Dynamic Project Manager with extensive experience at KPS Global, adept at workflow planning and project tracking. Proven ability to meet deadlines while ensuring safety and quality. Skilled in feasibility analysis and schedule management, fostering open communication and collaboration among stakeholders to drive project success. OSHA 30 certified, committed to maintaining high standards.
-Supervised operations of concrete pumps during scheduled pours.
-Coordinate team efforts to ensure readiness for upcoming pour dates.
-Ensure cleanliness of job site upon project completion.
-Performed patch work and hold down strap installations.
-Reviewed and redlined prints & identify placement of hold-down straps.
-Demo concrete - executed concrete backfill
.
-Utilized hydraulic jacks for lifting bridges and installing steel beam towers.
-Conducted concrete placement on elevated freeway section.
-Completed fiber wrapping in designated zones.
-Prepared steel surfaces through sandblasting prior to concrete pouring.
-Executed layout and tied rebar efficiently.
-Performed epoxy injection for underside bridge repairs.
-Expanded concrete building columns
-Performed installation and maintenance of PT cables.
-Conducted maintenance and restoration of stadium infrastructure.
-Demo concrete , poured back concrete
-Enhanced structural integrity using fiber wrapping techniques.
-Reviewed architectural drawings.
-Proficient in using hand tools and operating lifts.
-Environmental crew
-Adhered to OSHA standards consistently.
-Assisted coating team.
- helped tie in crew
-Supported welding crew to ensure project efficiency.
-Operated and managed heavy machinery efficiently.
Work flow planning
OSHA 30