates for our sub-contractor and suppliers.
  • Surveyed project sites to establish reference points to guide construction.
  • Prepared standard engineering computations, surveys and designs.
  • Controlled budget and established company efficiency policies to maximize profits.
  • Estimated project construction costs for different project.
  • Monitor construction site progress and managed issues that arose.
  • Prepared accurate specifications for purchase of materials and equipment for purchasing department.
  • Developed and organized records and maintenance reports for increased efficiency.
  • Perform Weekly Quantity input in JD Edwards
  • Evaluate schedule progress and update project schedule on regular basis with realistic timetable for future work items

Student Internship

LANE Construction Corporation
Nashville, TN
04.2012 - 08.2012
  • Expanding Highway I-40 East in Nashville, TN
  • Building 2 Twins Bridges in Orlando, Florida.
  • Assisted superintendent in preparation of quantity take-offs, engineering drawings, maps, and other related graphics as required to construct various transit related projects.
  • Participated in conductibility reviews.
  • Assisted in producing detail design calculations and sketches for materials of construction associated with projects while maintaining design and drafting standards.
  • Assisted company engineers as needed on project assignments.
  • Worked on submittal, quantities or procurement and general scheduling at job site.
  • Performed all aspects of internship while observing Lane's Core Values.

Education

Master of Science - Geotechnical Engineering

University of Oklahoma
Norman, OK
05.2021

Bachelor of Science - Civil Engineering

The University of Memphis
Memphis, TN
12.2013

Skills

  • Fluent both in speaking french and English
  • Primavera Software Scheduling
  • Microsoft PowerPoint
  • Construction Site Management
  • Design Standards
  • Quality Standard Management
  • Corrective Actions
  • Document Management System Software
  • Inspection Processes
  • Quality Assurance and Control

Certification

  • CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS- #784 License - SE9-10-20-00164
  • Bentley Institute - CERTIFICATE OF ACCOMPLISHMENT
  • Equipment/Safety Certification - Confined Space Entrant/Attendant
  • Equipment/Safety Certification - ASHA 10
  • Equipment/Safety Certification - Fall Protection
  • Equipment/Safety Certification - Adult First Aid/CPR/AED

Timeline

Alternate Contractor Quality Control Manager /Senior Engineer

The Lane Construction Corporation
05.2021 - Current

Site Engineer/Contractor Quality Control Engineer

The Lane Construction Corporation
05.2019 - 05.2021

Project Engineer

Ragle Incorporated
11.2018 - 05.2019

Associated Plant Engineer

LANE Construction Corporation
04.2014 - 07.2015

Student Internship

LANE Construction Corporation
04.2012 - 08.2012

Master of Science - Geotechnical Engineering

University of Oklahoma

Bachelor of Science - Civil Engineering

The University of Memphis
  • CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS- #784 License - SE9-10-20-00164
  • Bentley Institute - CERTIFICATE OF ACCOMPLISHMENT
  • Equipment/Safety Certification - Confined Space Entrant/Attendant
  • Equipment/Safety Certification - ASHA 10
  • Equipment/Safety Certification - Fall Protection
  • Equipment/Safety Certification - Adult First Aid/CPR/AED
RAMSES DIANE LONLACK-CREARY