Skilled electrician with proven experience and readiness for role. Strong focus on electrical installations, maintenance, and repair, ensuring safety and compliance with codes. Excellent at collaborating within teams and adaptable to changing project needs. Known for reliability and delivering quality results.
• Before starting a job task, I fill out a (JHA) Job Hazard Analysis.
It allows me to identify potential dangers and risks associated with that specific job task.
• Gather the tools and materials need for the job task. Inspect all hand tools , power tools and ladders, etc, to ensure proper use of them.
• Inspect all man lift, scissor lift ,trenchers, etc, with an inspection check out form.
• Custom cut brackets for conduit and cable tray supports.
• Bend,cut and thread conduit for the installation.
• Custom cut the cable tray for the installation.
• Pull power cable to its destination and test (Megger) the cable 480V and above to ensure the cables are ready to terminate.
• Pull low voltage cable to it destination from PLC/DCS to field junction boxes and to field devices.
• Terminate low voltage cable using the wiring drawing/ loop drawing and a point to point (Continuity check) for proper installation.
• Installing Duct banks using proper plot plan drawing to ensure the proper size and spacing of conduits.
• Used a trencher for installing grounding to ground off equipment and structures tied to the ground grid using cadweld or C-crimps.
• Mounting Junction boxes to brackets and penetrations to the junction boxes for conduit or cable entries.
• Before starting a job task, I fill out a (JHA) Job Hazard Analysis.
It allows me to identify potential dangers and risks associated with that specific job task.
• Gather the tools and materials need for the job task. Inspect all hand tools , power tools and ladders, etc, to ensure proper use of them.
• Inspect all man lift, scissor lift ,trenchers, etc, with an inspection check out form.
• Custom cut brackets for conduit and cable tray supports.
• Bend,cut and thread conduit for the installation.
• Custom cut the cable tray for the installation.
• Pull power cable to its destination and test (Megger) the cable 480V and above to ensure the cables are ready to terminate.
• Pull low voltage cable to it destination from PLC/DCS to field junction boxes and to field devices.
• Terminate low voltage cable using the wiring drawing/ loop drawing and a point to point (Continuity check) for proper installation.
• Installing Duct banks using proper plot plan drawing to ensure the proper size and spacing of conduits.
• Used a trencher for installing grounding to ground off equipment and structures tied to the ground grid using cadweld or C-crimps.
• Mounting Junction boxes to brackets and penetrations to the junction boxes for conduit or cable entries.