I’m proficient with Excel, SWMS, Maximo, Oracle Primavera P6 and SAP Business Objects. I have experience with Work Order planning, scheduling of plant maintenance, Engineering Work Management and License renewal.
Overview
49
49
years of professional experience
Work History
License Renewal, Principal Technical Specialist
Enercon
01.2022 - Current
Administer Work Order generation, assignment, tracking, competition, and archival
Identifying component material and environment
Coordinating available inspections based on plant conditions, schedule and resource loading
Identifying system / component availability with component and system availability, support discipline’s available for inspection
One Time inspections
Age Management
Selective Leaching
Internal / external inspection
Verifying targeted component has replacement parts to ensure inspection can be scheduled
Reviewing inspection documentation
Generating targeted component inspection requirement documentation forms
Verifying component location / correct material and environment
Engineering Work Management / Sr. Scheduler
Arizona Public Services
01.2013 - 01.2021
Attend Site Work Week Management Meetings and provide advocacy for engineering staff actions that are deemed important to stay within regulatory compliance and adhere to schedule protocol
Develop accurate detailed engineering on-line and outage schedules that support outage milestones and clearly identify engineering resources and responsibilities
Manage Engineering CAP issues
Primary Engineering Work Management interface for Engineering Programs to develop Section XI, FAC, Zone and Balance of Plant In-service Inspections (ISI)
Interface and coordinate with other site disciplines to facilitate engineering documentation work flow and schedules
RP Planning / ALARA Planning Specialist
APS (PVNGS)
01.2000 - 01.2012
My work assignment responsibilities included Radiological Work planning both outage and on-line
This requires a risk assessment of scheduled significant radiological work orders to determining the appropriate radiological controls and Radiation Exposure Permit (REP) assignment in the Site Work Management System (SWMS)
Review site schedules using the Primavera 6 (P6) scheduling tool to establish RP resource commitments, identify work scope details, and coordinate schedule inputs for associated departmental activities
Develop P6 reports for export to PVNGS intranet websites
Assess station work schedules with Operations, Maintenance and various disciplines at scheduled Work Management meetings
Modify site schedule logic to ensure schedule sequencing supports ALARA (As Low As Reasonably Achievable) exposure concepts
Ensure all work order activities flagged as RP support are properly evaluated; coded and appropriate resources are assigned in site schedules
Coordinate with work groups to resolve scheduling adherence issues
Interface and coordinate with all site disciplines at all levels to develop work plans for radiological significant evolutions
Develop Radiation Exposure Permits, ALARA Plans, In-Progress Reviews and Post Job Reviews in compliance with regulatory requirements
Apply Lessons Learned and Operational Experience to radiological control documents to improve radiological safety and ensure exposures are maintained ALARA
Monitor work activities to identify deficiencies and determine effectiveness of applied radiological controls
Incorporate 'lessons learned' into Radiation Protection documents and processes and ensure they are incorporated into future activities
Design and evaluate radiation shielding applications
Design, develop and implement radiological engineering controls to minimize exposure to radiation and control the spread of radioactive contamination
Collaborate with Operations to develop and implement system flush plans to remove radiation trapped in system piping hot spots
RPT3: ALARA / RP Planning
APS
08.1991 - 08.2000
RPT3 assigned to RP Operations Shift Support
RPT3 assigned to RP Special Projects Team
Assigned to ALARA / RP Planning, Temporary Outage Leader for U2R11, U1R12, U3R13 and U3R14
RP Balance of Plant Lead / RP Sr. Tech.
Bartlett Nuclear
01.1991 - 01.1998
Responsible for coordination of Radiation Protection BOP activities, and ensuring that PVNGS procedures and ALARA concepts were followed
Supervisor
Health Physics Technical Services
08.1987 - 10.1987
Supervisor, responsible for H.P.T.S
Personnel scheduling and Drywell job coverage
Sr. H.P. Tech.
Applied Radiological Controls
05.1987 - 07.1987
BOP job coverage
Co. Associate / ALARA Supervisor
Hydro Nuclear Services
01.1987 - 03.1987
Assist utility supervision
Westinghouse H.P. Supervisor / Co. Associate
Hydro Nuclear Services
09.1986 - 12.1986
Supervise Westinghouse Health Physics Operations
Procedure Writer / Co. Associate
Hydro Nuclear Services
08.1986 - 09.1986
Outage pre-planning; writing job guidelines tailored to activities scheduled for the unit 2 Outage
Sr. H.P. Tech
Rad Services
07.1986 - 08.1986
BOP job coverage
Outage Coordinator
SALTEC
01.1985 - 03.1986
Special Projects Health Physics Liaison assigned to Outage Management
I was responsible for providing radiological expertise, in relation to outage scheduling
Health Physics / Chem. Manager
American Nuclear Services Corp.
01.1985 - 07.1985
Coordinate A.N.S.C
Projects and programs
Drywell Operations Supervisor
American Nuclear Services Corp.
01.1984 - 01.1985
Responsible for coordination of Health Physics activities, and ensuring that G.P.C
Procedures and ALARA concepts were followed
Drywell Operations Supervisor
American Nuclear Services Corp.
01.1984 - 08.1984
Responsible for coordination of Health Physics activities, and ensuring that G.P.C
Procedures and ALARA concepts were followed
ANSC Site Supervisor
American Nuclear Services Corp.
11.1981 - 11.1983
Duties included BOP coverage and scheduling, Procedure writing
Lead Sr
Tech
For 1981 U/2 D/W outage, 1982 U/1 outage, and 1982 U/2 D/W outage
D/W Coordinator for 1983 U/1 and U/2 outages
Sr
H.P
Tech
Assigned to research Recirc Pipe replacement evolutions for dose assessment considerations
Sr. H.P. Tech
Sasser Consulting Ser.
09.1981 - 10.1981
BOP job coverage, RCP loop splitter removal, count room and Rad Waste evolutions
Sr. H.P. Tech. / Lead D/W Tech.
Institute for Resource Management
04.1981 - 06.1981
BOP job coverage
Dry Well job coverage
Sr. H.P. Tech.
Sasser Consulting Service
10.1980 - 03.1981
BOP job coverage, and count room
Senior H.P. Tech.
Florida Power and Light
11.1978 - 11.1980
BOP job coverage, inst
Calibration count room, Radiation Work Permit Writing, dosimetry and chemistry
Senior H.P. Tech.
Institute for Resource Management
08.1978 - 10.1978
BOP job coverage
Site Coordinator
Institute for Resource Management
03.1978 - 06.1978
Responsible for IRM personnel assigned to outage
Sr
H.P
Tech., Balance Of Plant job coverage
Senior Health Physics / Chemistry Technician
Institute for Resource Management
10.1977 - 11.1977
Duties included Rad Waste and count room
Senior Health Physics Technician
Nuclear Support Services
07.1977 - 09.1977
Duties included drywell, refuel floor and count room
Senior Health Physics / Chemistry Technician
RAD Services
01.1977 - 03.1977
Duties included rad waste and effluent monitoring
Senior Health Physics Technician
Health Physics Services
11.1976 - 12.1976
Duties included refuel floor and steam generators
Senior H.P. Tech.
Institute for Resource Management
07.1976 - 08.1976
S/G job coverage
Jr. H.P. Tech.
Institute for Resource Management
12.1975 - 02.1976
D/W job coverage
Education
High School Diploma -
Vanguard High School
Ocala, FL
Skills
I’m proficient with Excel, SWMS, Maximo, Oracle Primavera P6 and SAP Business Objects I have experience with Work Order planning, scheduling of plant maintenance, Engineering Work Management and License renewal
Timeline
License Renewal, Principal Technical Specialist
Enercon
01.2022 - Current
Engineering Work Management / Sr. Scheduler
Arizona Public Services
01.2013 - 01.2021
RP Planning / ALARA Planning Specialist
APS (PVNGS)
01.2000 - 01.2012
RPT3: ALARA / RP Planning
APS
08.1991 - 08.2000
RP Balance of Plant Lead / RP Sr. Tech.
Bartlett Nuclear
01.1991 - 01.1998
Supervisor
Health Physics Technical Services
08.1987 - 10.1987
Sr. H.P. Tech.
Applied Radiological Controls
05.1987 - 07.1987
Co. Associate / ALARA Supervisor
Hydro Nuclear Services
01.1987 - 03.1987
Westinghouse H.P. Supervisor / Co. Associate
Hydro Nuclear Services
09.1986 - 12.1986
Procedure Writer / Co. Associate
Hydro Nuclear Services
08.1986 - 09.1986
Sr. H.P. Tech
Rad Services
07.1986 - 08.1986
Outage Coordinator
SALTEC
01.1985 - 03.1986
Health Physics / Chem. Manager
American Nuclear Services Corp.
01.1985 - 07.1985
Drywell Operations Supervisor
American Nuclear Services Corp.
01.1984 - 01.1985
Drywell Operations Supervisor
American Nuclear Services Corp.
01.1984 - 08.1984
ANSC Site Supervisor
American Nuclear Services Corp.
11.1981 - 11.1983
Sr. H.P. Tech
Sasser Consulting Ser.
09.1981 - 10.1981
Sr. H.P. Tech. / Lead D/W Tech.
Institute for Resource Management
04.1981 - 06.1981
Sr. H.P. Tech.
Sasser Consulting Service
10.1980 - 03.1981
Senior H.P. Tech.
Florida Power and Light
11.1978 - 11.1980
Senior H.P. Tech.
Institute for Resource Management
08.1978 - 10.1978
Site Coordinator
Institute for Resource Management
03.1978 - 06.1978
Senior Health Physics / Chemistry Technician
Institute for Resource Management
10.1977 - 11.1977
Senior Health Physics Technician
Nuclear Support Services
07.1977 - 09.1977
Senior Health Physics / Chemistry Technician
RAD Services
01.1977 - 03.1977
Senior Health Physics Technician
Health Physics Services
11.1976 - 12.1976
Senior H.P. Tech.
Institute for Resource Management
07.1976 - 08.1976
Jr. H.P. Tech.
Institute for Resource Management
12.1975 - 02.1976
High School Diploma -
Vanguard High School
Similar Profiles
Brian BundotichBrian Bundotich
Field service engineer at EnerconField service engineer at Enercon