Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Robert Munoz

Fort Worth ,Tx

Summary

Dynamic Project Manager with extensive experience at KPS Global, adept at workflow planning and project tracking. Proven ability to meet deadlines while ensuring safety and quality. Skilled in feasibility analysis and schedule management, fostering open communication and collaboration among stakeholders to drive project success. OSHA 30 certified, committed to maintaining high standards.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Project Manager

KPS Global
09.2023 - Current
  • Managed projects from procurement to commission.
  • Planned, designed, and scheduled phases for large projects.
  • Identified plans and resources required to meet project goals and objectives.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Monitored project progress, identified risks and took corrective action as needed.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
  • Proved successful working within tight deadlines and a fast-paced environment.

Superintendent

KPS Global
09.2021 - 2023
  • Maintained safety onsite and upheld all OSHA regulations by Action.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Inspected equipment and tools used for safe operation.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Assistant Superintendent

Metroplex Concrete Construction
01.2021 - 09.2021

-Supervised operations of concrete pumps during scheduled pours.


-Coordinate team efforts to ensure readiness for upcoming pour dates.


-Ensure cleanliness of job site upon project completion.


-Performed patch work and hold down strap installations.


-Reviewed and redlined prints & identify placement of hold-down straps.

Field Tech Leadman

Structural Technologies
01.2017 - 01.2020

-Demo concrete - executed concrete backfill

.

-Utilized hydraulic jacks for lifting bridges and installing steel beam towers.


-Conducted concrete placement on elevated freeway section.


-Completed fiber wrapping in designated zones.


-Prepared steel surfaces through sandblasting prior to concrete pouring.


-Executed layout and tied rebar efficiently.


-Performed epoxy injection for underside bridge repairs.


-Expanded concrete building columns


-Performed installation and maintenance of PT cables.

Field Technician

Delta Structural Technology
01.2015 - 06.2016

-Conducted maintenance and restoration of stadium infrastructure.


-Demo concrete , poured back concrete


-Enhanced structural integrity using fiber wrapping techniques.


-Reviewed architectural drawings.


-Proficient in using hand tools and operating lifts.

Laborer

Tcb Pipeline
06.2013 - 01.2014

-Environmental crew


-Adhered to OSHA standards consistently.


-Assisted coating team.


- helped tie in crew


-Supported welding crew to ensure project efficiency.


-Operated and managed heavy machinery efficiently.

Education

High School Diploma -

Fossil Ridge
Fort Worth

Skills

Work flow planning

Certification

OSHA 30

Timeline

Project Manager

KPS Global
09.2023 - Current

Superintendent

KPS Global
09.2021 - 2023

Assistant Superintendent

Metroplex Concrete Construction
01.2021 - 09.2021

Field Tech Leadman

Structural Technologies
01.2017 - 01.2020

Field Technician

Delta Structural Technology
01.2015 - 06.2016

Laborer

Tcb Pipeline
06.2013 - 01.2014

High School Diploma -

Fossil Ridge
Robert Munoz