Summary
Overview
Work History
Education
Skills
Timeline
Generic

Ronald Henderson

Cedar Grove,NJ

Summary

Competent Telecommunications maintainer bringing 6 years of experience installing voice, data and other systems. Expert at equipment configuration and troubleshooting. Well-organized and resourceful with superior work ethic.

Proven ability to learn quickly and adapt to new situations.

Passionate about learning and committed to continual improvement.

Overview

16
16
years of professional experience

Work History

Comm Maintainer Kit Room Special Appointment

Metro North Railroad
10.2019 - Current
  • · Responsible for maintaining the daily operations of the Communications Control Center.
  • · Responsible for managing the Network Management System.
  • · Primary person responsible for installing, configuring, documenting and maintaining all communications equipment associated with DS0 and T-1 Circuits in the Kitroom.
  • · Works closely with information technology, signal, and power department to troubleshoot and maintain Metro North’s critical circuits.
  • · Works with field Maintainers to troubleshoot various circuits throughout Metro Norths territory.
  • · Manages the Nice Voice recorder system and provides audio recordings when requested.
  • · Works closely with the Wire Chief and provides assistance when necessary.

Communication Installer/Maintainer

Metro North Railroad
08.2017 - 10.2019
  • Tested cables using tools such as volt-OHM meters, OTDRs for , T-Berd for DS1 Testing, Greenlee Sidekicks for cable fault locating, Berry Test set meter for point to point testing.
  • Installing and terminating cable throughout Grand Central Terminal.
  • Performed preventive maintenance of telecommunications equipment.
  • Installed data and telephone cable lines between inside and outside copper and fiber plants.

Lineman

MTA Metro-North Railroad
03.2017 - 08.2017
  • Removed old poles and hardware and replaced with new equipment.
  • Observed company safety rules and regulations to minimize workplace accidents.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
  • Worked well in a team setting, providing support and guidance.

Track Worker

MTA Metro-North Railroad
05.2007 - 03.2017
  • Completed important repairs on tracks to achieve maintenance targets.
  • Repaired 787 miles of damaged track across different types of terrain.
  • Set machines to make accurate and precise adjustments to various track parts for durability, functionality and safe operations.
  • Patrolled assigned track sections so damaged or broken tracks could be located and reported.

Education

Associate of Applied Science - Electrical, Electronics Engineering Technologies

Westchester Community College
Valhalla, NY
05.2014

Skills

  • Troubleshooting systems
  • Device Installation
  • Configuring equipment
  • Well versed is Visio drawing and diagrams, Excel, and Word

Timeline

Comm Maintainer Kit Room Special Appointment

Metro North Railroad
10.2019 - Current

Communication Installer/Maintainer

Metro North Railroad
08.2017 - 10.2019

Lineman

MTA Metro-North Railroad
03.2017 - 08.2017

Track Worker

MTA Metro-North Railroad
05.2007 - 03.2017

Associate of Applied Science - Electrical, Electronics Engineering Technologies

Westchester Community College
Ronald Henderson