January 1999-March 2003- Master Control Operator
- Prepped tapes for air by inserting commercial spots and well as the DTMF Tone for Affiliate commercial insertion.
- Worked with Traffic in listing the current commercials within the Programs and created a Change List to place commercials in locations for the maximum potential revenue.
- Provided basic PM procedures in the equipment such as head cleaning and ensuring full functionally of the controls.
March 2003-April 2014
- Transferred into the Broadcast Engineering Department where I increased the level of services performed. Under the guidance of the original Engineer, learned more in-depth maintenance procedures such as video heads replacements, calibrations and other critical task.
- Aided in the design and construction of a new Master Control Room which incorporated the channels first level of automation to the facility.
- Worked with the design and installation of a full studio to include a control room, a lighting grid, camera positions and basic sets.
- Worked on a variety of additional projects to include Playout Server upgrades, Video Servers implementation, Master Control Monitor Wall upgrade and several others upgrades as needed.
- Reported equipment problems, checked on repairs, and made emergency repairs to equipment as necessary.